Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 369

Full-Text Articles in Environmental Sciences

Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty Sep 2026

Re: Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (Rawp) Request For Change Ur-2026-Ra-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott Aug 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated August 24, 2026) And The 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated August 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Aug 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-35 Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Insufficiently Reclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the exposure of historical mine waste. Although many source areas have been previously reclaimed, areas exist where reclamation was completed prior to the establishment of the Butte Hill Revegetation Specifications (BHRS) or reclaimed areas that have failed consecutive Butte Reclamation Evaluation System (BRES) inspections and now fall into either the Insufficiently Reclaimed or Reclamation Improvement category. In all these cases, additional work is required to comply with the BHRS to ensure the cap remains …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Aug 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

Unreclaimed sites exist within the Butte Priority Soils Operable Unit (BPSOU) that could pose a threat to human health or surface water quality due to the presence of historical mine waste. Although many source areas have been previously reclaimed, areas still exist in which soil has not yet been evaluated; such sites may provide a pathway for human exposure or impact surface water quality via stormwater runoff. These Unreclaimed sites will be evaluated in accordance with Appendix D, Attachment C, Section 8.0 of the BPSOU Consent Decree (referred to herein as CD) (EPA, 2020a).

This Quality Assurance Project Plan (QAPP) …


Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2026

Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 17 – Paymaster Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Butte Priority Soils Operable Unit (BPSOU) Reclamation Improvement (RI) Site Evaluation Summary Report (SESR) presents results of soil sampling conducted on October 11, 2023, at the Butte Reclamation Evaluation System (BRES) No. 17 – Paymaster Dump Site and adjacent areas (referred to herein as Site) within the BPSOU. The BPSOU Consent Decree (CD) (referred to herein as BPSOU CD; EPA, 2020) Appendix D, Attachment C Further Remedial Elements Scope of Work (FRESOW) prescribed further evaluation of sites reclaimed prior to establishment of the Butte Hill Revegetation Specifications (BHRS) (Appendix A to the BPSOU CD), which were initially established in …


Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Aug 2026

Butte Priority Soils Operable Unit Final 2024 Unreclaimed Sites Sampling: Ur-46 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2026

Final Bpsou Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott Jun 2026

Re: Comment Letter For The Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoon (Btl) System Annual Report – 2025 (Dated May 11, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby Jun 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Site Specific Corrective Action Plans For Quadrant 2, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby Jun 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: New And Mahoney (Ur-23) Construction Completion Report (Ccr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott Jun 2026

Re: Comment Letter For The Draft Final Butte Mine Waste Repository Operations And Maintenance (O&M) Plan (Dated May 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Jun 2026

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Revised Draft Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) (Dated May 13, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott May 2026

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (Dated April 24, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott May 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated April 16, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2026

2024 Annual Operations And Maintenance Report 2024 Bres Annual Summary Report For Work Completed In Quadrant 4, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17 Amendment (Dated April 28, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Apr 2026

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby Apr 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Whitehall Borrow Submittal #3 (Dated March 27, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc. Apr 2026

Draft Uniform Federal Policyquality Assurance Project Plan Addendum, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2026

Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites New And Mahoney (Ur-23) Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc. Apr 2026

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: Ur-03 Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.