Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Natural Resources Management and Policy

Series

Water resources development

Institution
Publication Year
Publication

Articles 31 - 46 of 46

Full-Text Articles in Physical Sciences and Mathematics

Groundwater Pollution Problems In Mining And Energy Production, Henry W. Ipsen Jun 1983

Groundwater Pollution Problems In Mining And Energy Production, Henry W. Ipsen

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

17 pages.


Subsidence Of Land Caused By Ground-Water Pumping, Thomas L. Holzer Jun 1983

Subsidence Of Land Caused By Ground-Water Pumping, Thomas L. Holzer

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

22 pages (includes illustration).

Contains references (pages 2-6).


Groundwater Quality: The Issues, Remedies And Strategies, Kathleen M. Kulasza Jun 1983

Groundwater Quality: The Issues, Remedies And Strategies, Kathleen M. Kulasza

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

34 pages.


Hydrology: Unraveling The Mysteries Of Groundwater Occurrence And Movement, Thomas M. Stetson Jun 1983

Hydrology: Unraveling The Mysteries Of Groundwater Occurrence And Movement, Thomas M. Stetson

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

31 pages (includes illustrations).

Glossary omitted.


Legal Systems For Allocating Groundwater And Controlling Its Extraction, Charles F. Wilkinson Jun 1983

Legal Systems For Allocating Groundwater And Controlling Its Extraction, Charles F. Wilkinson

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

22 pages (includes illustration).

Contains research sources list (pages 1-2).


Sustaining Aquifer Productivity, Harrison C. Dunning Jun 1983

Sustaining Aquifer Productivity, Harrison C. Dunning

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

12 pages.

Includes full text of the Owens Valley Groundwater Management Referendum Measure A, which is an ordinance to regulate the extraction of groundwater within the Owens Valley groundwater basin.


Observations On Groundwater Law From The Federal Perspective, Carol E. Dinkins Jun 1983

Observations On Groundwater Law From The Federal Perspective, Carol E. Dinkins

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

66 pages.

Contains several cases and US Congress bills as supplemental materials.

Digitized copy lacks the Memorandum Opinion for City of El Paso v. Reynolds (563 F.Supp 379 (D. New Mexico 1983)).


Agenda: Groundwater: Allocation, Development And Pollution, University Of Colorado Boulder. Natural Resources Law Center Jun 1983

Agenda: Groundwater: Allocation, Development And Pollution, University Of Colorado Boulder. Natural Resources Law Center

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

Even before the [Natural Resources Law] Center was established [in the fall of 1981], the [University of Colorado] School of Law was organizing annual natural resources law summer short courses. To date four programs have been presented:

- July 1980: "Federal Lands, Laws and Policies-and the Development of Natural Resources"

- June 1981: "Water Resources Allocation: Laws and Emerging Issues"

- June 1982: "New Sources of Water for Energy Development and Growth: lnterbasin Transfers"

- June 1983: "Groundwater: Allocation; Development and Pollution"

(Reprinted from Resource Law Notes, no. 1, Jan. 1984, at 1.)

University of Colorado School of Law professors …


Agenda: New Sources Of Water For Energy Development And Growth: Interbasin Transfers: A Short Course, University Of Colorado Boulder. Natural Resources Law Center Jun 1982

Agenda: New Sources Of Water For Energy Development And Growth: Interbasin Transfers: A Short Course, University Of Colorado Boulder. Natural Resources Law Center

New Sources of Water for Energy Development and Growth: Interbasin Transfers: A Short Course (Summer Conference, June 7-10)

Even before the [Natural Resources Law] Center was established [in the fall of 1981], the [University of Colorado] School of Law was organizing annual natural resources law summer short courses. To date four programs have been presented:

- July 1980: "Federal Lands, Laws and Policies-and the Development of Natural Resources"

- June 1981: "Water Resources Allocation: Laws and Emerging Issues"

- June 1982: "New Sources of Water for Energy Development and Growth: lnterbasin Transfers"

- June 1983: "Groundwater: Allocation; Development and Pollution"

(Reprinted from Resource Law Notes, no. 1, Jan. 1984, at 1.)

Faculty for this conference included University of …


Agenda: Water Resources Allocation: Laws And Emerging Issues: A Short Course, University Of Colorado Boulder. Natural Resources Law Center Jun 1981

Agenda: Water Resources Allocation: Laws And Emerging Issues: A Short Course, University Of Colorado Boulder. Natural Resources Law Center

Water Resources Allocation: Laws and Emerging Issues: A Short Course (Summer Conference, June 8-11)

Even before the [Natural Resources Law] Center was established [in the fall of 1981], the [University of Colorado] School of Law was organizing annual natural resources law summer short courses. To date four programs have been presented:

- July 1980: "Federal Lands, Laws and Policies-and the Development of Natural Resources"

- June 1981: "Water Resources Allocation: Laws and Emerging Issues"

- June 1982: "New Sources of Water for Energy Development and Growth: lnterbasin Transfers"

- June 1983: "Groundwater: Allocation; Development and Pollution"

(Reprinted from Resource Law Notes, no. 1, Jan. 1984, at 1.)

Speakers and instructors for this short course …


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Definite Plan Report On Southern Nevada Water Project, Nevada (First Stage): Project Development Report, U.S. Bureau Of Reclamation Aug 1967

Definite Plan Report On Southern Nevada Water Project, Nevada (First Stage): Project Development Report, U.S. Bureau Of Reclamation

Publications (WR)

This report presents the results of definite plan studies of the Southern Nevada Water Project in Clark County, southeastern Nevada. Construction of this project was authorized under Public Law 89-292 dated October 22, 1965. Authorization of the Southern Nevada Water Project was based on a project plan outlined in the feasibility report of August 1963 as supplemented in April 1965. The definite plan studies have confirmed the general project plan of the 1963 report as supplemented but some important modifications are now contemplated as explained in Part IV.

The project will be constructed in three stages. Stage development is desirable …