Open Access. Powered by Scholars. Published by Universities.®

Articles 181 - 210 of 384

Full-Text Articles in Environmental Health and Protection

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2023

Silver Bow Creek Butte Area Npl Site 2nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 17 – Paymaster, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Work Plan, Mike Mcanulty, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit (Bpsou) Borrow Amendment Work Plan, Mike Mcanulty, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed (Ir) Sites Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E. Aug 2023

Bnsf And Union Pacific Butte Priority Soils Operating Unit Activity Report - July 2023 Unilateral Administrative Order-Docket No. Cercla 08-2011-0011 Kj 2399019*00, Doug Brannan P.E.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites – Field Sampling Plan (Fsp) Ur 42 – Area Near Walkerville Playground, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Pre-Design Investigation Work Plan Blacktail Creek Riparian Actions, (Dated August 14, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 134 – Star West Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 17 – Paymaster (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 66 – West Ruby Dump (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 48 – Old Glory West (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 174 – Buffalo Ditch (Dated July 25, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Jul 2023

Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed (Ir) Sites Colorado Dump – West Lot Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene Jul 2023

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated March 30, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites, Mike Mcanulty, Pioneer Technical Services, Inc. Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Field Xrf To Laboratory Correlation And Regression Analysis Procedure For Unreclaimed (Ur) And Insufficiently Reclaimed (Ir) Sites, Mike Mcanulty, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Jun 2023

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #9 [Covering Centerville Skating Rink, Belmont Senior Citizens Center, High Altitude Skating Rink, Missoula Gulch Ballfield Play Area, Mac Facilities, Butte Family Ymca, Church Of Christ, And Montana Tech South Campus] (Dated June 22, 2023), Nikia Greene Jun 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #9 [Covering Centerville Skating Rink, Belmont Senior Citizens Center, High Altitude Skating Rink, Missoula Gulch Ballfield Play Area, Mac Facilities, Butte Family Ymca, Church Of Christ, And Montana Tech South Campus] (Dated June 22, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2023

Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2023

Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jun 2023

Final Butte Priority Soils Operable Unit (Bpsou) 2021 Unreclaimed Sites Sampling – Ur-39 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.