Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 901 - 930 of 2978

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Final 2021 Residential Metals Abatement Program – Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report (Dated April 26, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (Dated April 2, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby May 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (Dated March 21, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 49 – Old Glory., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 49 – Old Glory., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 74 – West Gagnon Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 45 – Garfield, Mike Mcanulty May 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 45 – Garfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 121 – Travona Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 125 – Child Harold-2 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike Mcanulty May 2024

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company May 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #11: Ur-49 And Ur-50, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby May 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (Qapp) (Dated March 8, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Seasonal Comparison Of Air Quality Variables And Evaluation Of Carbon Dioxide And Particulate Measurement Period In Classrooms, Daud Nosham May 2024

Seasonal Comparison Of Air Quality Variables And Evaluation Of Carbon Dioxide And Particulate Measurement Period In Classrooms, Daud Nosham

Durham School of Architectural Engineering and Construction: Dissertations, Theses, and Student Research

Indoor air quality and thermal environmental variables were measured in 55 classrooms in the mid-western United States spanning a full academic year. The studied air quality and environmental factors included carbon dioxide, temperature, relative humidity, particle counts, air velocity, formaldehyde, total volatile organic compounds, carbon monoxide, nitrogen dioxide, and ozone.

Carbon dioxide and Particulate matter concentrations were measured for a four-day measurement period. Then one-day, two-day, and four-day occupied time average concentrations were calculated which were then compared statistically to figure out an appropriate measurement period for these air quality variables. Kruskal Wallis test and Wilcoxon test were used to …


Assessing Sustainability Within The Brewing Industry: A Literature Review And Benchmarking Analysis., Elijah Thomas Miller May 2024

Assessing Sustainability Within The Brewing Industry: A Literature Review And Benchmarking Analysis., Elijah Thomas Miller

Electronic Theses and Dissertations

The goals of this study were twofold: to further examine sustainability within the brewing industry through a literature analysis across four academic journals, and a benchmarking analysis of a Louisville, Kentucky brewery’s resource consumption and emissions production. Publications related to the brewing industry were examined for the presence of sustainability keywords: “efficiency, sustainability, carbon footprint, climate change and greenhouse gas”. Benchmarking examined the local brewery’s primary production facility to determine their performance compared to other surveyed breweries pursuing sustainability across the country. Literature examination found noticeable discrepancies between the appearance of sustainability topics within article abstracts and their discussion within …


Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 08 – Belle Of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc. May 2024

Final 2022 Insufficiently Reclaimed Sites Sampling Bres No. 08 – Belle Of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. May 2024

Draft Final 2023 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Repository Screening Report, Pioneer Technical Services, Inc. May 2024

Final Repository Screening Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc. Apr 2024

Draft Final Revised Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Residential Parcels), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021-2022 Residential Metals Abatement Program (Rmap) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Apr 2024

Final 2024 Residential Metals Abatement Program (Rmap) Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Final Unreclaimed Sites Fsps Request For Change Ur/Ir 2024-001, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2024

Draft Final 2021 Residential Metals Abatement Program (Rmap) Head Start (Former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkely Pit Repository Cost Comparison, Josh Bryson Apr 2024

Berkely Pit Repository Cost Comparison, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson Apr 2024

Silver Bow Creek Conservation Area (Sbcca) 60% Technical Specifications Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty Apr 2024

Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites Final Ur Field Sampling Plan (Fsp) Submittal #4 – Request For Change (Rfc) -Ur Fsp #4-001., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson Apr 2024

Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.