Open Access. Powered by Scholars. Published by Universities.®

Quality Improvement Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Quality Improvement

Optimizing Inventory Management To Reduce Medication Waste At A Low-Resource Clinic, Maqadus A. Khan Aug 2025

Optimizing Inventory Management To Reduce Medication Waste At A Low-Resource Clinic, Maqadus A. Khan

Doctor of Nursing Practice Final Project Abstract

Introduction

This project implemented standard operating procedures for inventory management in a low-resource clinic, incorporating First Expired, First Out (FEFO), Just-in-Time (JIT) ordering, and barcode scanning to reduce medication waste and optimize inventory processes. The aim was to reduce medication waste and optimize inventory processes.

Methodology

The Lean Six Sigma framework guided this project. Root causes of waste included inaccurate demand forecasting, lack of expiration tracking, insufficient staff training, poor stock rotation, and absence of standardized procedures. Baseline waste and practices were recorded. Medications were organized with nearing expirations upfront (FEFO), PAR levels were set, and JIT ordering implemented. Waste …


The Probability Of Success-Through Fault Tree Analytical Binomial Result, Tyleka Riddle May 2021

The Probability Of Success-Through Fault Tree Analytical Binomial Result, Tyleka Riddle

Night Flight: Online Literary Journal

Prestigious Appeal Rule of Thumb (Ear Drum Plugs)

In truant fashion, with proven accidental probabilistic perception for proposed cued facial expression recognition and voice commands without filtering. The estimated cost analysis for design and development generated from the enhanced project in the word "no”: Additionally, an audio noise effect size (ES) for desired level of comprehensive sensory receptors in sound reference to noisy party syndrome. Sytoss, (2019) "Resulting in a cocktail party theory for chalkboard distinction and conversation with applied facial recognition. As well as, the enhanced project management tool, EPMT, to provide output and input determination for higher-level acoustic …