Full-Text Articles in Physical Sciences and Mathematics

Environmental Assessment Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming, United States Department Of The Interior, Bureau Of Reclamation Jul 2010

Environmental Assessment Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming, United States Department Of The Interior, Bureau Of Reclamation

Environmental Assessments (WY)

The Seedskadee Project is a participating project in the Colorado River Storage Project. Principle features of the project are the Fontenelle Dam, Powerplant, and Reservoir. The project is located on the Green River some 24 miles southeast of LaBarge, Wyoming in Lincoln County. The dam is located at latitude: 42.0285593 - longitude: -110.0604315. The project features, along with worker housing, were built beginning in 1961 and completed in 1964. The houses and associated infrastructure (road) are in need of extensive renovation. Reclamation conducted a value engineering study to review options to meet the need for improved employee housing, and this …


Environmental Assessment For The Seminoe Road Coalbed Methane Pilot Project, Carbon County, Wyoming, United States Department Of The Interior, Bureau Of Land Management Jan 2001

Environmental Assessment For The Seminoe Road Coalbed Methane Pilot Project, Carbon County, Wyoming, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (WY)

Analysis of the environmental consequences has led to the determination that this proposed project, with the appropriate mitigating measures, will not have a significant effect on the human environment. Therefore, an Environmental Impact Statement will not be required. Pending the results of a public review of this document, the Bureau of Land Management (BLM) will prepare a formal Decision Record.


Environmental Assessment And Finding Of No Significant Impact For The Modified Jonah Field Ii Natural Gas Project, Sublette County, Wyoming, United States Department Of The Interior, Bureau Of Land Management Jan 2000

Environmental Assessment And Finding Of No Significant Impact For The Modified Jonah Field Ii Natural Gas Project, Sublette County, Wyoming, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (WY)

Both the Pinedale Resource Area Resource Management Plan and the Green River Resource Area Resource Management Plan provide for the use of these public lands for oil and natural gas development. The Proposed Action would be in conformance with these land use plans, and no amendments to the RMPs would be necessary to implement the Proposed Action.


Lighthouse Coal Bed Methane Project Environmental Assessment, United States Department Of The Interior Bureau Of Land Management Jan 1995

Lighthouse Coal Bed Methane Project Environmental Assessment, United States Department Of The Interior Bureau Of Land Management

Environmental Assessments (WY)

American Oil and Gas Corporation (American), also doing business as Martens and Peck Operating, proposes a coal bed methane (CBM) project called the Lighthouse project near Gillette, Wyoming in central Campbell County just south of the Marquiss CBM project. Wells drilled in the project area would be from intermingled private, state, and federal oil and gas properties. At full production, American hopes to produce methane gas from a maximum of 200 wells completed in the Wyodak coal seam in the Lighthouse project area. Of the 200 wells, 100 would produce federally owned methane gas.


Environmental Assessment, Carter Mountain-Thermopolis 230-Kv Transmission Line Project, Hot Springs County, Wyoming, U.S. Department Of Energy Jan 1992

Environmental Assessment, Carter Mountain-Thermopolis 230-Kv Transmission Line Project, Hot Springs County, Wyoming, U.S. Department Of Energy

Environmental Assessments (WY)

The Western Area Power Administration (Western) is proposing to construct, operate, and maintain a new 230-kV transmission line between the Carter Mountain and Thermopolis Substations in northcentral Wyoming (Hot Springs County). The project area is shown on Map 2-1. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality and the Department of Energy, which is responsible for approval of the proposed action. The Bureau of Land Management (BLM) is a cooperating agency on the project and is also the Federal review agency responsible for granting rights-of-way …


Environmental Assessment Seminoe-Kortes Transmission Line/Substation Consolidation Project, Carbon County, Wyoming, U.S. Department Of Energy Jan 1990

Environmental Assessment Seminoe-Kortes Transmission Line/Substation Consolidation Project, Carbon County, Wyoming, U.S. Department Of Energy

Environmental Assessments (WY)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlins, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential …