Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 751 - 780 of 2978

Full-Text Articles in Environmental Health and Protection

Butte Priority Soils Operable Unit (Bpsou) Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022., Pioneer Technical Services, Inc. Oct 2024

Butte Priority Soils Operable Unit (Bpsou) Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022., Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Oct 2024

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2024

Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Oct 2024

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: August 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Sep 2024

Re: August 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Bhrs), Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Butte Hill Revegetation Specifications (Bhrs), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Sep 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott Sep 2024

Re: Comment Letter For Draft Bpsou 2023 Groundwater Data Summary Report (Dated May 31, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 78 – Original Mine Yard, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 34e – Eveline Dump East, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty Sep 2024

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 52 – Moscow Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty Sep 2024

Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler Sep 2024

Request For Change (Rfc-Rmap-2024-002), Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2024

Draft Final Revised 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby Sep 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (Fsps) And Response To Agency Comments – Bres No. 34e Eveline Dump East, Bres No. 52 Moscow Dump (Dated August 13, 2024) And The Bres No. 78 Original Mine Yard (Updated On September 6, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc. Sep 2024

Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott Sep 2024

Re: Comment Letter For Draft Bpsou 2023 Site-Wide Surface Water Data Summary Report (Dated May 31, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Groundwater Model Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc. Sep 2024

Blacktail Creek (Btc) Pumping Test Interpretation Technical Memorandum, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc. Sep 2024

Response To Agency Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report Prepared For Atlantic Richfield Company By Stantec Consulting Services, Inc. Dated September 12, 2024 Date Of Comments: February 1, 2024, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby Sep 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (Dated March 29, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson Sep 2024

Re: Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request For Change Brw-2024-01, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Molly Roby Sep 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump, Molly Roby Sep 2024

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) For Bres No. 181 – Mountain Con-3 Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott Sep 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Butte Reduction Works (Brw) Phase Iii Quality Assurance Project Plan (Qapp) Request Of Change Brw-2024-01 (Dated August 30, 2024)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Methane Fluxes In Tidal Marshes Of The Conterminous United States, Ariane Arias-Ortiz, Jaxine Wolfe, Scott D. Bridgham, Sara Knox, Gavin Mcnicol, Brian A. Needelman, Julie Shahan, Ellen J. Stuart-Haëntjens, Lisamarie Windham-Myers, Patty Y. Oikawa, Dennis D. Baldocchi, Joshua S. Caplan, Margaret Capooci, Kenneth M. Czapla, R. Kyle Derby, Heida L. Diefenderfer, Inke Forbrich, Gina Groseclose, Jason K. Keller, Cheryl Kelley, Amir E. Keshta, Helena S. Kleiner, Ken W. Krauss, Robert R. Lane, Sarah Mack, Serena Moseman-Valtierra, Thomas J. Mozdzer, Peter Mueller, Scott C. Neubauer, Genevieve Noyce, Katrina V. R. Schäfer, Rebecca Sanders-Demott, Charles A. Schutte, Rodrigo Vargas, Nathaniel B. Weston, Benjamin Wilson, J. Patrick Megonigal, James R. Homquist Sep 2024

Methane Fluxes In Tidal Marshes Of The Conterminous United States, Ariane Arias-Ortiz, Jaxine Wolfe, Scott D. Bridgham, Sara Knox, Gavin Mcnicol, Brian A. Needelman, Julie Shahan, Ellen J. Stuart-Haëntjens, Lisamarie Windham-Myers, Patty Y. Oikawa, Dennis D. Baldocchi, Joshua S. Caplan, Margaret Capooci, Kenneth M. Czapla, R. Kyle Derby, Heida L. Diefenderfer, Inke Forbrich, Gina Groseclose, Jason K. Keller, Cheryl Kelley, Amir E. Keshta, Helena S. Kleiner, Ken W. Krauss, Robert R. Lane, Sarah Mack, Serena Moseman-Valtierra, Thomas J. Mozdzer, Peter Mueller, Scott C. Neubauer, Genevieve Noyce, Katrina V. R. Schäfer, Rebecca Sanders-Demott, Charles A. Schutte, Rodrigo Vargas, Nathaniel B. Weston, Benjamin Wilson, J. Patrick Megonigal, James R. Homquist

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Methane (CH4) is a potent greenhouse gas (GHG) with atmospheric concentrations that have nearly tripled since pre-industrial times. Wetlands account for a large share of global CH4 emissions, yet the magnitude and factors controlling CH4 fluxes in tidal wetlands remain uncertain. We synthesized CH4 flux data from 100 chamber and 9 eddy covariance (EC) sites across tidal marshes in the conterminous United States to assess controlling factors and improve predictions of CH4 emissions. This effort included creating an open-source database of chamber-based GHG fluxes (https://doi.org/10.25573/serc.14227085). Annual fluxes across chamber and EC sites averaged 26 ± 53 g CH4 …


Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson Sep 2024

Re: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request For Change To Install Additional Test Pits And Perform Material Characterization, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford Sep 2024

Draft Comments On Bpsou “Diggings East 60% Remedial Design Package” Received From British Petroleum - Atlantic Richfield Company (Bp-Ar) On 4/23/2024, Jim Ford

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.