Open Access. Powered by Scholars. Published by Universities.®

Other Operations Research, Systems Engineering and Industrial Engineering

Institution
Keyword
Publication Year
Publication
Publication Type

Articles 121 - 150 of 212

Full-Text Articles in Industrial Engineering

Towards Operations Excellence: Optimising Staff Scheduling For New Emergency Department, Amr Arisha, Waleed Abo Hamad Jun 2013

Towards Operations Excellence: Optimising Staff Scheduling For New Emergency Department, Amr Arisha, Waleed Abo Hamad

Conference papers

This paper presents a case study of an Emergency Department of a public hospital in Dublin, and uses an integrated approach to determine optimal staffing levels to meet the challenges of its dynamic patient demand levels. A comprehensive stochastic model is developed to incorporate patients care pathways and the resources required along their treatment journeys. Analytical Hierarchical Process is utilised to enable decision makers to set their preferences for the facility’s strategic objectives. Evolutionary algorithms are applied to optimise staff schedules. The resulted optimized schedules maintains continuity of care delivery for patients while ensuring a balanced equilibrium among available staff.


Polyparking, Christopher Blackmer, Michael Suttie Mar 2013

Polyparking, Christopher Blackmer, Michael Suttie

Biomedical Engineering

The purpose of this senior project is to analyze the various options for the implementation of a parking lot information system on the California Polytechnic State University, San Luis Obispo campus. This system would involve three main components: physical counting hardware, a database and analysis organization system, and a user interface for disseminating the gathered information. The project investigates and provides commentary on various available and commonplace systems, and the benefits and drawbacks of these systems. During the course of the project, a flexible database and user-interface was developed in Microsoft Access, which will allow counter output to be gathered …


An Augmented Interaction Strategy For Designing Human-Machine Interfaces For Hydraulic Excavators, Joseph Akyeampong Jan 2013

An Augmented Interaction Strategy For Designing Human-Machine Interfaces For Hydraulic Excavators, Joseph Akyeampong

Dissertations

Lack of adequate information feedback and work visibility, and fatigue due to repetition have been identified as the major usability gaps in the human-machine interface (HMI) design of modern hydraulic excavators that subject operators to undue mental and physical workload, resulting in poor performance. To address these gaps, this work proposed an innovative interaction strategy, termed “augmented interaction”, for enhancing the usability of the hydraulic excavator. Augmented interaction involves the embodiment of heads-up display and coordinated control schemes into an efficient, effective and safe HMI. Augmented interaction was demonstrated using a framework consisting of three phases: Design, Implementation/Visualization, and Evaluation …


Using Modelling And Simulation To Improve Elderly Care In Ireland: A Case Study, Mohamed Ragab, Wael Rashwan, Waleed Abo-Hamad, Amr Arisha Jan 2013

Using Modelling And Simulation To Improve Elderly Care In Ireland: A Case Study, Mohamed Ragab, Wael Rashwan, Waleed Abo-Hamad, Amr Arisha

Articles

Health care services both globally and domestically - are encountering critical issues due to the increasing demand for services at the time of economic recession. Hospital performance is subject to many constraints, and planning is made more difficult by the complexity and uncertainty of demand. Population ageing is creating immense pressures on healthcare facilities across the world, leaving them struggling to cope with the growing demand for elderly healthcare services. Current demand-supply gaps result in prolonged waiting times for patients and substantial cost burdens for healthcare systems due to delayed discharges. This paper reports on a project that uses modelling …


Rfid For Inventory Of Medical Records, Johny Wu Jun 2012

Rfid For Inventory Of Medical Records, Johny Wu

Biomedical Engineering

The purpose of this project is to explore the feasibility and economic viability of the implementation of a radio frequency identification (RFID) system in a large-scale, medical office setting. Practitioners in fields such as; medicine, chiropractic, dentistry, nursing, pharmacy, allied health, and other care providers do not have a sufficient method for tracking filing forms. RFID has the potential to reduce wait time, improve checking-in time, and decrease the possibility of interchanging documents between patients.

The purpose of this RFID system is to improve upon the filing system already in place in any office setting. The major consideration behind this …


Development And Validation Of A Model For Granular Material Volume Measurements, Pourya Fasounaki Jun 2012

Development And Validation Of A Model For Granular Material Volume Measurements, Pourya Fasounaki

Department of Industrial and Management Systems Engineering: Dissertations, Theses, and Student Research

Keeping inventory record of packed grains in silos poses challenges since the bulk material’s different segments do not discharge uniformly, leading to formation of random peaks and valleys on the surface. To facilitate obtaining accurate volume measurement of the grains by taking into account this non-linear behavior on the surface, laser or plumb-bob level-sensing devices are employed at different part of the surface to probe the level of material under those regions.

The main goals of this research is to study the behavior of granular material in silo while discharging downward and by doing so, differentiate certain flow patterns formed …


A Study Of Queuing Theory In Low To High Rework Environments With Process Availability, Adam J. Brown Jan 2012

A Study Of Queuing Theory In Low To High Rework Environments With Process Availability, Adam J. Brown

Theses and Dissertations--Manufacturing Systems Engineering

In manufacturing systems subject to machine and operator resource constraints the effects of rework can be profound. High levels of rework burden the resources unnecessarily and as the utilization of these resources increases the expected queuing time of work in process increases exponentially. Queuing models can help managers to understand and control the effects of rework, but often this tool is overlooked in part because of concerns over accuracy in complex environments and/or the need for limiting assumptions. One aim of this work is to increase understanding of system variables on the accuracy of simple queuing models. A queuing model …


A Microsimulation Of Traffic, Parking, And Emissions At California Polytechnic State University – San Luis Obispo, Steven Michael Kilbert Feb 2011

A Microsimulation Of Traffic, Parking, And Emissions At California Polytechnic State University – San Luis Obispo, Steven Michael Kilbert

Master's Theses

Traffic and parking congestion are significant issues at many universities nationwide. The delays experienced result in wasted time, money, and fuel for students, faculty and staff, not to mention the negative contributions to the environment. This paper quantifies the amount of vehicle emissions generated during an average morning peak hour in the university environment. Using VISSIM and CMEM microsimulation packages, a model is created for California Polytechnic State University- San Luis Obispo to aggregate the collective transportation behaviors and practices of the campus and recognize the implications these behaviors pose on the transportation network as a whole. Reasonable estimates are …


The Effects Of Anti-Price Gouging Legislation On Supply Chain Dynamics, Jason Edward Maynard Jan 2011

The Effects Of Anti-Price Gouging Legislation On Supply Chain Dynamics, Jason Edward Maynard

Master's Theses

The purpose of this thesis is to model the effects of anti-price gouging (APG) legislation on the costs to businesses during the recovery period of a disaster. A system dynamics model of a business’s replenishment procedures is used to simulate the effects of APG legislation on business performance. Economists have published expansive research on the effects of price ceilings on supply and demand, but there is little research evidence on the operational consequences of price ceiling legislation on business costs. APG legislation increases consumer’s forward buying and shortage gaming after a disaster by removing price incentives to be frugal. Forward …


Pull Production System Training Guide, Adem Bilgutay Dec 2010

Pull Production System Training Guide, Adem Bilgutay

Industrial and Manufacturing Engineering

This book is a series of lessons designed to train operators and managers in pull manufacturing. It begins with a description of the different forms of waste that a system can help to identify and eliminate. The second section details the kanban as a system for controlling flow and as a powerful tool for identifying problems. It will describe the many different variations of kanban that exist to control flow in different production environments and the calculations that allow them to be used effectively. The final section will detail the activities that an operator should engage in when there is …


Expansion In Existing And Future Franchises, Shane Hart, Daniel Jeng Dec 2010

Expansion In Existing And Future Franchises, Shane Hart, Daniel Jeng

Industrial and Manufacturing Engineering

Zensho Group has recently acquired the restaurant US based chains CoCo’s and Carrows but has not been able to affirm the same growth as the company has established in its home country of Japan. In order to fulfill their need to grow, extensive market analysis and research needs to be done. An expansion eastward and the introduction of their flagship restaurant chain, Sukiya, would offer growth potential. Determining the best locations for these new stores is the goal of this project. Low cost and high market penetration potential will be used to recommend the ideal locations that will benefit the …


Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge Jun 2010

Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge

Industrial and Manufacturing Engineering

Lean inventory management is influential for business. One of the wastes businesses aim to reduce, using lean principles, is inventory. Inventory management provides the essential tools for eliminating extra inventory and cost that is tied up in capital.

Boeing’s Ground Based Missile Defense inventory area was failing at meeting their proprietary lean manufacturing goals. There was a need for an inventory system that included: lean principles, inventory management and user-friendly capability. The goal of this project’s inventory management database process was to minimize inventory investment while still meeting functional requirements. The deliverables for this project met the needs of Boeing’s …


Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji Jun 2010

Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji

Industrial and Manufacturing Engineering

The following senior project was first introduced during a summer internship at a biomedical company called Asthmatx Inc. Asthmatx is responsible for the development and manufacturing of a catheter‐based device for moderate to severe cases of asthma. Upon the approval of FDA, Asthmatx had planned to ramp up their production capacity significantly in order to accommodate the potential growth.

The first step in the process improvement was a facility reconfiguration that involved the adjustment of process sequencing and the implementation of ergonomic catheter channels. Next, time studies were conducted to gain more accurate time standards of the production process. After …


Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz Jun 2010

Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz

Industrial and Manufacturing Engineering

This report proposes and analyzes process improvement methods for the Surgical Services Department at Sierra Vista Regional Medical Center. The department currently operates with an average of 25% of elective cases starting on time. This can be attributed to a number of inefficiencies that occur throughout the hospital.

The following Industrial Engineering methods were utilized to improve patient flow:  creation of a data collection system to quantify delays  use of simulation and facility redesign techniques to determine feasibility and benefits of moving towards a surgical center model  development of a user interfaced database to record and analyze …


Police Operations Simulation, Robert Mcgee Jun 2010

Police Operations Simulation, Robert Mcgee

Industrial and Manufacturing Engineering

In this report, the author explains the process of creating the Police Operations Simulation, shows step-by-step how it works, and statistically analyzes the results from SLOPD’s own proposed and current schedules. The data-gathering from the department and the simulation itself will receive the bulk of the coverage in this report, followed by sample results from SLOPD and a business plan for future sale to other departments.

Using the given numbers, it appears that the proposed schedule will result in significantly improved coverage for the city of San Luis Obispo. While any increase in the number officers on patrol tends to …


Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu Jun 2010

Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu

Industrial and Manufacturing Engineering

Alcon’s Laser Clean Room fosters inefficient production practices, is outdated for its current process, and lacking in clear process/product flow. A facility re-design is applied to bring order, efficiency, and optimize flow in the laser production lines.

Deliverables include a new layout that decreases product travel distances and increases productivity as well as an implementation plan and cost/savings analysis. Major design decisions include downsizing the clean room, sorting to find waste and establishing clear process/product flows. The design was implemented within three weeks and results yield 29% reduction of product travel distance, 10.4 hrs/day saved from eliminated gowning time and …


Cable Time Estimation Database, Joshua L. Okerman Jun 2010

Cable Time Estimation Database, Joshua L. Okerman

Industrial and Manufacturing Engineering

The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.


Preference Driven University Course Scheduling System, Heather A. Bellardo Jun 2010

Preference Driven University Course Scheduling System, Heather A. Bellardo

Master's Theses

University course planning and scheduling is the process of determining what courses to offer, how many sections are needed, determining the best term to offer each section, assigning a faculty member to instruct each section, and scheduling each section to a timeslot to avoid conflicts. The result of this task has an impact on every student and faculty member in the department. The process is typically broken down into three major phases: course offering planning, faculty assignment to planned course sections, and course scheduling into timeslots.

This thesis looks at each of these phases for the Industrial and Manufacturing department …


Axle Assembly Takt Time Change, Punit Shivji Mar 2010

Axle Assembly Takt Time Change, Punit Shivji

Industrial and Manufacturing Engineering

The Toyota managed New United Motor Manufacturing Inc. automotive plant is currently going through difficult economic times. To prepare for future production demands, the plant will need to decrease production output and maintain a lower volume of vehicles produced with a high level of quality and efficiency. This project will take on the reorganization of the rear axle assembly lines and the departments that are involved to ensure a cost effective, efficient, and safe approach in manufacturing Toyota's Tacomas. Toyota recommends the Toyota production system as well as any knowledge and experience obtained from previous jobs and coursework to be …


Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston Jan 2010

Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston

Industrial and Manufacturing Engineering

No abstract provided.


Funeral Services Marketing Interface To Enhance Customer Service And Overall Productivity, Alyssa R. Habing Jan 2010

Funeral Services Marketing Interface To Enhance Customer Service And Overall Productivity, Alyssa R. Habing

Industrial and Manufacturing Engineering

Customer satisfaction is the ultimate goal of any business regardless of the industry it resides in; it’s the sole driver of a company’s productivity levels and overall success within the market. Although numb to most market fluctuations, the funeral industry needs to reinvent their business strategies continuously in order to increase their market share. It’s especially important for smaller funeral homes across the world to take this idea to another level in order to stay competitive with the larger, corporate establishments. In the past twenty years, the industry has grown exponentially due to more interest and popularity. The increase in …


Energy Audit And Optimization For "Arches Etc.", James Ross Dixon Jan 2010

Energy Audit And Optimization For "Arches Etc.", James Ross Dixon

Industrial and Manufacturing Engineering

Arches etc. is a San Diego business, which specializes in the manufacture, distribution, and installation of custom designed doors, windows, mouldings, and hardware. Due to the recent economic downturn, which has hindered the construction industry, Arches etc. believed that an analysis and optimization of their energy usage would provide additional assistance towards their goal to lower overhead and maintain current operations.

To begin this task, a comprehensive energy audit was conducted to establish an initial state from which to base improvements. Arches etc.’s current monthly utility bill averages $996, which solidifies the accuracy of this project’s performed energy audit, estimating …


Recycling Made Easy: An Ergonomic Approach To Home Recycling And Trash Containers, Landon P. Boisclair Jan 2010

Recycling Made Easy: An Ergonomic Approach To Home Recycling And Trash Containers, Landon P. Boisclair

Industrial and Manufacturing Engineering

The purpose of this project is to create an ergonomically sound recycling/trash container, with the ultimate hope of making the recycling process easier and more intuitive, thereby increasing recycling rates. Currently, while there are many recycling/trash containers available for purchase, there is no product that has a design without glaring ergonomic flaws. An ergonomic design and product prototype was created as a part of this project, and was subsequently tested against a conventional prototype model. The data collected from the experiments conducted suggests that the new ergonomic model makes the waste disposal process and the container transportation process easier, while …


Nonprofit Management Through Effective Database Utilization, Jennifer Muscat Jan 2010

Nonprofit Management Through Effective Database Utilization, Jennifer Muscat

Industrial and Manufacturing Engineering

This project addresses problems found within a specific department within Lifewater International. Lifewater faces many unique challenges operating as a nonprofit. Like most nonprofits, elaborate costly solutions are simply not an option when solving department problems. This project addresses three interrelated problems within Lifewater’s Development and Communications Department. The three issues addressed are Volunteer Management, Donor Management, and Project Management. Each problem was examined to determine the areas for improvement that this project can handle and solve. Each problem was given an improved design. A Volunteer Management System was designed to increase volunteer utilization and appropriately match volunteers with appropriate …


Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel Jan 2010

Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel

Industrial and Manufacturing Engineering

The receiving warehouse at Diablo Canyon Power Plant, owned by Pacific Gas and Electric, serves as a place to recognize the receiving of items into an ERP system, repackage and label items for long-term storage, and organize items for delivery inside the secured area. The warehouse managers would like to redesign the layout and procedures of the warehouse. Currently items are not received, scanned, or shipped in a timely manner. The flow of people and items in the receiving and shipping area is chaotic and space is limited especially during plant outages. The objective of this project is to: • …


Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer Jan 2010

Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer

Industrial and Manufacturing Engineering

This report details a facilities design for Ernie Ball’s guitar and bass guitar manufacturing facility in San Luis Obispo, CA. Specifically, this project will redesign the layout for the Woodshop, the largest of the 5 manufacturing cells in the facility. This project was completed using the Systematic Layout Planning procedure and focused mostly on phase II and III in which the specifics for a layout are determined, however, space requirements were not evaluated as it was not within scope.

The first step was to develop departments in the facilities; two master departments were identified for the neck manufacturing process and …


Non-Profit Management System For Friends Of The Elephant Seal, Matthew Justus, Robert Macasi, Jeff Zinn Jan 2010

Non-Profit Management System For Friends Of The Elephant Seal, Matthew Justus, Robert Macasi, Jeff Zinn

Industrial and Manufacturing Engineering

Friends of the Elephant Seal (FES) are a non-profit organization based in San Simeon, California. Their current method of tracking and reporting information is inefficient. A project was proposed to develop a new information management system for FES, install it at their office and provide training including a user manual. The project was divided into three parts: Database Design and Implementation; User Interface Design and Ergonomics; and User Manual & Help System.

The objective of the project was to design a user-friendly interface specifically for the FES worker that allowed for easy access to data entry functions, reporting functions and …


Alleviation Of Spindle Transfer, Blake Ochs, Whitney Bone Jan 2010

Alleviation Of Spindle Transfer, Blake Ochs, Whitney Bone

Industrial and Manufacturing Engineering

Haas Automation, Inc. is one of the largest CNC machine tool builders in the world. They produce an assortment of machines that come in many different sizes, however, all machines have in common the central tool that allows them to perform their surfacing and bore functions, the spindle. As with the machines themselves, the spindles can also range in size depending on the type of machine they are going into. These spindles are assembled step by step and as components are added to them, several models become so heavy that it is not feasible to have operators lift them by …


Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head Jan 2010

Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head

Industrial and Manufacturing Engineering

The purpose of this project was to validate industrial designs for a product in its conceptual stage and suggest/implement design changes that suit the contracting company’s needs while assuring the product maintains its basic functional requirements. Techniques and methods used to validate the design include 3‐D solid modeling, physical product application using rapid prototyping to produce the product. Methods of design for manufacturing were analyzed in the design. Processes used in the validation and verification of the design include solid modeling design, methods of measurements, fixture design and manufacturing processes. Full design specifications and solid model files were finalized and …


Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti Jan 2010

Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti

Industrial and Manufacturing Engineering

The Heybeli Digester project originated with Sema Alptekin in her personal research and was incorporated into a Senior Project opportunity at California Polytechnic State University, San Luis Obispo. The aim of this project was to select and design a plan for the use of a digester for the island of Heybeli, Turkey. The objective of this plan was to incorporate economic, social, and environmental justifications to evaluate if a digester would be a benefit to the community.

Systems Engineering analysis is a vital tool when working with complicated projects that include multiple systems interfacing with one another. Through the use …