Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 451 - 480 of 1810

Full-Text Articles in Physical Sciences and Mathematics

Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott May 2025

Re: Acknowledgement Letter For The Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott May 2025

Re: Comment Letter For The 2023 Butte Priority Soils Operable Unit (Bpsou) Groundwater Compliance Evaluation (Dated March 10, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby May 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Quality Assurance Project Plan (Qapp) (Non-Residential Parcels And Residential Daycares) (Dated February 26, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 4 2024 (Dated March 28, 2025), Emma Rott May 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 4 2024 (Dated March 28, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Annual Operations And Maintenance Report, Butte Silver Bow May 2025

2022 Annual Operations And Maintenance Report, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Annual Operations And Maintenance Report 2023 Bres Annual Summary Report For Work Completed In Quadrant 3, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2023 Annual Operations And Maintenance Report 2023 Bres Annual Summary Report For Work Completed In Quadrant 3, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2023 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2024 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2024 Annual Operations And Maintenance Report, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Annual Operations And Maintenance Report 2022 Bres Annual Summary Report For Work Completed In Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services May 2025

2022 Annual Operations And Maintenance Report 2022 Bres Annual Summary Report For Work Completed In Quadrant 2, Butte-Silver Bow Department Of Reclamation And Environmental Services

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. May 2025

Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed (Ur) Sites: Ur-35 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap): Koprivica Park Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2023 Residential Metals Abatement Program (Rmap): Koprivica Park Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Draft Final 2023 Residential Metals Abatement Program (Rmap) Butte-Silver Bow Parks Soil Remedial Action Construction Completion Report (Ccr), Pioneer Technical Services, Inc. Apr 2025

Re: Draft Final 2023 Residential Metals Abatement Program (Rmap) Butte-Silver Bow Parks Soil Remedial Action Construction Completion Report (Ccr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Bpsou Superfund Stormwater Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels, Josh Bryson Apr 2025

Re: Bpsou Superfund Stormwater Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Corrective Action Plans (Dated January 27, 2025), Molly Roby Apr 2025

Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Corrective Action Plans (Dated January 27, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated April 4, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (Dated April 4, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott Apr 2025

Re: Approval Letter For The Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability Study (Dated February 27, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 84 – Mandan Park Site Evaluation Summary Report, Mike Mcanulty Apr 2025

Butte Priority Soils Operable Unit Draft Final 2023 Reclamation Improvement Sites Sampling: Bres No. 84 – Mandan Park Site Evaluation Summary Report, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson Apr 2025

Butte Priority Soils Operable Unit (Bpsou) 2025 Monthly Progress Report. Consent Decree For The Butte Priority Soils Operable Unit. Civil Action No. Cv 89-039-Bu-Seh, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby Apr 2025

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites (Ur-35) Remedial Action Work Plan (Rawp) (Dated June 14, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated November 15, 2024), Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2024 Field Evaluation Summary And Technical Recommendations Report (Dated November 15, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-03 Remedial Action Work Plan (Rawp) (Dated January 27, 2025)., Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Ur-03 Remedial Action Work Plan (Rawp) (Dated January 27, 2025)., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby Apr 2025

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Dated February 14, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek Pdier, Hgl Apr 2025

Blacktail Creek Pdier, Hgl

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Blacktail Creek Energy Laboratories Metals & Mercury Laboratory Analysis Results With Hgl 2b Data Validation Qualifiers, Pioneer Technical Services, Inc. Apr 2025

Blacktail Creek Energy Laboratories Metals & Mercury Laboratory Analysis Results With Hgl 2b Data Validation Qualifiers, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2024 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc. Apr 2025

Draft Final 2024 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Apr 2025

Draft Final 2022 Unreclaimed Sites Sampling: Ur-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty Mar 2025

Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.