Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1801 - 1830 of 2523

Full-Text Articles in Environmental Health and Protection

Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study, Josh Bryson Nov 2021

Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan For Microbial Analysis And Biotreatability Study, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company Nov 2021

Atlantic Richfield Response To Approval Letter For The Final Butte Priority Soils Operable Unit (Bpsou), 2022 Draft Interim Site-Wide Groundwater Monitoring, Quality Assurance Project Plan (Qapp) (Dated November 23, 2021), Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer Nov 2021

Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …


Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer Nov 2021

Spatial Distribution Of Pm2.5-Related Premature Mortality In China, Sheng Zheng, Uwe Schlink, Kin-Fai Ho, Ramesh P. Singh, Andrea Pozzer

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

PM2.5 is a major component of air pollution in China and has a serious threat to public health. It is very important to quantify spatial characteristics of the health effects caused by outdoor PM2.5 exposure. This study analyzed the spatial distribution of PM2.5 concentration (45.9 μg/m3 national average in 2016) and premature mortality attributed to PM2.5 in cities at the prefectural level and above in China in 2016. Using the Global Exposure Mortality Model (GEMM), the total premature mortality in China was estimated to be 1.55 million persons, and the per capita mortality was 11.2 …


Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler Nov 2021

Final Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Work, Josh Bryson, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021), Mike Mcanulty Nov 2021

Response To Comments For 2020 Bpsou Uao Submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (Received January 21, 2021), Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Nov 2021

Silver Bow Creek Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company Nov 2021

2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company Nov 2021

2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company Nov 2021

Silver Bow Creek/Butte Area Npl Site, Trec Inc., A Woodard And Curran Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene Nov 2021

Silver Bow Creek/Butte Area Npl Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), 11/16/21, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene Nov 2021

Sbc/Butte Area Npl Site Final Bpsou Interim Site-Wide Surface Water Monitoring Qapp 2020 And 2021 Monitoring Period, 10/14/20, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10587273 Edd, Pioneer Technical Services, Inc. Nov 2021

10587273 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10586986 Edd, Pioneer Technical Services, Inc. Nov 2021

10586986 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene Nov 2021

Comments For: Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels), Atlantic Richfield Company And Butte- Silver Bow County, Dated October 8, 2021, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #6: Ur‐05, Ur‐27, Ur‐28, Ur‐29, Ur‐30, And Ur‐34, Mike Mcanulty Nov 2021

Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #6: Ur‐05, Ur‐27, Ur‐28, Ur‐29, Ur‐30, And Ur‐34, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10586986 Edd, Pioneer Technical Services, Inc. Nov 2021

10586986 Edd, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene Nov 2021

Epa Region 8 Qa Document Review Crosswalk, Trec Inc., A Woodard And Curran Company, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Atlantic Richfield Company Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc. Nov 2021

Silver Bow Creek/Butte Area Npl Site Butte Priority Soils Operable Unit, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Design & Remedial Action, The Langdon Group, Inc., Atlantic Richfield Company Nov 2021

Butte Priority Soils Operable Unit Community Engagement Plan For Remedial Design & Remedial Action, The Langdon Group, Inc., Atlantic Richfield Company

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Radiocarbon Analyses Quantify Peat Carbon Losses With Increasing Temperature In A Whole Ecosystem Warming Experiment, Rachel M. Wilson, Natalie A. Griffiths, Ate Visser, Karis J. Mcfarlane, Stephen D. Sebestyen, Keith C. Oleheiser, Samantha Bosman, Anya M. Hopple, Malak M. Tfaily, Randall K. Kolka, Paul J. Hanson, Joel E. Kostka, Scott D. Bridgham, Jason K. Keller, Jeffrey P. Chanton Oct 2021

Radiocarbon Analyses Quantify Peat Carbon Losses With Increasing Temperature In A Whole Ecosystem Warming Experiment, Rachel M. Wilson, Natalie A. Griffiths, Ate Visser, Karis J. Mcfarlane, Stephen D. Sebestyen, Keith C. Oleheiser, Samantha Bosman, Anya M. Hopple, Malak M. Tfaily, Randall K. Kolka, Paul J. Hanson, Joel E. Kostka, Scott D. Bridgham, Jason K. Keller, Jeffrey P. Chanton

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Climate warming is expected to accelerate peatland degradation and release rates of carbon dioxide (CO2) and methane (CH4). Spruce and Peatlands Responses Under Changing Environments is an ecosystem-scale climate manipulation experiment, designed to examine peatland ecosystem response to climate forcings. We examined whether heating up to +9 °C to 3 m-deep in a peat bog over a 7-year period led to higher C turnover and CO2 and CH4 emissions, by measuring 14C of solid peat, dissolved organic carbon (DOC), CH4, and dissolved CO2 (DIC). DOC, a major substrate for heterotrophic respiration, increased significantly with warming. There was no 7-year trend …