Open Access. Powered by Scholars. Published by Universities.®
Physical Sciences and Mathematics Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Environmental Sciences (1905)
- Environmental Monitoring (1890)
- Environmental Indicators and Impact Assessment (1882)
- Environmental Health and Protection (1881)
- Earth Sciences (496)
-
- Geology (460)
- Engineering (446)
- Geophysics and Seismology (424)
- Civil and Environmental Engineering (421)
- Environmental Engineering (420)
- Other Engineering (420)
- Materials Science and Engineering (414)
- Other Materials Science and Engineering (413)
- Metallurgy (412)
- Ceramic Materials (404)
- Geochemistry (16)
- Chemistry (15)
- Hydrology (13)
- Environmental Law (9)
- Law (9)
- Soil Science (8)
- Geological Engineering (7)
- Physics (7)
- Computer Sciences (4)
- Life Sciences (4)
- Mining Engineering (4)
- Other Earth Sciences (4)
- Engineering Education (3)
- Other Environmental Sciences (3)
- Keyword
-
- Priority Soils (417)
- Montana (267)
- Metals Abatement (228)
- Field Sampling (169)
- Unreclaimed Sites (152)
-
- Butte (151)
- Quality Assurance (132)
- Consent Decree (130)
- Groundwater (109)
- Insufficiently Reclaimed Sites (102)
- Copper (94)
- Indoor Dust (74)
- Berkeley Pit (67)
- Butte Treatment Lagoon (64)
- Soil Sampling (63)
- Lead (60)
- Groundwater Monitoring (55)
- Mercury (53)
- Smelter Area (53)
- Blacktail Creek (52)
- Maintenance (52)
- Stormwater (52)
- Surface Water Monitoring (50)
- Arsenic (47)
- Silver Bow Creek (45)
- Maintenance Report (44)
- Butte Reduction Works (41)
- Monitoring (41)
- Zinc (41)
- Residential Metals Abatement (39)
- Publication Year
- Publication
- Publication Type
- File Type
Articles 241 - 270 of 2422
Full-Text Articles in Physical Sciences and Mathematics
Re: Conditional Approval Letter For Revised Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Data Summary Report 2024 And Response To Epa Comment Letter (Dated February 24, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Sister Dump (Bres No. 38) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Final Silver Bow Creek Conservation Area (Sbcca) Construction Quality Assurance Plan (Cqap), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Effects Of Prescribed Burning On Forest Soil Low-Molecular-Weight Organic Acids, Ariana Guiscelle Rivera-Anazco
Effects Of Prescribed Burning On Forest Soil Low-Molecular-Weight Organic Acids, Ariana Guiscelle Rivera-Anazco
Graduate Theses & Non-Theses
Low-molecular-weight organic acids (LMWOAs) play important roles in nutrient mobilization, microbial activity, and carbon cycling in forest soils, yet their response to prescribed fire and thinning remains poorly understood. This thesis examined whether thinning and prescribed burning altered extractable LMWOA in O-horizon soils from the Lubrecht Experimental Forest. The study focused on lactic, propionic, glycolic, acetic, and formic acids measured in soils collected immediately before and approximately two weeks after the 2024 prescribed burn across four treatment categories: control, burn, thin, and thin+burn. The managed plots belong to a long-term experiment first treated in 2001-2002, whereas the control remained unmanaged …
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.
Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa
Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Draft Final 2025 Bpsou Subdrain Data Summary Report (Dsr), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.
Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson
Silver Bow Creek Conservation Area (Sbcca) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty
Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Josephine Shaft (Bres No. 37) Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (Dated February 4, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (Bpsou) Insufficiently Reclaimed Sites Bres No. 30 – Atlantic 1 Remedial Action Work Plan (Rawp), Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2023 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2022 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft 2024 Stormwater Evaluation And Maintenance Report (Dated February 27, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comment Letter For The 2020 Through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area Npl Site, Butte Priority Soils Operable Unit (Bpsou) Consent Decree-Civil Action No. Cv89-039-Bu-She (Dated February 3, 2026), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Butte Treatment Lagoons (Btl) Groundwater Treatment System Quarterly Operation And Maintenance Report – Quarter 3 2025 (Dated December 23, 2025), Emma Rott
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: Bres No. 16 Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 50 – Zelia Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Intermediate (60%) Remedial Design Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: Bres No. 96 – Washoe Dump Site Evaluation Summary Report, Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Draft Final Remedial Design Work Plan Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final Phase I Pre-Design Investigation Evaluation Report Blacktail Creek Riparian Actions Butte Priority Soils Operable Unit Of The Silver Bow Creek/Butte Area Superfund Site Silver Bow County, Montana, Hydrogeologic, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Monthly Progress Report Butte Priority Soils Operable Unit Consent Decree Partial Remedial Design/Remedial Action And Operation And Maintenance, Josh Bryson
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Conditional Approval Letter With Comments For The Draft Final 2026 Residential Metals Abatement Program (Rmap) Anselmo Mine Yard Development Plan (Dated February 25, 2026), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler
Butte Medical Monitoring Working Group Meeting, Mike Mcanulty, Eric Hassler
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.