Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 61 - 90 of 2507

Full-Text Articles in Environmental Health and Protection

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby Jul 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson Jul 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner Jul 2026

Re: Response To Comment Letter (Dated June 11, 2026) For The Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Dated January 30, 2026), Brandon Warner

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass Jul 2026

Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass

DePaul Discoveries

Fine particulate matter (PM₂.₅) poses significant risks to human health and disproportionately affects marginalized communities in urban environments (World Health Organization [WHO], 2021; Tessum et al., 2021). Using low-cost mobile sensors, this study explored spatiotemporal PM₂.₅ concentration patterns along a north–south transect of Halsted Street in Chicago. A 2B Technologies Portable Aerosol Monitor (PAM) mounted on a bicycle was used to continuously record PM₂.₅ concentrations with associated GPS coordinates at approximately two-second intervals during 16 sampling events between 08-12-2025 and 10-05-2025. PM₂.₅ concentrations did not differ significantly among the South Side, West Loop, and North Side regions, contrary to the …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc. Jul 2026

Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services Jul 2026

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler Jul 2026

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company Jun 2026

Third Butte Rmap Biomonitoring (Phase 3) Report, Ramboll, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (Dated May 13, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (Dated May 13, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated June 1, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla Jun 2026

Trophic Transfer Of Fluorescent Polyethylene Microplastics In A Simplified Artemia–Oreochromis Aquatic Food Chain, Dativa J. Shilla

Tanzania Journal of Science

Microplastics (MPs) are pervasive contaminants in aquatic ecosystems, yet experimental evidence of their trophic transfer within tropical African food webs remains scarce. This study provides experimental evidence of indirect trophic transfer of microplastics from Artemia salina to Oreochromis urolepis, a cichlid species of ecological and economic importance in African inland and coastal waters. A simplified two-level food chain was established by exposing A. salina nauplii to fluorescent polyethylene microplastics (10–20 µm; 1, 10, and 100 mg L⁻¹) and subsequently feeding them to juvenile O. urolepis under controlled laboratory conditions. These concentrations were selected to represent a range of exposure levels …


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott Jun 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (Dated March 13, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily Labarge Jun 2026

Effects Of Changing Fire Regimes On Black Huckleberry Habitat Suitability, Emily Labarge

University Honors Theses

Black huckleberries are a significant cultural, ecological, and economic species in the Pacific Northwest. Historically, black huckleberries were tended with cultural fire by Indigenous peoples, and now also hold importance as a resource in the non-timber forest product economy. Research has begun on the impacts of climate change on suitable black huckleberry habitat and on changing fire regimes, but not in relation to each other. To address this gap, I examined the area of overlap between suitable black huckleberry habitat and fire burn probability into mid-century climate projections. I determined the current ownership entities with management jurisdiction in areas with …


Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott Jun 2026

Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For First Quarter 2026 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott Jun 2026

Re: Approval Letter For The Quarterly Operations And Maintenance Report Grove Gulch Sedimentation Bay For Fourth Quarter 2025 Silver Bow Creek/Bute Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She (Dated May 15, 2026)., Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.