Open Access. Powered by Scholars. Published by Universities.®
Environmental Health and Protection Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
- Keyword
-
- Priority Soils (416)
- Metals Abatement (228)
- Field Sampling (169)
- Unreclaimed Sites (152)
- Quality Assurance (132)
-
- Consent Decree (130)
- Groundwater (104)
- Insufficiently Reclaimed Sites (102)
- Indoor Dust (74)
- Berkeley Pit (67)
- Soil Sampling (63)
- Butte Treatment Lagoon (61)
- Groundwater Monitoring (55)
- Smelter Area (53)
- Maintenance (52)
- Stormwater (52)
- Lead (51)
- Blacktail Creek (50)
- Surface Water Monitoring (50)
- Arsenic (44)
- Maintenance Report (44)
- Mercury (42)
- Butte Reduction Works (41)
- Silver Bow Creek (40)
- Monitoring (39)
- Residential Metals Abatement (39)
- Diggings East (37)
- Remedial Action (30)
- Butte (29)
- Crosswalk (29)
- Publication Year
- File Type
Articles 91 - 120 of 1880
Full-Text Articles in Environmental Health and Protection
Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dumps, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance - September 2026, Atlantic Richfield Company
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance - September 2026, Atlantic Richfield Company
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – First Quarter 2026, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to …
Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2nd Quarter 2026 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated August 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-51 –Area Near Bres No. 50 – Zelia And Mountain Con Mine, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: 2026 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate-90, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-52 Area West Of Bres No. 133 – Dexter Mill, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Backfill and Cover Material Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct sampling and geotechnical characterization activities on import borrow and other externally sourced materials that will be used in backfill, cover soil, or engineered caps for upcoming BPSOU remediation activities described in the BPSOU Consent Decree (CD) (referred to as BPSOU CD; EPA, 2020a) Further Remedial Elements Scope of Work (FRESOW) (Attachment C of Appendix D to the BPSOU CD), the 2020 Residential Metals Abatement Program (RMAP) Unilateral Administrative Order (UAO) Amendment (EPA, 2020a), and ongoing maintenance …
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 31 – Waste Dump #5 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 16, 2023, at the Butte Reclamation Evaluation System (BRES) No. 31 – Waste Dump #5 Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established …
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).
This Quality Assurance Project Plan (QAPP) …