Open Access. Powered by Scholars. Published by Universities.®

Environmental Monitoring

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1201 - 1230 of 2978

Full-Text Articles in Environmental Health and Protection

Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller Aug 2023

Investigating The Impact On Private Water Supply Of Hydraulic Fracturing Communication With An Abandoned Conventional Gas Well In New Freeport, Pa, Kiley Miller

Electronic Theses and Dissertations

In June of 2022 a “frac out” occurred in New Freeport, PA when an unconventional gas well under development by hydraulic fracturing, communicated with an abandoned gas well to the surface. An initial “zone of impact” encompassed much of the town’s main thoroughfare. Water samples were obtained from 17 private water wells, 5 springs and 1 pond (31 total samples) and analyzed for cations, anions, and light hydrocarbons. Methane was found in 18 of the samples, both located within and outside of the “zone of impact”. Mass ratio analyses indicated contamination from both unconventional and conventional wells. Interferometric Synthetic Aperture …


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc. Aug 2023

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc. Aug 2023

2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon Aug 2023

Integrating Sensor Development, Risk Assessment, And Community Engagement To Support Environmental Justice In The Rural Community Of El Tiple, Colombia, David Bahamon Pinzon

All Dissertations

In Colombia, ethnic communities have traditionally been responsible stewards of natural resources. They recognize the importance of these resources for their livelihood, as well as their ancestral and cultural heritage. El Tiple, a rural Afro-Colombian community, has been affected by the incursion of private corporations that promoted the expansion of sugarcane monocrops in their territory. Since the introduction of the monoculture industry, local freshwater sources have been depleted due to intensive water use for irrigation of the sugarcane crops. Additionally, the intensive usage of agrochemicals has been linked with loss of native flora, damages to family farms, and pollution of …


Per- And Polyfluoroalkyl Substances (Pfas) In Treated Sewage Sludge From Michigan Wastewater Treatment Plants, Garrett Wesley Link Aug 2023

Per- And Polyfluoroalkyl Substances (Pfas) In Treated Sewage Sludge From Michigan Wastewater Treatment Plants, Garrett Wesley Link

Masters Theses

Concentrations, compositions, and variability of Per- and Polyfluoroalkyl Substances (PFAS) in sewage sludge are characterized using an extensive dataset of 350 samples from 190 wastewater treatment plants (WWTPs) across Michigan. All samples are comprised of final treated sewage sludge generated at the end of the wastewater treatment process. Concentrations of Σ24 PFAS are log normally distributed with a range of 1 to 3200 ng/g dry wt. and of average 108 ± 277 ng/g dry wt. Compounds with carboxyl and sulfonic functional groups comprised 29% and 71% of Σ24 PFAS concentrations, respectively, on average. Primary sample variability is associated …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Aug 2023

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc. Jul 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene Jul 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Field Sampling Plan (Fsp) Submittal #11 [Covering Montana Technological University – North Campus] (Dated July 23, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.