Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Engineering

PDF

1978

Institution
Keyword
Publication
Publication Type

Articles 31 - 60 of 109

Full-Text Articles in Physical Sciences and Mathematics

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix E: Aquatic Ecosystem And Fisheries Studies (Supplement), Christoipher J. Schmitt, Dennis R. Sasseville, Normandeau Associates, Inc., New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

Sediment mercury concentrations higher than levels normall y considered trace or background were encountered up to 80 cm belo w the sediment-water interface in samples obtained from four oligotrophi c lakes in northern Maine . These lakes are in three different watershed s and are as far as 65 km apart . The values reported are far lower than levels reported elsewhere from contaminated sites . The distributio n and magnitude of the sediment concentrations encountered suggest long-ter m diffuse mercury inputs to the lakes from the watersheds . In addition , concentrations up to twice as high in near-surface …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc. Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix G: Recreation Resources (Revised June 1978), U.S. Army, Corps Of Engineers, New England Division, Northern Maine Regional Planning Commission, Land Use Consultants, Inc.

Dickey-Lincoln School Lakes Project

The purpose of this report is to evaluate and describe the existing recreational use and resources of the project area and the encompassing study area and to project the future use of those resources both with and without the Dickey-Lincoln School Lakes Project. The primary impact area of the proposed project (project area) includes the St. John River watershed upstream of the proposed damsites to the confluence of Nine-mile Brook. The area is bounded by the watershed divide with the Allagash River on the east and the Canadian Border on the west. Major tributaries of the St. John affected by …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

A review of available literature on rural communities which have been affected by construction projects of a similar scale has been completed. This review will aid in the development of a scenario of the construction labor peak and decline effects on the Dickey-Lincoln area.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix J: Coordination With Other Agencies & Public Involvement (Supplement), New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This agency will be particularly concerned about any impact which this project might have on any existing, proposed or known units of the National Park System, or any known historic, natural or environmental education sites which are currently part of , or eligible for, the National Landmark Program. This report is a planning aid for the proposed Dickey-Lincoln Dams and Reservoirs project in Maine. A number of endangered, rare, or unique animal species are known or suspected to occur in the project area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy

Dickey-Lincoln School Lakes Project

This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.


Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1978

Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy Jan 1978

Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.


Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers Jan 1978

Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.


Geotechnical Impact Study. Map Volume, United States Department Of Energy Jan 1978

Geotechnical Impact Study. Map Volume, United States Department Of Energy

Dickey-Lincoln School Lakes Project

Surficial Deposits Legend Maps of Dickey/Lincoln School lakes Transmission - E.I.S.Project, Environmental Assessment of Alternative Routs, Geotechnical Study, United States Department of the Interior.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Ecological Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Ecological Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Land Use Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Land Use Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix B: Alternative Power Transmission Corridors, United States Department Of Energy, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

This report identifies alternative corridors of land within which transmission lines could be routed and details various impacts on the environment which would be associated with introduction of transmission facilities. Many alternative corridor locations were identified (see Figure 1-1). Identification of these alternative transmission corridors was a complex process, since the number of potential corridors capable of connecting the various substations was myriad; the 'least desirable' potential corridors, i.e., those where transmission facilities might have entailed severest impacts on the environment, had to be eliminated from consideration before alternative corridors could be delineated. Identified alternative corridor locations were subsequently evaluated …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


The Response Of Various Soil Strength Indices To Changing Water Content And Bulk Density, Larry G. Wells, O. Treesuwan Jan 1978

The Response Of Various Soil Strength Indices To Changing Water Content And Bulk Density, Larry G. Wells, O. Treesuwan

Biosystems and Agricultural Engineering Faculty Publications

Various soil strength parameters were measured in the laboratory using a bevameter and a recording soil cone penetrometer. Measurements were made at various levels of soil bulk density and water content. Results were discussed in terms of similar published analyses. Two dissimilar methods of predicting vehicular tractive performance were compared and evaluated in terms of potential utility with respect to prediction of soil trafficability.


Deep Drainage As A Method Of Treating Saltland, Eric Bettenay Jan 1978

Deep Drainage As A Method Of Treating Saltland, Eric Bettenay

Journal of the Department of Agriculture, Western Australia, Series 4

In some situations, deep drainage may be warranted to return salt-affected land to full production.

This method is being investigated at CSIRO's Yalanbee Experiment Station.


Concrete Ships, Mark L. Lavache Jan 1978

Concrete Ships, Mark L. Lavache

Theses and Major Papers

The incentive behind this study is based on a two-fold premise: 1) that a comprehensive outline of the historical development of concrete shipbuilding and its related technologies is either non-existent or defies discovery, and 2) that although this study is neither based on a hypothesis, nor intended to resolve a problem area or promote a position, its merit lies in its inductive nature. Included are explanations of of the various compositions, uses, and construction techniques relating to reinforced concrete, ferro-cement, and prestressed concrete.


Information Systems For Natural Resources Managers: An Exercise In Interfacing, Connie L. Knapp Jan 1978

Information Systems For Natural Resources Managers: An Exercise In Interfacing, Connie L. Knapp

Theses and Major Papers

This thesis proposes guidelines for achieving the human interfaces which are requisite to the development and operation of natural resources information systems. Conclusions were drawn from an evaluation of past experiences in building and attempting to use these types of systems. Both successful and unsuccessful systems were considered, as well as the current effort in Rhode Island to develop a system for coastal resources managers. Examples are presented to support particular conclusions and recommendations. The perspective is nontechnical. Examples and recommendations, therefore, are conceptual rather than quantitative or technical. While a variety of mechanisms can be used to achieve the …


Effects Of Surface Drainage On Dryland Salinity, P R. George, T. R. Negus Jan 1978

Effects Of Surface Drainage On Dryland Salinity, P R. George, T. R. Negus

Journal of the Department of Agriculture, Western Australia, Series 4

Areas which are salt-affected are often also flooded. Although flooding is not the basic cause of salinity, surface drainage may improve conditions for plant growth, and this article describes suitable methods


Vulnerability Of Water Supply Systems To Drought, D. T. Jensen Jan 1978

Vulnerability Of Water Supply Systems To Drought, D. T. Jensen

Reports

The objective of this study is to develop a relatively simple and practical method for improving the availability and reliability of information about droughts to those responsibile for water supply management and planning. The information technique developed provides an objective basis for the selection of wate rsupply management alternatives during periods of drought. The derived drought information can assist water supply planners and managers in identifying priorities among proposed water supply developments fron consideration of water supply vulnerability and exisitng drought severity levels. Two drought indices are developed to achieve the overall objective of the study: (1) the drought severity …


Boeing Engineering And Construction; Groundwater And Surface Water Investigation Report, C. Earl Israelsen, Frank W. Haws Jan 1978

Boeing Engineering And Construction; Groundwater And Surface Water Investigation Report, C. Earl Israelsen, Frank W. Haws

Reports

Boeing Engineering and Construction (BEAC) is investigating the feasibility of transporting Utah coal via slurry pipeline to the west coast. Such an investigation requires an abundance of data concerning such things as they availability and quality of water which can be slurried with coal, the location of such water with respect to the deposits of coal, and the ultimate disposal of the water at the pipeline's end.

This study generated a limited amount of new data and gathered existing data and information related to surface and underground water within a 50-mile radius of Emery, Utah, but restricted primarily to the …


Feasibility Of Accelerating Construction Of The Central Utah Project, Trevor C. Hughes, L. Douglas James, Frank Haws, C. Earl Israelsen Jan 1978

Feasibility Of Accelerating Construction Of The Central Utah Project, Trevor C. Hughes, L. Douglas James, Frank Haws, C. Earl Israelsen

Reports

Introduction: Objective: In April, 1977 the President's statement on water projects recommended that a number of federal water development projects, including the Conneville unit of the Central Utah Project, not be completed. The ensuing efforts of project supporters brought about a review of the projected costs, benefits, and other political, social and environmental factors and consequently, the current issue is not whether or not the project should be constructed. Rather, the objective of this report is to examine the following question: Given the fact that at least the 5 units of the CUP which have already been authorized will eventually …


Research On Increased Precipitation By Cloud Seeding: Development Phase, Geoffrey E. Hill Jan 1978

Research On Increased Precipitation By Cloud Seeding: Development Phase, Geoffrey E. Hill

Reports

Development of several instrumentation systems for measuring atmospheric variables related to winter orogaraphic cloud seeding was undertaken. A heated tipping bucket precipitation gage was modified both for reliable use and accuracy of data. A solid state memory device was also developed at UWRL for this project. A parachute dropsonde for measuring vertical air motion was further developed. In addition, instrumentation was placed on board an aircraft for measuring concentrations of super cooled water, ice nuclei, and ice crystals. Airborne measurements during cloud seeding with silver iodide showed that the plumes of seeding material could be detected over a target area, …


Water Quality Analysis Laboratory Procedures Syllabus, P. A. Cowan, D. B. Porcella, V. D. Adams, L. A. Gardner Jan 1978

Water Quality Analysis Laboratory Procedures Syllabus, P. A. Cowan, D. B. Porcella, V. D. Adams, L. A. Gardner

Reports

Introduction: The 1976 edition of "Methods of Chemical Analysis of Water and Wastes" describes chemical analytical procedures to be sued in Water Quality Office (WQO) laboratoires. The methods were chose through the combined efforts of the Regional Analytical Quality Control (AQC) Coordinators, Laboratory Quality Control Officers, and other senior chemicsts in both federal and state laboratories. Method selection was based on the following criteria: 1. The method should measure the desired constitutent with precision and accuracy suffiecient to meet the data needs of WQO in the presence of the interferences normally encountered in polluted waters. 2. The procedures should utilize …