Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Business (17)
- Engineering (11)
- Finance and Financial Management (7)
- Physical Sciences and Mathematics (7)
- Business Administration, Management, and Operations (6)
-
- Operations Research, Systems Engineering and Industrial Engineering (6)
- Social and Behavioral Sciences (4)
- Defense and Security Studies (3)
- Operational Research (3)
- Other Operations Research, Systems Engineering and Industrial Engineering (3)
- Public Affairs, Public Policy and Public Administration (3)
- Risk Analysis (3)
- Statistics and Probability (3)
- Technology and Innovation (3)
- Analysis (2)
- Aviation (2)
- Categorical Data Analysis (2)
- Civil and Environmental Engineering (2)
- Computer Sciences (2)
- Construction Engineering and Management (2)
- Entrepreneurial and Small Business Operations (2)
- Mathematics (2)
- Operations and Supply Chain Management (2)
- Organizational Behavior and Theory (2)
- Applied Statistics (1)
- Business Analytics (1)
- Data Science (1)
- Databases and Information Systems (1)
- Institution
- Keyword
-
- Cost growth (5)
- Acquisitions (3)
- Contracting (3)
- ACAT I (2)
- Acquisition (2)
-
- Cost Growth (2)
- Crowdsourcing (2)
- EAC (2)
- Estimate at Completion (2)
- Government Contracts (2)
- JDAL (2)
- Program management (2)
- Small Business Innovation Research (SBIR) (2)
- Weapon Systems (2)
- AFCS (1)
- Acquisition reform (1)
- Afghanistan (1)
- Air Force Military Construction (MILCON) (1)
- BMDO (1)
- Budget Estimates (1)
- Budget Growth (1)
- Budgets (1)
- Capabilities Based Assessment (CBA) (1)
- Capabilities development (1)
- Commercialization (1)
- Company Characteristics (1)
- Contingency (1)
- Contract Structure (1)
- Contract portfolio management (1)
- Contractor Maintenance (1)
Articles 31 - 33 of 33
Full-Text Articles in Government Contracts
Cost Overrun Optimism: Fact Or Fiction, David D. Christensen
Cost Overrun Optimism: Fact Or Fiction, David D. Christensen
Faculty Publications
Program managers are advocates by necessity, When taken to the extreme, program advocacy can result in the suppression of adverse information about the status of a program gram. Such was the case in the Navy's A-12 Program. In A-12 Administrative inquiry, Beach (1990) speculates that such abiding cultural problems were not unique to the Navy. To test that assertion, this paper examines cost overrun data on 64 completed acquisition contracts extracted from the Defense Acquisition Executive Summary database. Cost overruns at various contract completion points are compared with projected final cost overruns estimated by contractor and government personnel. 17 comparison …
Max And Ralph: Unruly Children Of Limited-Form Requirements Contracts, David E. Boelzner
Max And Ralph: Unruly Children Of Limited-Form Requirements Contracts, David E. Boelzner
Faculty Publications
No abstract provided.
Contingency Contracting In The Low-Intensity Conflict Environment, Steve Bell
Contingency Contracting In The Low-Intensity Conflict Environment, Steve Bell
Faculty Publications
The United States military presence in Central and South America is under attack, both literally and politically, as bombings and sniper fire directed against U.S. military personnel characterize the low-intensity conflict (LIC) environment in certain parts of Latin America. The process of contracting support for U.S. forces in a LIC environment is oriented toward sustaining operations in the field, as opposed to contracting for mobilization or surge production. A significant characteristic of this field support is that a contracting officer (KO) deploys overseas with the supported military unit. Some of the unique concerns faced by a KO deploying with an …