Open Access. Powered by Scholars. Published by Universities.®

Articles 691 - 720 of 1824

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott Sep 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Sep 2024

Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford Sep 2024

Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Sep 2024

Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works Interim Demolition Plan Phase Ii Encroachment Analysis, Pioneer Technical Services, Inc. Sep 2024

Butte Reduction Works Interim Demolition Plan Phase Ii Encroachment Analysis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Josh Bryson Sep 2024

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2024

Revised Draft Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Sep 2024

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc. Sep 2024

Appendix D Comparison Of Historical Coc Results To Groundwater Remedial Goals, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc. Sep 2024

2024 Draft Blacktail Creek Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization (Dated August 28, 2024), Emma Rott Aug 2024

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization (Dated August 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Yard Submittals Round 2 (Dated July 25, 2024), Brandon Warner Aug 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Yard Submittals Round 2 (Dated July 25, 2024), Brandon Warner

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson Aug 2024

Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Pilot Project 2024 Annual Update, Loren Burmeister, Mark Thompson Aug 2024

Pilot Project 2024 Annual Update, Loren Burmeister, Mark Thompson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister Aug 2024

2024 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Aug 2024

Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Yard Submittals Round 2 (Dated July 25, 2024), Molly Roby Aug 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Yard Submittals Round 2 (Dated July 25, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - July 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Aug 2024

Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project - July 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 9, 2024)., Emma Rott Aug 2024

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 9, 2024)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1 (Dated July 22, 2024), Molly Roby Aug 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1 (Dated July 22, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site 2nd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2024

Re: Silver Bow Creek Butte Area Npl Site 2nd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


July 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Aug 2024

July 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Diggings East 60% Remedial Design Package Submittal (Dated April 23, 2024), Emma Rott Aug 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Diggings East 60% Remedial Design Package Submittal (Dated April 23, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance Report Butte Treatment Lagoon System – 2023 (Dated May 28, 2024), Emma Rott Aug 2024

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Annual Operations And Maintenance Report Butte Treatment Lagoon System – 2023 (Dated May 28, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Second Quarter Report, Mark Thompson, Dave Griffis Aug 2024

Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc, 2024 Second Quarter Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty Aug 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty Aug 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2024

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty Aug 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.