Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1441 - 1470 of 2536

Full-Text Articles in Environmental Health and Protection

Remedial Action Work Plan East Middle School, Environmental Resource Management (Erm) Dec 2022

Remedial Action Work Plan East Middle School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene Dec 2022

Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene Dec 2022

Final Revised Butte Reduction Works (Brw) Phase Iii Qapp, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc. Dec 2022

2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc. Dec 2022

2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Dec 2022

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft - Sieve Study Report December 2022, Appendices, Ramboll Dec 2022

Draft - Sieve Study Report December 2022, Appendices, Ramboll

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc. Dec 2022

Comparison Of Sieved Soil Sample Results From Butte-Silver Bow Multi-Pathway Residential Metals Abatement Program: 250 Μm And 150 Μm Sieved Samples For Lead And Arsenic Enrichment Determination Atlantic Richfield Company Butte, Montana, Ramboll, Environmental Standards, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc. Dec 2022

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi Nov 2022

Increased Aerosols Can Reverse Twomey Effect In Water Clouds Through Radiative Pathway, Pradeep Khatri, Tadahiro Hayasaka, Brent N. Holben, Ramesh P. Singh, Husi Letu, Sachchida N. Tripathi

Biology, Chemistry, and Environmental Sciences Faculty Articles and Research

Aerosols play important roles in modulations of cloud properties and hydrological cycle by decreasing the size of cloud droplets with the increase of aerosols under the condition of fixed liquid water path, which is known as the first aerosol indirect effect or Twomey-effect or microphysical effect. Using high-quality aerosol data from surface observations and statistically decoupling the influence of meteorological factors, we show that highly loaded aerosols can counter this microphysical effect through the radiative effect to result both the decrease and increase of cloud droplet size depending on liquid water path in water clouds. The radiative effect due to …


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene Nov 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Solid Media Management Program Plan (Dated August 1, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Nov 2022

Final Revised Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty Nov 2022

Butte Priority Soils Operable Unit (Bpsou) Final 2022 Insufficiently Reclaimed Sites Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene Nov 2022

Approval Letter For The Request For Information (Rfi) - 01 To The Butte Priority Soils Operable Unit (Bpsou) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (Qapp) (Dated August 31, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Nov 2022

2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International Nov 2022

Nexus Between Animal Welfare, Environment, And Sustainable Development: Resource Document, Wellbeing International

Nexus – UNEP – Animal Welfare, Environment, Sustainable Development

This Resource Document has been developed to explore the Nexus (links) between Animal Welfare, the Environment, and Sustainable Development. The document includes relevant citations and reports addressing the topics encompassed by the Nexus. It will be maintained as a “living document” (subject to revision) in the WellBeing International Studies Repository. The original document and subsequent revisions will be kept in the Repository to provide a record of the changes.


Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc. Nov 2022

Bmfou Pilot Project Rfc - Request For Change, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene Nov 2022

Approval Letter For The Draft Final Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp) (Dated November 4, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.