Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1051 - 1080 of 1826

Full-Text Articles in Physical Sciences and Mathematics

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Aug 2023

Butte Priority Soils Operable Unit (Bpsou) Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Stodden Park Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Rmap Baptist Student Union (Former Mckinley School) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc. Aug 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Gold Hill Lutheran Church (Containing The Creativity Factory Preschool) Soil Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Request For Change (Rfc)-Brw-2023-03 To The Final Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Phase Iii Quality Assurance Project Plan (Qapp) (Phase Iii) (Dated June 29, 2023)., Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson Aug 2023

Final Approved Request For Change Bg-2023-01 To Final Bpsou Hydrocarbon Sampling And Treatability Study Quality Assurance Project Plan (Qapp), Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc. Aug 2023

2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (Qapp) Revision 2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc. Aug 2023

2022 Final Unreclaimed Sites Quality Assurance Project Plan (Qapp) Revision 1, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Re: Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Aug 2023

Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene Aug 2023

Comments On The Butte Priority Soils Operable Unit (Bpsou) Draft Blacktail Creek Riparian Actions, Pre-Design Investigation Work Plan & Uniform Federal Policy- Quality Assurance Project Plan, (Dated June 27, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene Aug 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Groundwater Monitoring Data Summary Report, January 2022 – December 2022 (Dated April 10, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Request For Change (Rfc) To The Butte Priority Soils Operable Unit (Bpsou) Revised Request For Change (Rfc)-Brw-2023-02 To The Butte Reduction Works (Brw) Smelter Area Mine Waste Remediation And Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (Qapp) For Microbial Analysis And Biotreatability (Dated July 13, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Re: Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene Aug 2023

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Covering Aldersgate United Methodist Church] (Dated July 31, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene Aug 2023

Comments For The Draft Residential Metals Abatement Program – Indoor Soil – Investigation Summary Report – Butte High School (Received July 5, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow Aug 2023

Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company, Butte Silver Bow

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene Aug 2023

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Revised 2023 Residential Metals Abatement Program (Rmap) Field Sampling Plan (Fsp) – Indoor Dust – Group 8 – Gold Hill Lutheran Church (Creativity Factory Preschool) And United Congregational (Crayon Academy Preschool) (Dated July 26, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Re: Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Re: Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene Jul 2023

Conditional Approval For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) 2021 Annual Operations And Maintenance (O&M) Report, 2021 Bres Annual Summary Report For Work Completed In Quadrant 1 (Dated November 18, 2022), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene Jul 2023

Comments On The Draft Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Site- Wide Surface Water Monitoring Data Summary Report (Dated April 7, 2023), Nikia Greene

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty Jul 2023

Butte Priority Soils Operable Unit (Bpsou) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (Fsp) Bres No. 84 – Mandan Park Play Area, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc. Jul 2023

Draft Final 2023 Residential Metals Abatement Program (Rmap) Park Soil Sampling Field Sampling Plan (Fsp) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran Jul 2023

2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp), Woodard & Curran

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.