Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 421 - 450 of 2523

Full-Text Articles in Environmental Health and Protection

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Aug 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller Aug 2025

Sustainability: Buzz Word Or Future Of Fashion? Measuring The Feasibility Of Outright Sustainability Among Fast Fashion’S Biggest Agents, Ryan Miller

Apparel Merchandising and Product Development Undergraduate Honors Theses

Abstract


The fashion industry is currently experiencing unsustainable rates of pollution within its supply chains. The rapid increase in demand for short lead times perpetrated by large-scale retailers has led to hazardous practices negatively affecting both the environmental conditions and working conditions of producing countries. With this increased pressure, relationships between brands and suppliers have become untenable. Limited transparency and imbalanced power dynamics at the hand of the industry’s leading retailers require restructuring in order to build more sustainable and equitable supply-chain practices. Further, governmental regulation is currently limited in its capacity to enforce sustainable business practices on a global …


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Multi-Crop Systems And Crop-Switching Strategies To Enhance Water Use Efficiency And Climate Resilience In Arid Agricultural Regions, Shahryar Fazli, Wenzhao Li, Surendra Maharjan, Hesham El-Askary Aug 2025

Multi-Crop Systems And Crop-Switching Strategies To Enhance Water Use Efficiency And Climate Resilience In Arid Agricultural Regions, Shahryar Fazli, Wenzhao Li, Surendra Maharjan, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Agriculture in the Lower Colorado River (LCR) region faces mounting challenges from climate change, arid conditions, and water scarcity. This study evaluates water use efficiency (WUEc) and crop-switching strategies under SSP2-4.5 and SSP5-8.5 scenarios for 2025–2049, 2050–2074, and 2075–2099. Using historical data, climatic drivers such as temperature and precipitation were analyzed for their influence on key crops, including durum wheat, winter wheat, and corn. Results show SSP2-4.5 supports water use reductions up to 16%, stable profits (80–90%), and modest calorie increases (up to 15%), while SSP5-8.5 poses severe challenges, with water use reductions of 2–5%, profits dropping to around 20%, …


Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Butte Treatment Lagoons (Btl) Groundwater Treatment System Routine Operations, Maintenance, And Monitoring (Om&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc. Aug 2025

Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. Aug 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Highly Contaminated Sediments From The Gowanus Canal (New York) Superfund Site: An Environmental Forensic Approach, Michael A. Kruge, Kevin K. Olsen, Eric A Stern, Maria Mastalerz, Albert Permanyer Jul 2025

Highly Contaminated Sediments From The Gowanus Canal (New York) Superfund Site: An Environmental Forensic Approach, Michael A. Kruge, Kevin K. Olsen, Eric A Stern, Maria Mastalerz, Albert Permanyer

Department of Earth and Environmental Studies Faculty Scholarship and Creative Works

The 2.5 km long Gowanus Canal (Brooklyn, NY, USA) is a severely contaminated urban waterway dating from the mid-19th century, listed as a US Environmental Protection Agency (USEPA) Superfund site since 2010. Applying an environmental forensics approach to the extensive USEPA data set, we detect systematic variations in parent PAH ring number distributions in the canal sediments, as well as an extraordinary enrichment in organic carbon. We subjected a supplemental sample set to a more detailed analysis by quantitative pyrolysis-GC-MS, Rock-Eval pyrolysis, and organic petrology. With these sensitive methods, we can confirm the alkyl-PAH fingerprint of coal tar (a legacy …


Revised Draft Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc. Jul 2025

Revised Draft Final Uniform Federal Policyquality Assurance Project Plan, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan Revision 01 (Dated June 6, 2025), Emma Rott Jul 2025

Re: Comment Letter For Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan Revision 01 (Dated June 6, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Jul 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated April 8, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated April 8, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Valley Sand & Gravel (Builders Firstsource) Borrow Submittal #1 (Dated June 27, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2025 Residential Metals Abatement Program (Rmap) Valley Sand & Gravel (Builders Firstsource) Borrow Submittal #1 (Dated June 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sampling: Bres No. 84 Site Evaluation Summary Report (Dated April 11, 2025), Molly Roby Jul 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sampling: Bres No. 84 Site Evaluation Summary Report (Dated April 11, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated April 1, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Uncontrolled Surface Flow Areas Drainage C 30% Design Rawp (Dated June 23, 2025), Molly Roby Jul 2025

Re: Comment Letter For Bpsou Uncontrolled Surface Flow Areas Drainage C 30% Design Rawp (Dated June 23, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-22 Site Evaluation Summary Report (Dated April 2, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-22 Site Evaluation Summary Report (Dated April 2, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated May 13, 2025), Emma Rott Jul 2025

Re: Comments On The Repository, Haul Route, And Pipeline Geotechnical Pre-Design Investigation Summary Report (Dated May 13, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Groundwater Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott Jul 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Groundwater Monitoring Data Summary Report (Dated May 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson Jul 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Jul 2025

Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated March 19, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling Bres No. 30 – Atlantic 1 Site Evaluation Summary Report (Dated February 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 32 Site Evaluation Summary Report (Dated December 11, 2024), Molly Roby Jul 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 32 Site Evaluation Summary Report (Dated December 11, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For 2024 Annual Operations And Maintenance Report Butte Reclamation Evaluation System (Bres) Annual Summary Report For Work Completed In Quadrant 4 (Dated May 1, 2025), Molly Roby Jul 2025

Re: Comment Letter For 2024 Annual Operations And Maintenance Report Butte Reclamation Evaluation System (Bres) Annual Summary Report For Work Completed In Quadrant 4 (Dated May 1, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Response To Comment Letter And The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Both Dated June 6, 2025), Molly Roby Jul 2025

Re: Approval Letter For The Response To Comment Letter And The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Butte Reclamation Evaluation System (Bres) Corrective Action Plans For Reclaimed Sites (Both Dated June 6, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.