Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 121 - 150 of 2597

Full-Text Articles in Environmental Health and Protection

Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee Aug 2026

Deep Learning-Based Burned Area Mapping Of California Wildfires Using Sentinel-2 And Landsat-8 Imagery Enhanced With Super-Resolution Techniques, Youngmin Seo, Seung Hee Kim, Menas Kafatos, Jinsoo Kim, Yangwon Lee

Institute for ECHO Articles and Research

The increasing frequency of wildfires under a changing climate has led to extensive ecosystem destruction, highlighting the need for reliable burned area assessment using satellite imagery. Single-satellite data are constrained by observation gaps and interference from smoke and clouds, whereas multi-satellite data fusion can mitigate these limitations. Nonetheless, the fusion techniques still encounter challenges such as spatial information loss from resolution differences and cross-satellite domain mismatch. This study presents a burned area mapping framework that integrates super-resolution (SR) with transfer learning to address spatial and domain gaps in multi-satellite data. Specifically, Landsat-8 imagery is super-resolved to 7.5 m resolution, and …


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2026

Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on August 12, 2022, at the IR source area Butte Reclamation Evaluation System (BRES) No. 16 – Curry Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) required further evaluation of this IR Site since reclamation was conducted in 1991, prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (EPA, 2020) and because the Site did not meet BRES requirements during the 2017 assessment performed by the Clark Fork Watershed …


Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2026

Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …


Re: Approval Letter For The Diggings East 100% Remedial Design Package Submittal (Dated July 23, 2026), The 100% Sbcca Programmatic Technical Specifications Submittal (Technical Specifications) (Dated May 29, 2026), The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated July 29, 2026), The Final Sbcca Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated July 29, 2026), And The Final Sbcca Materials Management Plan (Mmp) (Dated July 29, 2026), Emma Rott Aug 2026

Re: Approval Letter For The Diggings East 100% Remedial Design Package Submittal (Dated July 23, 2026), The 100% Sbcca Programmatic Technical Specifications Submittal (Technical Specifications) (Dated May 29, 2026), The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated July 29, 2026), The Final Sbcca Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated July 29, 2026), And The Final Sbcca Materials Management Plan (Mmp) (Dated July 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran Aug 2026

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee Aug 2026

Quantitative Mapping And Mitigation Of Light Pollution At Erau, Desireé Robinson, Marcus Flesher, Axon Deadrick, Conner Callahan, Jarrett Usui, Josef Kaelin, Douglas Griswold, Raiden Keefer, Harrison A. Zimmermann, Cole Gresham, Maya Curtis, Ahnika Gee

Discovery Day - Daytona Beach

Light pollution is an increasingly urgent environmental and public safety concern that affects energy costs, astronomical research, ecological systems, human health, and aviation. At Embry-Riddle Aeronautical University (ERAU), artificial lighting from campus infrastructure and adjacent airport operations contributes to elevated skyglow, limiting the performance of the university’s 1-meter telescope and degrading the nighttime environment. This project seeks to quantitatively map and analyze light pollution across the ERAU Daytona Beach campus using custom-built Sky Quality Meters (SQMs) integrated with environmental sensors and mounted on an unmanned aerial system (UAS). By collecting calibrated sky brightness measurements at multiple altitudes and geospatial coordinates, …


Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Aug 2026

Butte Priority Soils Operable Unit (Bpsou) 2026 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr) (Dated June 26, 2026), Emma Rott Aug 2026

Re: Approval Letter For Draft Final Silver Bow Creek Conservation Area (Sbcca) Butte Reduction Works (Brw) Air Monitoring For Interim Demolition Activities – Phase Ii Data Summary Report (Dsr) (Dated June 26, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2026 (Dated June 26, 2026), Emma Rott Aug 2026

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2026 (Dated June 26, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2026

Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Influence Of Transboundary Wildfire Smoke On Fine Particulate Matter Concentrations At South Texas Border Schools, Sai Deepak Pinakana, Kabir Bahadur Shah, Owen Temby, Dawid K. Wladyka, Juan L. Gonzalez, Md Saydur Rahman, Katarzyna Sepielak, Amit U. Raysoni Aug 2026

Influence Of Transboundary Wildfire Smoke On Fine Particulate Matter Concentrations At South Texas Border Schools, Sai Deepak Pinakana, Kabir Bahadur Shah, Owen Temby, Dawid K. Wladyka, Juan L. Gonzalez, Md Saydur Rahman, Katarzyna Sepielak, Amit U. Raysoni

School of Earth, Environmental, & Marine Sciences Faculty Publications

Exposure to air pollutants in indoor and outdoor school environments poses significant health risks to children due to their heightened vulnerability. Increasing wildfire frequency has intensified transboundary smoke transport, with border communities among the first to experience associated air quality impacts. While the impacts of wildfires on air quality are increasingly recognized through satellite observations and modeling, ground-based observations remain scarce in under-monitored regions. Low-cost air sensors were deployed across schools in the Roma and Rio Grande City areas of Starr County, along the U.S.–Mexico border, for 146-days from November 2023 to April 2024. The raw sensor measurements were corrected …


Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc. Aug 2026

Revised Draft Final Butte Mine Waste Repository Operation And Maintenance (O&M) Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2026

Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc. Aug 2026

Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran Aug 2026

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran Aug 2026

Bpsou Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (Ccr), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari Jul 2026

A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari

Civil Engineering Faculty Publications

Water quality analysis plays an essential role in maintaining the health and sustainability of river ecosystems, especially in semi-arid regions like the Arroyo Colorado Watershed in South Texas. Since the river is a vital source of water supply for local communities, agriculture, and wildlife, it faces significant challenges and pollution from land use changes, climate variation, and agricultural runoff. Continuous monitoring and assessment of water quality parameters and their temporal variability are essential to ensure the drinking water supply and aquatic ecosystem health. However, comprehensive laboratory-based water quality investigations are often constrained by higher costs, logistical complexity, and limited manpower. …


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby Jul 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson Jul 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.