Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 541 - 570 of 1819

Full-Text Articles in Physical Sciences and Mathematics

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – December 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Jan 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – December 2024 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2024 Bres Site Specific Corrective Action Plans For Quadrant 1, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites 2024 Bres Site Specific Corrective Action Plans For Quadrant 1, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites - 2024 Bres Site Specific Corrective Action Plans For Quadrant 1, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Butte Reclamation Evaluation System Corrective Action Plans For Reclaimed Sites - 2024 Bres Site Specific Corrective Action Plans For Quadrant 1, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 604 S. Clark St. Butte, Mt 59701 January 24, 2025 Database Residential Identifier: R-01537, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 604 S. Clark St. Butte, Mt 59701 January 24, 2025 Database Residential Identifier: R-01537, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc. Jan 2025

Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Cccs Gym Annex, Christopher Berg, Thomas J. Beckman Jan 2025

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Cccs Gym Annex, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 615 W. Galena St. Butte, Mt 59701 January 23, 2025 Database Residential Identifier: R-05384, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 615 W. Galena St. Butte, Mt 59701 January 23, 2025 Database Residential Identifier: R-05384, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 537 S. Colorado St. Butte, Mt 59701 January 22, 2025 Database Residential Identifier: R-05338, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 537 S. Colorado St. Butte, Mt 59701 January 22, 2025 Database Residential Identifier: R-05338, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 1232 E. Second St. Butte, Mt 59701 January 21, 2025 Database Residential Identifier: R-04389, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 1232 E. Second St. Butte, Mt 59701 January 21, 2025 Database Residential Identifier: R-04389, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – Cccs Gym Annex (Dated October 4, 2024), Molly Roby Jan 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – Cccs Gym Annex (Dated October 4, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty Jan 2025

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-01, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Nrdp Comments On Bp-Atlantic Richfield (Bp-Ar’S) Draft Materials Management Plan And Associated Documents At Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site, Jim Ford Jan 2025

Nrdp Comments On Bp-Atlantic Richfield (Bp-Ar’S) Draft Materials Management Plan And Associated Documents At Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site, Jim Ford

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 122 W. Daly St. Butte, Mt 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 122 W. Daly St. Butte, Mt 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc. Jan 2025

Butte Reduction Works (Brw) Phase Ii Interim Demolition Plan Construction Drawings And Floodplain Encroachment Analysis, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi- Pathway Residential Metals Abatement Program (Rmap) Plan (Dated January 13, 2025), Molly Roby Jan 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Final Multi- Pathway Residential Metals Abatement Program (Rmap) Plan (Dated January 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2024 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Jan 2025

Butte Priority Soils Operable Unit (Bpsou) 2024 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01, Revision 1 (Dated December 13, 2024), Molly Roby Jan 2025

Approval Letter For Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-01, Revision 1 (Dated December 13, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Jan 2025

Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Exhibit 2 “Basement Iswp” 223 N. Alabama St. Butte, Mt 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department Of Reclamation And Environmental Services Jan 2025

Exhibit 2 “Basement Iswp” 223 N. Alabama St. Butte, Mt 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Jan 2025

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company, Mark Thompson Jan 2025

Berkeley Pit And Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company, Mark Thompson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Jan 2025

Draft Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites: Ur-03 Site Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dsr), Pioneer Technical Services, Inc. Jan 2025

Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

This Silver Bow Creek Conservation Area (SBCCA) Repository Data Gap Data Summary Report (DSR) presents the results from the soil sampling activities conducted as specified in the SBCCA Repository Data Gap Quality Assurance Project Plan (QAPP) (referred to herein as the SBCCA Repository Data Gap QAPP; Atlantic Richfield Company, 2024). The information presented in this DSR includes laboratory analytical results from subsurface soil sampling collected from Buffalo Gulch (BG), Butte Reduction Works (BRW), Diggings East (DE), and Northside Tailings (NST) within the SBCCA. This DSR was prepared by Pioneer Technical Services, Inc. (Pioneer), 1101 S. Montana Street, Butte, Montana 59701 …


Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc. Jan 2025

Final Horseshoe Bend Effluent Line (Hbel) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson Dec 2024

Re: Silver Bow Creek Butte Area Npl Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024., Dave Griffis Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024., Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Sbcca Principles For A Greener Cleanup Report, Josh Bryson Dec 2024

Butte Priority Soils Operable Unit Sbcca Principles For A Greener Cleanup Report, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-02, Mike Mcanulty Dec 2024

Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir- 2024-Ra-02, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites And Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby Dec 2024

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final Bpsou Insufficiently Reclaimed Sites Belle Of Butte (Bres No. 8 & Ur-39) Remedial Action Work Plan (Rawp) Request For Change Ir-2024-Ra-02 (Dated December 19, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.