Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1321 - 1350 of 1810

Full-Text Articles in Physical Sciences and Mathematics

Draft Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2022

Draft Final 2022 Residential Metals Abatement Program (Rmap) Cherokee Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Nov 2022

Draft Final 2022 Residential Metals Abatement Program (Rmap) Koprivica Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Erm Corrective Action Response, Elsie King Nov 2022

Erm Corrective Action Response, Elsie King

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Rmap Interior Schools Project, Liz Stacks Nov 2022

Rmap Interior Schools Project, Liz Stacks

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty Nov 2022

Approved Final Butte Priority Soils Operable Unit (Bpsou) Unreclaimed Sites Field Sampling Plan (Fsp) Package #7: Ur-01, Ur-12, Ur-03, Ur-04, Ur-15, And Ur-17, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Nov 2022

2022 Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan, 2023, Montana Bureau Of Mines And Geology Nov 2022

Quality Assurance Project Plan, 2023, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Quality Assurance Project Plan, 2023 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology Nov 2022

Quality Assurance Project Plan, 2023 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau Of Mines And Geology

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 8 – Belle Of Butte, Mike Mcanulty Oct 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 8 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty Oct 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling And Investigation Plan (Fsp) Bres No. 08 – Belle Of Butte, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For Revised Draft 2021 Stormwater Evaluation And Maintenance Report (Dated October 13, 2022), Nikia Greene Oct 2022

Approval Letter For Revised Draft 2021 Stormwater Evaluation And Maintenance Report (Dated October 13, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Final Bpsou Subdrain Pump Station Quality Assurance Project Plan (Dated October 7, 2022), Nikia Greene Oct 2022

Comment Letter For Draft Final Bpsou Subdrain Pump Station Quality Assurance Project Plan (Dated October 7, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program (Rmap), Interior School Soils – Remedial Action Work Plan (Rawp), Butte High School (Dated October 5, 2022), Nikia Greene Oct 2022

Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Residential Metals Abatement Program (Rmap), Interior School Soils – Remedial Action Work Plan (Rawp), Butte High School (Dated October 5, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 2, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated October 3, 2022), Nikia Greene Oct 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Revision No. 2, Residential Metals Abatement Program (Rmap), Quality Assurance Project Plan (Qapp), Non-Residential Parcels – Indoor Dust (Dated October 3, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report (August 8, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-36 Site Evaluation Summary Report (August 8, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report (July 26, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-24 Site Evaluation Summary Report (July 26, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated June 10, 2022), Nikia Greene Oct 2022

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (Pdi) Evaluation Report (Dated June 10, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Second Quarter 2022, Dated September 21, 2022, Nikia Greene Oct 2022

Comments On Berkeley Pit And Discharge Pilot Project, Quarterly Pilot Project Report, Second Quarter 2022, Dated September 21, 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report (August 3, 2022), Nikia Greene Oct 2022

Comments For The Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling Ur-03 Site Evaluation Summary Report (August 3, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc. Oct 2022

Final Bpsou Subdrain Pump Station Remedial Design (Rd) Work Plan, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene Sep 2022

Comment Letter For: Quality Assurance Project Plan: Long-Term Operation And Maintenance Of Railroad Assets, For Bnsf Railway Company And Union Pacific Railroad, Butte Priority Soils Operable Unit (Dated May 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2022

Final Revised Butte Reduction Works (Brw) Phase I Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene Sep 2022

Comment Letter For Draft Blacktail Creek (Btc) Groundwater Hydraulic Control System Remedial Design Work Plan (Rdwp) (Dated July 22, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty Sep 2022

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 34 – Eveline And Response To Agency Comments, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 8 – Belle Of Butte (Dated August 2, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene Sep 2022

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (Fsp) Bres No. 38 – Sister Dump (Dated June 16, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene Sep 2022

Approval Letter For: Butte Priority Soils Operable Unit (Bpsou) Revised Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (Dated July 20, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Concurrence And Comments On: Sd Response To The Agencies Proposed Raar Path Forward Letter, Dated March 28, 2022 And Pilot Project Annual Update Letter, Dated July 1, 2022, Nikia Greene Sep 2022

Concurrence And Comments On: Sd Response To The Agencies Proposed Raar Path Forward Letter, Dated March 28, 2022 And Pilot Project Annual Update Letter, Dated July 1, 2022, Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.