Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 721 - 750 of 2538

Full-Text Articles in Environmental Health and Protection

Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1, Pioneer Technical Services, Inc. Nov 2024

Final 2024 Residential Metals Abatement Program (Rmap) Brown’S Gulch Borrow Submittal #1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson Oct 2024

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Remedial Design Documents For The Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott Oct 2024

Comment Letter For Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis (Dated September 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu Oct 2024

Carbon Restoration Potential On Global Land Under Water Resource Constraints, Shouzhang Peng, César Terrer, Benjamin Smith, Philippe Ciais, Qinggong Han, Jialan Nan, Joshua B. Fisher, Liang Chen, Lei Deng, Kailiang Yu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Ecosystem restoration is a critical nature-based solution to mitigate climate change. However, the carbon sequestration potential of restoration, defined as the maximum achievable carbon storage, has likely been overestimated because previous studies have not adequately accounted for the competition between ecosystem water demands for maximizing carbon sequestration and human water needs. Here we used a comprehensive process-based model combined with extensive land-use data and evaporation recycling accounting for land–atmosphere feedback to estimate the water requirements associated with ecosystem restoration. We found that achieving the carbon sequestration potential of restoration would significantly reduce global water availability per capita by 26%, posing …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) (Dated September 27, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Oct 2024

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe Oct 2024

Re: Comments On: Draft Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Dated August 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe Oct 2024

Re: Approval Of: Operations And Maintenance Manual, Horseshoe Bend Water Treatment Plant, Dated July 26, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022 (Dated July 3, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott Oct 2024

Comment Letter For Draft Final Bpsou Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024 (Dated June 26, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised Yard Submittals Round 2 (Dated August 30, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc-Rmap-2024-002) For The Soil Remedial Action At Mandan Park (Dated September 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc. Oct 2024

2024 Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe Oct 2024

Approval Of: Berkeley Pit And Discharge Pilot Project, Discharge System Operations And Maintenance Manual, 2024 Update , Dated April 23, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe Oct 2024

Approval Of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report For The Rocker Timber Framing And Treating Plant Operable Unit; Dated April 10, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe Oct 2024

Re: Approval Of: Berkeley Pit And Discharge Pilot Project Temperature Evaluation, 2023 Update, Dated June 28, 2024., Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe Oct 2024

Approval Of: Discharge System 2023 Annual Operations And Maintenance Report, Berkeley Pit And Discharge Pilot Project, Dated May 20, 2024, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2024

Final 2024 Residential Metals Abatement Program (Rmap) Walkerville Park (Alley Of North Main And Alley Of West Daly) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike Mcanulty Oct 2024

Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 181 – Mountain Con-3 Dump And Responses To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised 2024 Walkerville Park (Alley Of North Main & Alley Of West Daly) Soil Remedial Action Work Plan (Rawp) (Dated September 18, 2024), Molly Roby Oct 2024

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Residential Metals Abatement Program (Rmap) Revised 2024 Walkerville Park (Alley Of North Main & Alley Of West Daly) Soil Remedial Action Work Plan (Rawp) (Dated September 18, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency Oct 2024

Proposed Plan To Amend The Remedial Action For The Butte Priority Soils Operable Unit, Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Rabbit Control: Fumigation, Department Of Primary Industries And Regional Development, Western Australia Oct 2024

Rabbit Control: Fumigation, Department Of Primary Industries And Regional Development, Western Australia

Biosecurity factsheets

Fumigation for rabbit control involves the introduction of poisonous gas into a warren. It is one of the best control methods to use where low numbers of rabbits live in a few widely scattered warrens. The threat to non-target animals is minimal. This factsheet should be read in conjunction with registered product labels and directions for use. Check the Department of Health, Western Australia website (health.wa.gov.au) for public health requirements for the use of phosphine fumigation.

Fumigation may be used in areas where access is limited, such as fence lines, around trees, and on riverbanks, but it may be difficult …


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Oct 2024

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Oct 2024

Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Oct 2024

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Oct 2024

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022., Pioneer Technical Services, Inc. Oct 2024

Butte Priority Soils Operable Unit (Bpsou) Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022., Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Rabbit Control: 1080 Versus Pindone, Department Of Primary Industries And Regional Development, Western Australia Oct 2024

Rabbit Control: 1080 Versus Pindone, Department Of Primary Industries And Regional Development, Western Australia

Biosecurity factsheets

There are two toxins available for controlling pest rabbits in Western Australia: 1080 and pindone. This factsheet provides a brief summary of the main characteristics of both vertebrate pesticides. 1080 is generally the preferred toxin for rabbit control in Western Australia (WA).

Any attempt to reduce the impact of rabbits on the productivity of any agricultural enterprise (for example, pasture, crops, tree farms, horticulture) should be undertaken as part of a pest management plan.

This strategy should be proactive rather than reactive to a problem. It should also include a long term strategy for dealing with potential rabbit damage, including …