Open Access. Powered by Scholars. Published by Universities.®

Articles 91 - 120 of 384

Full-Text Articles in Environmental Health and Protection

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed (Ur) Sites Ur-13 Site Evaluation Summary Report (Sesr) (November 1, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed (Ur) Sites Ur-13 Site Evaluation Summary Report (Sesr) (November 1, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Jul 2025

Re: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Subdrain Data Summary Report (Dated April 30, 2025), Emma Rott Jul 2025

Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Subdrain Data Summary Report (Dated April 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jun 2025

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc. Jun 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated May 27, 2025), Molly Roby Jun 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated May 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report (Dated April 23, 2025), Molly Roby Jun 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report (Dated April 23, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites: Bres No. 158 (Waste Rock Dump) Remedial Action Work Plan (Rawp), Mike Mcanulty Jun 2025

Re: Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites: Bres No. 158 (Waste Rock Dump) Remedial Action Work Plan (Rawp), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated May 15, 2025), Molly Roby Jun 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated May 15, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated May 15, 2025), Molly Roby Jun 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated May 15, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby Jun 2025

Re: Approval Letter With Comment For The Butte Priority Soils Operable Unit (Bpsou) 2025 Revised Draft Final Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp) (Dated June 2, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jun 2025

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Multi-Pathway Residential Metals Abatement Program (Rmap) Plan (Dated March 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Bres No. 158 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated March 28, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated February 26, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels) (Dated February 26, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2023 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2024 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. May 2025

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby Apr 2025

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Insufficiently Reclaimed Sites Bres No. 158 - Waste Rock Dump Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Mar 2025

Draft Final Bpsou Insufficiently Reclaimed Sites Bres No. 158 - Waste Rock Dump Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons (Btl) System – Third Quarter 2024 (Dated December 23, 2024), Emma Rott Mar 2025

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons (Btl) System – Third Quarter 2024 (Dated December 23, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc. Mar 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott Feb 2025

Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated December 30, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.