Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Advanced Air Mobility (1)
- Advanced Air Mobility (AAM) (1)
- Aeronautical Engineering (1)
- Aerospace Technology. Public Acceptance (1)
- Communication Challenges (1)
-
- Concept of Operations (1)
- Cybersecurity (1)
- Dark Space Theory (1)
- Drone Airway Development (1)
- Drone Integration (1)
- Educational Aeronautics (1)
- Electric Vertical Takeoff and Landing (eVTOL) Systems (1)
- Interdisciplinary Collaboration (1)
- Legal Framework (1)
- Navigation Systems (1)
- Payload Capacities (1)
- Public Interest (1)
- Regulatory Hurdles (1)
- Research Initiative (1)
- Risk-Based System (1)
- Safety Protocols (1)
- Strategic Planning (1)
- Traffic Deconfliction (1)
- Urban Air Mobility (UAM) (1)
- Vehicle Design (1)
- Weather Dynamics (1)
Articles 1 - 2 of 2
Full-Text Articles in Risk Analysis
Going Airborne: Kent State's Pioneering Leap Into Integrated Advanced Air Mobility, Jason T. Lorenzon
Going Airborne: Kent State's Pioneering Leap Into Integrated Advanced Air Mobility, Jason T. Lorenzon
National Training Aircraft Symposium (NTAS)
This proposal centers on the development of a Concept of Operations in Advanced Air Mobility (AAM). Kent State University's College of Aeronautics and Engineering is poised to pioneer the integration of drones and electric Vertical Takeoff and Landing (eVTOL) systems, bridging the gap between its campus and airport by transporting students and faculty the 3NM distance from campus to the airport and back by a UAV. Beyond a standard research initiative, this proposal signifies a groundbreaking effort to reshape the landscape of educational aeronautics and Advanced Air Mobility and Urban Air Mobility. Our overarching goal is to transcend conventional boundaries …
Latex Modified Concrete - Very Early Strength, Bobby Steele
Latex Modified Concrete - Very Early Strength, Bobby Steele
Purdue Road School
INDOT came out with specifications for a very early strength concrete to use on bridge deck overlays. This concrete is fast setting, which allows overlays to be performed over a weekend and benefits the traveling public with a short duration of traffic interference. Cure time to reach the strength requirement is 3 hours. E&B Paving performed the first application with the new spec on August 26, 2018. Many changes were also made to the INDOT Specification Section 722.