Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring Commons™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1111 - 1140 of 3056

Full-Text Articles in Environmental Monitoring

Silver Bow Creek Butte Area Npl Site 3rd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson Dec 2023

Silver Bow Creek Butte Area Npl Site 3rd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89- 039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Dec 2023

Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Uncontrolled Surface Flow Areas Draft Remedial Design Work Plan (Rdwp), Woodard & Curran Dec 2023

Butte Priority Soils Operable Unit Uncontrolled Surface Flow Areas Draft Remedial Design Work Plan (Rdwp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uncontrolled Surface Flow Areas Pre-Design Investigation Work Plan, Woodard & Curran Dec 2023

Draft Uncontrolled Surface Flow Areas Pre-Design Investigation Work Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp), Woodard & Curran Dec 2023

Draft Final Bpsou 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Radiation Exposure Calibration Of The Al2o3:C With Radium-226 And Cesium-137 Using The Osl Method, Selma Tepeli Aydin Dec 2023

Radiation Exposure Calibration Of The Al2o3:C With Radium-226 And Cesium-137 Using The Osl Method, Selma Tepeli Aydin

All Theses

Optically stimulated luminescence (OSL) dosimetry was utilized to calibrate Al2O3:C powder dosimeters, available commercially as the nanoDot® from Landauer Inc., and compare the dosimeter response to radium-226 (226Ra) and cesium-137 (137Cs). The signal from the OSL was quantified using a microSTARii® OSL reader also produced by Landauer Inc. Dose-response curves were developed for 226Ra and 137Cs experiments (5 dosimeters each) at thirteen absorbed doses. Individual dosimeter response was tracked by serial number. Linear regression analysis was performed to determine if there were significant differences between the intercepts of the …


The Tidal Prism, Viable Eelgrass Habitat, And The Effects Of Sea Level Rise In Morro Bay, Kaden A. Caliendo Dec 2023

The Tidal Prism, Viable Eelgrass Habitat, And The Effects Of Sea Level Rise In Morro Bay, Kaden A. Caliendo

Master's Theses

The tidal prism, or the volume of water exchanged from the sea to an estuary from mean low to mean high tide, influences system hydrodynamics and ecological functioning. Since 1884, the tidal prism in Morro Bay, California has been estimated to be decreasing over time due to sedimentation from upstream practices. What is the current tidal prism in Morro Bay and how will that change with sea level rise? How will eelgrass respond to rising sea levels?

For this study, inexpensive tidal gauges were deployed at four locations in Morro Bay from March to August 2023 to measure spatially varying …


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Nov 2023

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2024 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan. Consent Decree - Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2023

Silver Bow Creek Butte Area Npl Site 2024 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan. Consent Decree - Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Soil) - Silver Bow Montessori, Environmental Resource Management (Erm) Nov 2023

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Soil) - Silver Bow Montessori, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Update, Butte Mine Flooding Operable Unit, Quality Assurance Project Plan, Ver 3, And Crosswalk, Ted Duaime Nov 2023

2024 Update, Butte Mine Flooding Operable Unit, Quality Assurance Project Plan, Ver 3, And Crosswalk, Ted Duaime

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Brw/Belgrade Borrow Submittal, Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Brw/Belgrade Borrow Submittal, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 (Version 2) [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Nov 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 (Version 2) [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) New And Mahoney Remedial Action Work Plan (Rawp) Request For Change, Mike Mcanulty Nov 2023

Butte Priority Soils Operable Unit (Bpsou) New And Mahoney Remedial Action Work Plan (Rawp) Request For Change, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 (Version 2) [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 (Version 2) [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2024 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Woodard & Curran Nov 2023

Silver Bow Creek Butte Area Npl Site 2024 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #1, Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty Nov 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Ur-19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2023

Final 2023 Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Dated November 2, 2023), Nikia Greene Nov 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Dated November 2, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter Butte Priority Soils Operable Unit (Bpsou) Grove Gulch Sedimentation Bay 95% Remedial Design (Dated September 22, 2023), Nikia Greene Nov 2023

Comment Letter Butte Priority Soils Operable Unit (Bpsou) Grove Gulch Sedimentation Bay 95% Remedial Design (Dated September 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Peoples Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Silver Bow Montessori School, Environmental Resource Management (Erm) Nov 2023

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Silver Bow Montessori School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Silver Bow Montessori School, Environmental Protection Agency Nov 2023

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Silver Bow Montessori School, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Nov 2023

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2023

Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan, 2024 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology Nov 2023

Quality Assurance Project Plan, 2024 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.