Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1531 - 1560 of 2524

Full-Text Articles in Environmental Health and Protection

2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 Btl O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

2021 3q Btl Daily Pts Field Dump, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc. Aug 2022

10577877 Edd, Environmental Protection Agency, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

2021 3q Laboratory Edds, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


10578145, Pioneer Technical Services, Inc., Environmental Protection Agency Aug 2022

10578145, Pioneer Technical Services, Inc., Environmental Protection Agency

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 16 - Curry., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene Aug 2022

Comment Letter For: Butte Priority Soils Operable Unit (Bpsou) Draft Final 2021 Bpsou Subdrain Data Summary Report (Dated May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings Ne (Bres No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2022 Street & Snow Management Plan (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene Aug 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (Ur-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 30 – Atlantic-1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 96 – Washoe Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Aug 2022

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2022 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 93 – Soudan Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 133 – Dexter Mill, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu Aug 2022

Spatio-Temporal Changes In Vegetation In The Last Two Decades (2001–2020) In The Beijing–Tianjin–Hebei Region, Yuan Zou, Wei Chen, Siliang Li, Tiejun Wang, Le Yu, Min Xu, Ramesh P. Singh, Cong-Qiang Liu

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

In terrestrial ecosystems, vegetation is sensitive to climate change and human activities. Its spatial-temporal changes also affect the ecological and social environment. In this paper, we considered the Beijing–Tianjin–Hebei region to study the spatio-temporal vegetation patterns. The detailed analysis of a moderate-resolution imaging spectroradiometer (MODIS) data were carried out through the Google Earth Engine (GEE) platform. Our results show a slow and tortuous upward trend in the average leaf area index (LAI) in the study region for the periods 2001–2020. Specifically, Beijing had the highest LAI value, with an average of 1.64 over twenty years, followed by Hebei (1.30) and …


Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene Aug 2022

Comments For The Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling Ur- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2022

Draft Final 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 34 – Eveline (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 50 – Zelia, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty Aug 2022

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (Rawp) (Dated July 29, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Pumping Test Quality Assurance Project Plan (Qapp) (Dated July 5, 2022), Nikia Greene Aug 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Blacktail Creek Pumping Test Quality Assurance Project Plan (Qapp) (Dated July 5, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram Aug 2022

Analysis Of Seismicity And Related Seismic Risk In Muslim Countries: Case Studies From Afghanistan And Pakistan, Ikramuddin Bahram

Graduate Theses and Dissertations

How communities respond to a natural hazard is influenced by how they perceive it. This dissertation evaluated the gap between intent and action regarding earthquake hazards in Muslim countries with a focus on Afghanistan and Pakistan. Cultural biases provided predictions of risk perceptions and risk-taking preferences that were often more powerful than measures of knowledge and experience. In Muslim communities, perception of risk was influenced by the teachings of Islam and related rituals, traditions, and culture.

This study evaluated the seismicity and earthquake hazard in Afghanistan and Pakistan. Assessments of seismic risk and perception of danger were conducted to examine …


Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome Aug 2022

Application Of A 14c-Assay To Assess Methanotrophic Biodegradation Of Tce In Low Ph Groundwater, Evan Groome

All Theses

Current biological strategies for remediating trichloroethylene (TCE) in low pH aquifers (i.e., pH14C-TCE assay was developed to determine pseudo first-order rate constants for the degradation of TCE in microcosms containing soil and groundwater from the Boeing Michigan Aeronautical Research Center (BOMARC) superfund site, where the pH ranges from 4.1 to 4.9. The 14C-TCE assay was also adapted to calculate soil-normalized rate constants for data from this site, as well as data that Szwast21 collected from the Beltsville Agricultural Research Center (BARC). In addition to natural attenuation, biostimulation through amendments of methane and nutrients were also assessed. This treatment …


Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc. Aug 2022

Final Butte Reclaimed Areas Maintenance And Monitoring (M&M) Plan In Accordance With Butte Reclamation Evaluation System (Bres), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc. Aug 2022

Revised Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jul 2022

Final Bpsou Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.