Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1651 - 1680 of 2978

Full-Text Articles in Environmental Monitoring

Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc. Jul 2022

Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Monitoring Whitebark Pine Stand Health In The Central Washington Cascades, Nancy H. Parra, Teresa J. Lorenz, Taza D. Schaming, Alison Scoville Jul 2022

Monitoring Whitebark Pine Stand Health In The Central Washington Cascades, Nancy H. Parra, Teresa J. Lorenz, Taza D. Schaming, Alison Scoville

Student Published Works

Whitebark pine (Pinus albicaulis) plays a vital role in colonizing newly disturbed areas, providing shade for other tree species to germinate, and supplying food for a variety of birds and mammals, such as Clark’s Nutcrackers (Nucifraga columbiana) and grizzly bears (Ursus arctos horribilis). Decline of whitebark pine populations has been attributed to several factors, including white pine blister rust (Cronartium ribicola), mountain pine beetle (Dendroctonus ponderosae) outbreaks, and fire exclusion. In 2009, the U.S. Forest Service began to install permanent plots in whitebark pine stands in Washington and Oregon as …


Appendix B - Data Validation Reports, Pioneer Technical Services, Inc. Jul 2022

Appendix B - Data Validation Reports, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2022

Final Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services Jul 2022

Appendix D Laboratory Analytical Full Data Packages, Pace Analytical Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 32 – Corra-2 Dumps (Dated June 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) Draft Surface Water Surface Water Compliance And Interpretation Technical Memorandum (Dated May 12, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 50 – Zelia (Dated June 22, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 50 – Zelia (Dated June 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene Jun 2022

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump (Dated June 23, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc. Jun 2022

Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc. Jun 2022

Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene Jun 2022

Approval On The Draft Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Piezometer Installation And Monitoring Well Repair Plan (Dated June 10, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc. Jun 2022

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union, Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame- Sage], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jun 2022

2022 - Final Revised - Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Ii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump., Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Revised Retention And Detention Discharge Management Report (Dated April 1, 2022), Nikia Greene Jun 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Revised Retention And Detention Discharge Management Report (Dated April 1, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclaimed Areas Maintenance And Monitoring Plan (Dated June 15, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty Jun 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union (Former Mckinley School), Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame-Sage (Golden Estates #3) (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #6 [Covering Stodden Park, Baptist Student Union (Former Mckinley School), Minor Park, Blacktail Lane, Earth Lane, Fleecer Drive, Boulevard (Josette), Boulevard (Lasalle), And Sesame-Sage (Golden Estates #3) (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field] (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field] (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels (Dated June 13, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels (Dated June 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #5 [Covering Longfellow Ball Fields, Peace Park, Rocker Park, Racetrack Park, C Street, Jfk Park, And Rickey Park], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens] (Dated June 14, 2022), Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #4 [Covering Tot Lot, Clark Park, Huron Tennis Courts, Father Sheehan Park, Community Garden, And Lexington Gardens] (Dated June 14, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park] (Dated June 14, 2022)., Nikia Greene Jun 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #3 [Covering Koprivica Park, Mcgruff Park, Skate Park, Belmont Park, Rock Park, And Hanna Park] (Dated June 14, 2022)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels), Mike Mcanulty Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), & Walkerville Park (Alley Of North Main & Alley Of West Daly)], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #1 [Covering Walkerville Ball Park, Antimony Ball Field, Walkerville Park (Walkerville Drive & Ryan Road), Walkerville Park (5th & Transit), & Walkerville Park (Alley Of North Main & Alley Of West Daly)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field], Pioneer Technical Services, Inc. Jun 2022

Final 2022 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #2 [Covering Scown Field, Cherokee Park, Copper/Emmet, West Side Subdivision Park, Chester Steele Park, And Cinders Field], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.