Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 331 - 360 of 1810

Full-Text Articles in Physical Sciences and Mathematics

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott Sep 2025

Re: Comment Letter For Bpsou Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (Dated July 31, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2025

Re: Continued Use Of The Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area Npl Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 181 – Mountain Con-3 Dump., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump (Dated August 21, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis Sep 2025

Settling Defendants Bmfou Annual Report Consent Decree For The Butte Mine Flooding Site Cd, Cv 02-35 Bu-Rfc Remedial Action – Implementation Of The Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Reclamation Improvement Sites Field Sampling And Investigation Plan (Fsp): Bres No. 18 – Walkerville Ballfield, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 18 – Walkerville Ballfield (Dated August 13, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 100 – Capri Motel-Arctic Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby Sep 2025

Re: Comment Letter For The Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New And Mahoney (Ur-23) Construction Completion Report., Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty Sep 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 120 – Bonanza Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby Sep 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 120 – Bonanza Dump (Dated August 12, 2025), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc. Sep 2025

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran Sep 2025

Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, And Soil Characterization 2021-2023 Surface Water And Groundwater Seep Evaluation 2023 Waterloo Aps Soil And Groundwater Evaluation, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2025

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott Sep 2025

Epa Region 8 Optimized Ufp-Qapp Review Crosswalk, Environmental Protection Agency, Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc. Sep 2025

Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran Sep 2025

Draft 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister Aug 2025

Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis Aug 2025

Re: Butte Mine Flooding Operable Unit Berkeley Pit And Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson, Dave Griffis

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott Aug 2025

Re: Approval Letter For Bpsou Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation And Functional Assessment (Received August 8, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister Aug 2025

Re: 2025 Spring Migration Seasonal Report For Berkeley Pit Waterfowl Protection Plan, Mark Thompson, Loren Burmeister

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott Aug 2025

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 1 2025 (Dated June 30, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott Aug 2025

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Notice Of Intent To Abandon Bps07-05a And Bps07-05b (Dated July 14, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott Aug 2025

Re: Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Superfund Operation And Maintenance (O&M) Request For Maintenance – Kelley Stormwater Channels (Revised On July 23, 2025), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Bres No. 94 – Rialto Dump Reclamation Improvement (Ri) Field Sampling Plan (Fsp)., Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 177 – North Alice Culvert, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (Fsp): Bres No. 26 – Cripple Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty Aug 2025

Re: Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan (Fsp): Bres No. 91 – Robert Emmett Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc. Aug 2025

Draft Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.