Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 241 - 270 of 2516

Full-Text Articles in Environmental Health and Protection

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Reportfinal 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Reportfinal 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Feb 2026

Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jan 2026

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-08 (Anderson Shaft) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Robust Deep Learning Ensemble Framework For Waterbody Detection Using High-Resolution X-Band Sar Under Data-Constrained Conditions, Soyeon Choi, Seung Hee Kim, Son V. Nghiem, Menas Kafatos, Minha Choi, Jinsoo Kim, Yangwon Lee Jan 2026

A Robust Deep Learning Ensemble Framework For Waterbody Detection Using High-Resolution X-Band Sar Under Data-Constrained Conditions, Soyeon Choi, Seung Hee Kim, Son V. Nghiem, Menas Kafatos, Minha Choi, Jinsoo Kim, Yangwon Lee

Institute for ECHO Articles and Research

Accurate delineation of inland waterbodies is critical for applications such as hydrological monitoring, disaster response preparedness and response, and environmental management. While optical satellite imagery is hindered by cloud cover or low-light conditions, Synthetic Aperture Radar (SAR) provides consistent surface observations regardless of weather or illumination. This study introduces a deep learning-based ensemble framework for precise inland waterbody detection using high-resolution X-band Capella SAR imagery. To improve the discrimination of water from spectrally similar non-water surfaces (e.g., roads and urban structures), an 8-channel input configuration was developed by incorporating auxiliary geospatial features such as height above nearest drainage (HAND), slope, …


Butte Priority Soils Operable Unit (Bpsou) Data Summary Report (Dsr) Statement Of Authenticity Updates, Mike Mcanulty Jan 2026

Butte Priority Soils Operable Unit (Bpsou) Data Summary Report (Dsr) Statement Of Authenticity Updates, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler Jan 2026

Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Atlantic Richfield Company Jan 2026

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated September 12, 2025), Emma Rott Jan 2026

Re: Conditional Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated September 12, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) 2024 Data Summary Report (Dated October 15, 2025), Emma Rott Jan 2026

Re: Comment Letter For Draft Clark Tailings Consolidated Waste Management Area (Ctcwma) 2024 Data Summary Report (Dated October 15, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


High Spatiotemporal Resolution Monitoring Of Crop Water Stress Across The Contiguous United States Using Harmonized Landsat And Sentinel-2 Data, Na Chen, Yanlei Feng, Na Wang, Jevan Yu, Mohammad Reza Alizadeh, Yifeng Cui, Ning Ye, Wenzhe Jiao, Joshua B. Fisher, César Terrer Jan 2026

High Spatiotemporal Resolution Monitoring Of Crop Water Stress Across The Contiguous United States Using Harmonized Landsat And Sentinel-2 Data, Na Chen, Yanlei Feng, Na Wang, Jevan Yu, Mohammad Reza Alizadeh, Yifeng Cui, Ning Ye, Wenzhe Jiao, Joshua B. Fisher, César Terrer

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Accurate and timely monitoring of crop water stress is essential for efficient agricultural water management, ultimately maintaining and improving crop productivity. While Landsat has been used for this purpose, its temporal resolution hampers timely detection of crop water stress. The recently released Harmonized Landsat and Sentinel-2 Version 2.0 dataset, which enables a higher-frequency time series of satellite observations (2–3 days, 30 m), offers a promising solution to this challenge. However, its potential for crop stress monitoring remained unexplored. In this study, we utilized 923 HLS satellite tiles to assess crop water stress across the contiguous United States (CONUS). Crop water …


2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jan 2026

2026 Revised Draft Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated December 9, 2025), Molly Roby Jan 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report (Dated December 9, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby Jan 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-22 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby Jan 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report (Dated December 10, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann Jan 2026

When Words Flow Like Water: How The Enbridge Line 3 Pipeline Environmental Impact Statement Failed To Prevent Hydrogeologic Harm In Minnesota, Carly Gutzmann

Journal of Earth and Life Science

For the aquifers of Minnesota, the environmental impact statement (EIS) was a promise of protection that never left the page. An environmental impact statement is meant to be an aid in the decision making process in order to ensure that projects consider potential environmental harms that may occur. However, they are often used instead as another regulatory box to check, rather than as active considerations when planning. As such, a project plan can be flawed from the start—if project developers only consider environmental impacts after they have already put considerable time, effort, and funding into their project as-is, they may …


Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc. Jan 2026

Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Using Remote Sensing Technology To Develop A Framework For Improving Hydrologic Models, Marissa Cook Jan 2026

Using Remote Sensing Technology To Develop A Framework For Improving Hydrologic Models, Marissa Cook

Theses, Dissertations and Capstones

With increased storm intensity due to climate change and urbanization, flash flooding has become an increasingly significant issue globally and regionally. Although the factors influencing urban flash flooding are well-known, there is a growing need for technology to accurately and remotely predict the chance of a flash flood occurring from any given rain event to give people time to prepare. This study aims to use multispectral satellite imagery to provide a framework for improving near real-time flood predictions in an urban area of a high gradient, fourth order stream impacted by flooding. Specifically, we utilize satellite imagery to create the …


2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2026

2024 Annual Operations And Maintenance Report - 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson Jan 2026

Swimming In Uncertainty: Filling Data Gaps And Providing An Educational Platform For Beach Water Quality At Tybee Island, Georgia, Lukas Roberson

College of Graduate Studies: Theses & Dissertations

@font-face {font-family:"Cambria Math"; panose-1:2 4 5 3 5 4 6 3 2 4; mso-font-charset:0; mso-generic-font-family:roman; mso-font-pitch:variable; mso-font-signature:-536870145 1107305727 0 0 415 0;}p.MsoNormal, li.MsoNormal, div.MsoNormal {mso-style-unhide:no; mso-style-qformat:yes; mso-style-parent:""; margin:0in; mso-pagination:widow-orphan; font-size:12.0pt; font-family:"Times New Roman",serif; mso-fareast-font-family:"Times New Roman";}.MsoChpDefault {mso-style-type:export-only; mso-default-props:yes; mso-font-kerning:0pt; mso-ligatures:none;}div.WordSection1 {page:WordSection1;}

Swimming in beaches water contaminated with high levels of bacteria can make you sick. Current monitoring at the public beaches on Tybee Island consists of weekly monitoring and enumeration of fecal indicator bacteria that takes 24 hours for results. If the number of bacteria exceed regulatory limits, a public health advisory is issued, and affected waters are retested until …


Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni Jan 2026

Using Low-Cost Sensors For Source Attribution And Health Assessment: An Air Quality Study In Brownsville, Texas, Sai Deepak Pinakana, Kabir Bahadur Shah, Daniel Jaffe, Juan L. Gonzalez, Owen Temby, Gabriel Ibarra-Mejia, Amit U. Raysoni

School of Earth, Environmental, & Marine Sciences Faculty Publications

Air quality monitoring remains a challenge in areas lacking or having sparse federal monitoring infrastructure, posing significant barriers to public health research. This study demonstrates the usage of low-cost sensors in addressing gaps in air quality monitoring, source attribution, and health risk assessment in a Brownsville, TX neighborhood impacted by emissions from a barite and celestite mineral processing unit. PM2.5 concentrations were measured using PurpleAir sensors deployed across three residential locations, with the site nearest to the processing unit recording a 24-h averaged PM2.5 concentration of 25.12 μg/m3—approximately 2.79 times higher than the nearest Texas Commission of Environmental Quality (TCEQ) …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 37 – Josephine Shaft Site Evaluation Summary Report (Dated October 16, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-20 Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 32 – Corra 2 Dump Site Evaluation Summary Report (Dated October 24, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Unreclaimed Sites Sampling: Ur-13 Site Evaluation Summary Report (Dated October 22, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby Dec 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report (Dated September 30, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.