Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Health and Protection

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 31 - 60 of 7756

Full-Text Articles in Environmental Sciences

Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc. Aug 2026

Draft Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Temporary Best Management Practices Work Plan: Bres No. 16 – Curry And Bres No. 50 – Zelia, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Temperature And Salinity Effects On The Physiology Of Bullfrog Tadpoles (Lithobates Catesbeianus) From A Suburban Temperate Wetland, Angela Brown Aug 2026

Temperature And Salinity Effects On The Physiology Of Bullfrog Tadpoles (Lithobates Catesbeianus) From A Suburban Temperate Wetland, Angela Brown

Theses, Dissertations and Culminating Projects

One of the most robust amphibians is the American Bullfrog, Lithobates catesbeianus, which is a widespread species that is invasive worldwide, and is broadly tolerant of a range of environmental conditions. Despite this tolerance, survival and performance of adult L. catesbeianus can be negatively affected by increasing temperatures and salinity resulting from anthropogenic impacts, such as climate change and road salts. This study focuses on the effects of acute salinity exposure (mimicking road salt influx into a pond) on L. catesbeianus tadpoles at different larval stages. Increased salinity was predicted to negatively affect two physiological performance measures. Critical maximum temperature …


2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Final 2022 Unreclaimed Sites Sampling: Ur-07 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Butte Priority Soils Operable Unit Final 2022 Unreclaimed Sites Sampling: Ur-27 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari Jul 2026

A Machine Learning Approach For Water Quality Assessment In The Lower Rio Grande Valley Watershed, Saika Nowshin Nowrin, Chu-Lin Cheng, Jungseok Ho, Jinwoo An, Fatemeh Nazari

Civil Engineering Faculty Publications

Water quality analysis plays an essential role in maintaining the health and sustainability of river ecosystems, especially in semi-arid regions like the Arroyo Colorado Watershed in South Texas. Since the river is a vital source of water supply for local communities, agriculture, and wildlife, it faces significant challenges and pollution from land use changes, climate variation, and agricultural runoff. Continuous monitoring and assessment of water quality parameters and their temporal variability are essential to ensure the drinking water supply and aquatic ecosystem health. However, comprehensive laboratory-based water quality investigations are often constrained by higher costs, logistical complexity, and limited manpower. …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Remedial Action Work Plan (Rawp), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson Jul 2026

Butte Priority Soils Operable Unit Diggings East Final 100% Remedial Design Package Submittal, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Unreclaimed Sites: Ur-07 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-27 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Draft Final 2024 Unreclaimed Sites Sampling: Ur-21 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby Jul 2026

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Butte Reclamation Evaluation System (Bres) Field Evaluation Summary Report And Technical Recommendations Proposal, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-46 Site Evaluation Summary Report (Sesr), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass Jul 2026

Clearing The Air: Tracking Spatial And Temporal Pm2.5 Variability Along A Biking Transect In Chicago, Beau R. Rass

DePaul Discoveries

Fine particulate matter (PM₂.₅) poses significant risks to human health and disproportionately affects marginalized communities in urban environments (World Health Organization [WHO], 2021; Tessum et al., 2021). Using low-cost mobile sensors, this study explored spatiotemporal PM₂.₅ concentration patterns along a north–south transect of Halsted Street in Chicago. A 2B Technologies Portable Aerosol Monitor (PAM) mounted on a bicycle was used to continuously record PM₂.₅ concentrations with associated GPS coordinates at approximately two-second intervals during 16 sampling events between 08-12-2025 and 10-05-2025. PM₂.₅ concentrations did not differ significantly among the South Side, West Loop, and North Side regions, contrary to the …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby Jul 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc. Jul 2026

Final Basinwide Quality Management Plan (Qmp) – 2026-2030, Revision 0, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Insurgent Until Proven Innocent: Land, Power, And The Right To Defend Rights, Kelsey Jost-Creegan Jul 2026

Insurgent Until Proven Innocent: Land, Power, And The Right To Defend Rights, Kelsey Jost-Creegan

Michigan Journal of International Law

As the climate crisis intensifies, advocates worldwide have stood up to defend their communities, territories, and environment. In response, they have faced violent retaliation. This repression persists despite evolving international, regional, and national-level legal frameworks around the “right to defend rights” and the “right to protection.” This article begins by providing a comprehensive overview of this evolving legal landscape. Against this backdrop, the article examines the tactics and architectures of violence used to repress land and environmental defenders through the lens of counterinsurgency theory.

The article proposes a typology of counterinsurgent violence including: surveillance; stigmatization; criminalization; arbitrary detention; infiltration; cooptation; …


Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston Jul 2026

Influence Of Stormwater Flooding Events On The Mobile County School District Student Population, Kadence Kali Johnston

Honors Theses

Mobile County, Alabama, receives among the highest annual rainfall totals in the United States resulting in frequent stormwater flooding that intersects with existing socioeconomic vulnerabilities. Within the Mobile County Public School System (MCPSS), 77% of students are economically disadvantaged and over 10% experience homelessness, creating heightened risk for educational disruption during flood events. This study investigates how stormwater flooding influences school attendance, closures, and academic performance across MCPSS, providing insight into how climate-driven hazards exacerbate educational inequities. The research integrates flood frequency, school performance metrics, and GIS flood-zone mapping and teacher perceptions to understand how flooding affects student learning opportunities. …


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services Jul 2026

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2025 Bres Site Specific Corrective Action Plans For Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Jul 2026

2026 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler Jul 2026

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty, Eric Hassler

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Jul 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-42 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Natural Radioactivity And Radiological Hazards In Sediments From The Lindi Coast, Indian Ocean, Tanzania, Viator Mujuni, Innocent J. Lugendo Jun 2026

Natural Radioactivity And Radiological Hazards In Sediments From The Lindi Coast, Indian Ocean, Tanzania, Viator Mujuni, Innocent J. Lugendo

Tanzania Journal of Science

The Lindi coast of the Indian Ocean, located in southeastern Tanzania, supports rich biodiversity and has recently experienced rapid growth in socio-economic activities such as fishing, mining, and oil and gas exploration. These activities may enhance levels of natural radioactivity in coastal sediments, potentially increasing radiation exposure to local populations. Therefore, monitoring radioactivity levels and estimating associated radiation doses in this region is important. In this study, thirty-six sediment samples were collected from twelve locations along the Lindi coast and analysed for naturally occurring radionuclides using high-purity germanium (HPGe) gamma-ray spectrometry. The activity concentrations of 226Ra, 232Th, and …


Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Silver Bow Creek Conservation Area (Sbcca) Operations And Maintenance (O&M) Plan (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott Jun 2026

Re: Conditional Approval Letter For Diggings East 100% Remedial Design Package Submittal (Dated May 29, 2006), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Final Revised Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap) (Dated May 28, 2026) And The Final Silver Bow Creek Conservation Area (Sbcca) Construction Monitoring Quality Assurance Project Plan (Qapp) (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott Jun 2026

Re: Conditional Approval Letter For The Final Silver Bow Creek Conservation Area Materials Management Plan (Dated May 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.