Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 331 - 360 of 2953

Full-Text Articles in Environmental Health and Protection

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby Oct 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Ur- 19 – Butte, Anaconda & Pacific Railway From Montana Street To South Arizona Avenue – Montana Street Adjacent Parcel (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty Oct 2025

Re: Butte Priority Soil Operable Unit (Bpsou) Final Bres No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty Oct 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott Oct 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated September 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap) Butte Koa Playground Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc. Oct 2025

Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Remedial Action Work Plan (Rawp): Bres No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Oct 2025

Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Sites Field Sampling (Fsp) (Dated August 14, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 35 Del Monte Reclamation Improvement Sites Field Sampling (Fsp) (Dated August 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No.94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp) (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling (Fsp): Bres No.177 - North Alice Culvert (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 45 – Garfield Response To Agency Comments (Dated August 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Epa Comments Dated September 16, 2025 For The Blacktail Creek Riparian Actions Uniform Federal Policy - Quality Assurance Project Plan Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Environmental Protection Agency Sep 2025

Response To Epa Comments Dated September 16, 2025 For The Blacktail Creek Riparian Actions Uniform Federal Policy - Quality Assurance Project Plan Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Pilot Project 2025 Annual Update, Mark Thompson, Loren Burmeister Sep 2025

Re: Pilot Project 2025 Annual Update, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc. Sep 2025

Revised Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated June 24, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Insufficiently Reclaimed Sites Bres No. 158 – Waste Rock Dump Remedial Action Work Plan (Rawp) (Dated June 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company, Montana Resources, Llc Sep 2025

Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company, Montana Resources, Llc

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Uniform Federal Policy- Quality Assurance Project Plan, Hydrogeologic, Inc. Sep 2025

Revised Final Uniform Federal Policy- Quality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Sep 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils (Bpsou) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (Dated May 1, 2025, Received July 28, 2025), Emma Rott Sep 2025

Re: Conditional Approval Letter For Butte Priority Soils (Bpsou) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (Dated May 1, 2025, Received July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated July 28, 2025), Emma Rott Sep 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Epa Comments Dated September 29, 2025 For The Blacktail Creek Riparian Actions Draft Preliminary (30%) Remedial Design Report, Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Montana Department Of Environmental Quality Sep 2025

Response To Epa Comments Dated September 29, 2025 For The Blacktail Creek Riparian Actions Draft Preliminary (30%) Remedial Design Report, Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Montana Department Of Environmental Quality

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Condition Approval Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (Dated May 2, 2025, Received July 28, 2025), Emma Rott Sep 2025

Re: Condition Approval Letter For Bpsou Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (Dated May 2, 2025, Received July 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2025 Residential Metals Abatement Program (Rmap): Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Sep 2025

Draft Final 2025 Residential Metals Abatement Program (Rmap): Cccs Gymnasium Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Unraveling Crop Nitrogen-Water Dynamics With Hyperspectral-Thermal Sensing In Northern Central Valley, California, Shahryar Fazli, Surendra Maharjan, Wenzhao Li, Joshua B. Fisher, Rejoice Thomas, Fernando Romero Galvan, Gabriela Shirkey, Hesham El-Askary Sep 2025

Unraveling Crop Nitrogen-Water Dynamics With Hyperspectral-Thermal Sensing In Northern Central Valley, California, Shahryar Fazli, Surendra Maharjan, Wenzhao Li, Joshua B. Fisher, Rejoice Thomas, Fernando Romero Galvan, Gabriela Shirkey, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Ensuring global food security in the face of climate change requires optimizing crop water use and nutrient management. This study investigates the relationship between canopy nitrogen (N) and evapotranspiration (ET) across sunflower, rice, walnut, alfalfa, and plum crops using advanced remote sensing technologies. High-resolution hyperspectral data from NASAs Earth Surface Mineral Dust Source Investigation (EMIT) and thermal multispectral data from the Landsat-based OpenET system were analyzed over 1,135 km2 in California. Regression analysis revealed strong spatial association between canopy N and ET for sunflower (R2 = 0.82), rice (R2 = 0.71), and walnut (R2 = 0.68), …


Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Sep 2025

Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 100 – Capri Motel – Arctic Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc. Sep 2025

Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed Sep 2025

Warming Induces Unexpectedly High Soil Respiration In A Wet Tropical Forest, Tana E. Wood, Colin Tucker, Aura M. Alonso-Rodríguez, M. Isabel Loza, Iana F. Grullón-Penkova, Molly A. Cavaleri, Christine S. O'Connell, Sasha C. Reed

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Tropical forests are a dominant regulator of the global carbon cycle, exchanging more carbon dioxide with the atmosphere than any other terrestrial biome. Climate models predict unprecedented climatic warming in tropical regions in the coming decades; however, in situ field warming studies are severely lacking in tropical forests. Here we present results from an in situ warming experiment in Puerto Rico, where soil respiration responses to +4 oC warming were assessed half-hourly for a year. Soil respiration rates were 42-204% higher in warmed relative to ambient plots, representing some of the highest soil respiration rates reported for any …


Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson Sep 2025

Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.