Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Business

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1261 - 1290 of 1293

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Interstate Gas Pipeline Ratemaking And Contract Implications, Henry E. Brown Mar 1983

Interstate Gas Pipeline Ratemaking And Contract Implications, Henry E. Brown

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

61 pages.

Contains references.

Contains 7 attachments.


Creditors’ Rights Involved In The Production And Sale Of Natural Gas, William M. Schultz Mar 1983

Creditors’ Rights Involved In The Production And Sale Of Natural Gas, William M. Schultz

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

101 pages (includes forms).

Contains 6 attachments.


Section 311 And 312 Of The Natural Gas Policy Act Of 1978 And Hinshaw Pipelines, Lauren Eaton Mar 1983

Section 311 And 312 Of The Natural Gas Policy Act Of 1978 And Hinshaw Pipelines, Lauren Eaton

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

5 pages.


Drafting And Interpreting Sensitive Gas Purchase Contract Provisions, William D. Watson Mar 1983

Drafting And Interpreting Sensitive Gas Purchase Contract Provisions, William D. Watson

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

8 pages.


Off-System Sales: Will They Ever Return?, Paul F. O'Konski Mar 1983

Off-System Sales: Will They Ever Return?, Paul F. O'Konski

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

5 pages.


Off-System Sales – Will They Ever Return? (The Interstate Side), Robert C. Mchugh Mar 1983

Off-System Sales – Will They Ever Return? (The Interstate Side), Robert C. Mchugh

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

27 pages (includes illustrations).

Contains 2 pages of references.

Contains 1 attachment.


The Natural Gas Industry In Transition, Ruth A. Maurer Mar 1983

The Natural Gas Industry In Transition, Ruth A. Maurer

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

10 pages (includes illustrations).


Legislative Prospects For Wellhead Pricing Of Natural Gas, Richard G. Morgan Mar 1983

Legislative Prospects For Wellhead Pricing Of Natural Gas, Richard G. Morgan

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

162 pages.

Contains 16 attachments.


Contractual And Other Considerations Affecting Producers, Pipelines And Distributors During Current Period Of Market Demand Constraints [Outline], Michael J. Manning Mar 1983

Contractual And Other Considerations Affecting Producers, Pipelines And Distributors During Current Period Of Market Demand Constraints [Outline], Michael J. Manning

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

6 pages.


Agenda: Natural Gas Symposium: Contract Solutions For The Future Of Regulatory Environment, University Of Colorado Boulder. Natural Resources Law Center, University Of Houston. Law Center Mar 1983

Agenda: Natural Gas Symposium: Contract Solutions For The Future Of Regulatory Environment, University Of Colorado Boulder. Natural Resources Law Center, University Of Houston. Law Center

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

Contents:

The natural gas industry in transition / Ruth A. Maurer -- Legislative prospects for wellhead pricing of natural gas / Richard G. Morgan -- Off-system sales : will they ever return? : the interstate side / Robert C. McHugh -- Off-system sales : will they ever return? / Paul F. O'Konski -- Contractual and other considerations affecting producers, pipelines and distributors during current period of market demand constraints / Michael J. Manning -- Section 311 and 312 of the Natural Gas Policy Act of 1978 and Hinshaw pipelines / Lauren Eaton -- Drafting and interpreting sensitive gas purchase contract …


Control Of Construction Costs During Construction, David H. Foo May 1981

Control Of Construction Costs During Construction, David H. Foo

Theses

The construction of a major project requires a vast amount of time, money, material and human resources. Proper coordination of these elements into an array of activities is crutial to the success of the project if it is to be built on time and within budget. As technology advances, the complexity of the project increases the resources to build them remain finite, and therefore, the project manager must seek methods to improve control on the construction project.

This thesis provides an overall view of the relatively new and rapidly expanding field of cost engineering. Cost engineering may be defined as …


The Relationship Between Management Training And Other Predictor Variables And Managerial Performance Among Selected Industrial First-Line Supervisors, Joseph Thomas Martelli Jan 1981

The Relationship Between Management Training And Other Predictor Variables And Managerial Performance Among Selected Industrial First-Line Supervisors, Joseph Thomas Martelli

Dissertations and Theses @ UNI

The purpose of this study was to determine whether a relationship exists between industrial first-line supervisors' participation in management training programs and subsequent job related performance as assessed by the subjects' overall management by objectives (MBO) performance appraisal rating .

Also, the relationship between managerial performance and predictor variables (age, years of supervisory experience, formal education level, self development, prior management training, and professional society involvement) was assessed.

Twenty-three first-line supervisors from a medium sized manufacturing organization participated in the study. A questionnaire was designed which extracted measures on the predictor variables from the subjects. Corporate management supplied the measure …


Management Of Manpower Planning In A Job Shop, John E. Yadlon May 1978

Management Of Manpower Planning In A Job Shop, John E. Yadlon

Theses

The object of any system of manpower planning is to provide a means to optimize manpower utilization. Within this base there is the normal requirement to provide effective utilization of equipment, materials and manpower. In a production type of environment, studies, statistics, research and supervisory manpower are readily available to best optimize manpower planning. In a job shop environment only fragments of these elements are available. Also, the available supervisory time for studies and implementation of research into statistics is usually very small. The net result is that manpower management in a job shop is all too often guessed at. …


The Introduction Of A Computerized Production Control System In A Small Manufacturing Company, Harry Leroy Zimmerly May 1978

The Introduction Of A Computerized Production Control System In A Small Manufacturing Company, Harry Leroy Zimmerly

Theses

The purpose of this thesis is to acquaint the reader with the intricacies of introducing a computerized production control system into a small manufacturing company. To do this a hypothetical company was described as it existed with a manual production control system. The information flow of the manual system was described in detail.

Potential computerized production control systems with a shop data collection system were then investigated. A computerized system would expedite information flow, allow rapid assembly tracking, take accurate data and reveal the actual cost (including labor cost) of an assembly. This was done first by examining technical publications. …


An Approach To Energy Conservation In A Manufacturing Industry, William Polignano May 1977

An Approach To Energy Conservation In A Manufacturing Industry, William Polignano

Theses

The approach attacks the problem of control and planning of energy usage via three major categories. These areas are: detection, forecasting and reporting of energy usage.

To initiate any energy program the first step, is the identification of the areas that use the most energy, thus allowing detailed studies to be concentrated in these energy-intensive areas. The author has attempted to show which areas are energy-intensive in his employer's plants.

The second step is the accurate forecasting of energy usage. The author has attempted this via an econometric forecasting model that accurately predicts energy usage based on direct labor hours …


Ecuador And A Business Opportunity, Cesar Arturo Paredes Roldan May 1977

Ecuador And A Business Opportunity, Cesar Arturo Paredes Roldan

Theses

As a result of its recent status as a petroleum exporting country, Ecuador is enjoying an economic boom, which is expected to lead to the formation of new enterprises, the creation of jobs, the utilization of human and natural resources and the encouragement of harmonious development of the national economy.

This thesis is based on the belief that the private sector must assume a decisive role in the adequate implementation of Ecuador's industrial development programs, and it aims to show the feasibility of establishing there an enterprise that would manufacture domestic electric irons.

The coverage of the subject comprises three …


Non-Standard Workweek Scheduling Technique Selection, John Alexander Oak May 1976

Non-Standard Workweek Scheduling Technique Selection, John Alexander Oak

Theses

This thesis presents a description of non-standard work scheduling techniques and a comparison method which enables decision-makers to differentiate between available work-scheduling alternatives with the purpose in mind of selecting the most appropriate and suitable arrangement. The method developed calls for the decision-maker to follow a five-step sequential process to obtain final results. The ingredients necessary to achieve such final results are obtained in a manner similar to that demanded by decision-making-under-uncertainty conditions commonly followed in actual industrial settings.

Since the primary objective of business management is the achievement of a profit through the manipulation of available resources, initial sections …


Design For A Developing Consortium, Henry A. Mauermeyer May 1974

Design For A Developing Consortium, Henry A. Mauermeyer

Theses

The number of consortia in American higher education expanded rapidly from only ten in 1960 to eighty in 1973. Many do not have an organized method of developing interinstitutional cooperation, structuring their internal management, or preparing to meet future expansion.

The design of an organizational process appropriate to consortia in general has been developed in this thesis. The design is based on an analysis of various materials: (1) literature on the consortium movement; (2) data gathered from a nationwide survey conducted by the author; (3) visits with directors of consortia and experts in the consortium field; (4) actual working experience …


The Design And Implementation Of A Time-Shared Computer Based Construction Cost Estimating System For An Electric Utility, Thomas Arnold Westphal May 1974

The Design And Implementation Of A Time-Shared Computer Based Construction Cost Estimating System For An Electric Utility, Thomas Arnold Westphal

Theses

The work of the distribution department of an elec tric utility involves a great deal of medium to heavy construction. This work is vital to serve the energy needs of the public. An electric utility constantly builds, reinforces, and repairs electric distribution facilities. The material and labor used to accomplish this construction is expensive. Money in sufficient amounts is seldom, if ever, available to finance all proposed construction projects. Therefore, the cost of proposed projects must be estimated in advance, so that management may decide on an economic basis which projects will be authorized.

The need for accurate construction cost …


Effectiveness Of Training Programs For Graduate Engineers, V.C. Rajashekar May 1972

Effectiveness Of Training Programs For Graduate Engineers, V.C. Rajashekar

Theses

This thesis represents an investigation of effectiveness as a result of engineering training. The basic elements of effectiveness and its learning process are explained and said that the effectiveness could be learnt and improved.

The term training, is basically the process of education and training. But training cannot be performed as an individual, but is performed as a group. Therefore training a group with having so many individuals needs careful consideration in designing a training program.

In order to get the broadest possible picture of current thinking and current activity in the area of company training programs for graduate engineers, …


How Many Acres Per Hour?, J G. Drever Jan 1970

How Many Acres Per Hour?, J G. Drever

Journal of the Department of Agriculture, Western Australia, Series 4

MANY farm tractor operators don't know exactly how much land is covered in an hour by implements drawn by their tractors. This information, useful on any farm where tractors are used, is of particular value in contract work.

The capacity of the machine or implement, or in other words, its rate of working, depends on the width of the machine, how fast it travels, how efficiently it is operated and the time it works.


Financing The Nuclear Fuel Requirements Of Public Utilities, Peter A. Lewis May 1969

Financing The Nuclear Fuel Requirements Of Public Utilities, Peter A. Lewis

Theses

A major portion of new electric generating capacity will be nuclear powered. The change to nuclear power will require large outlays of capital not required with conventional fuels to finance nuclear fuel inventories. Nuclear fuel financing requirements are unique because nuclear fuel is not consumed in the same manner as conventional fuels. Financing has not been a problem to date because nuclear fuel can be obtained only through lease from the Atomic Energy Commission. This arrangement will be terminated by June 30, 1973 and from that date on all nuclear fuel must be privately owned. Electric utilities have shown an …


Reliability Considerations For Communication Satellites, Frank Polizzi May 1968

Reliability Considerations For Communication Satellites, Frank Polizzi

Theses

A detailed program covering all phases of reliability for a communication satellite was presented. In long mission programs such as this one, reliability is the prime consideration in assuring a successful accomplishment of the stringent goals set forth. Reliability principles and methods were incorporated in delineating each major task in the program. These principles and methods not only aided the reliability personnel in performing their duties better, but also assisted the design group, manufacturing personnel, and the testing and evaluation group in performing their jobs efficiently by being aware and knowledgeable of reliability engineering.

Various reliability disciplines were imposed, as …


Planning And Scheduling Software Programs With Pert, Henry E. Mielo May 1965

Planning And Scheduling Software Programs With Pert, Henry E. Mielo

Theses

The use of the Program Evaluation and Review Technique (PERT) in planning and scheduling software programs was discussed in this thesis. A real world program, referred to as the Wrap-Around Simulation or WAS Project, was selected to illustrate that complex efforts in the software domain can respond favorably to modern planning and scheduling techniques

The WAS Project included the provision of a digital simulation of the shipboard environment in which a Digital Fire Control Computer (DFCC) would operate as part of a Digital Fire Control System. The digital simulation afforded a well controlled and conclusive checkout of the operational program …


Program Evaluation And Review Technique, Anthony Immaculate Agresta Jun 1962

Program Evaluation And Review Technique, Anthony Immaculate Agresta

Theses

The problem of planning, controling and evaluating complex projects both engineering and non-engineering has existed as long as the projects themselves. In the past the approach of management to this problem has been one which was based heavily on the use of historical information. There have been very few attempts to predict and control the occurrence of the objective event of these projects.

This thesis deals with a review of this problem and a new approach to the planning, control, and evaluation of these complex projects. This new approach is the Program Evaluation and Review Technique (PERT) which was developed …


Jurisdictional Disputes Within The Construction Industry, Dominick Joseph Magarelli May 1962

Jurisdictional Disputes Within The Construction Industry, Dominick Joseph Magarelli

Theses

Work assignment disputes, known as jurisdictional disputes are common in the construction industry. They are not only costly but annoying as well, The construction industry has always been plagued with this type of dispute because each of its many craft unions regards certain types of work as a proprietary right. They jealously guard against any encroachment of their area of activity by other unions. Sometimes lines of demarcation between the various jurisdictions are not clear. Also, the development of new products and methods often brings with it clashes between unions each of whom claim exclusive right to the work assignment. …


Hold On To Your Egg Profits, J A. Hoy Jan 1960

Hold On To Your Egg Profits, J A. Hoy

Journal of the Department of Agriculture, Western Australia, Series 4

IN recent years, much sound advice has been made available to poultry farmers to assist them in developing their properties and operating them on profitable lines.

Much of this advice has been utilised to good advantage, but there are still many properties on which the profits are being reduced by feed wastage, damage by rats and mice, lack of sufficient attention to egg quality, unnecessarily high labour costs and failure to keep farm records.


A Study Of A Production Control System In A Job Order Die Casting Plant, Robert Gordon Woodnorth May 1958

A Study Of A Production Control System In A Job Order Die Casting Plant, Robert Gordon Woodnorth

Theses

This thesis examines the production planning and control system in a job-order die casting plant. After comparing to the criteria for an ideal system the following changes were recommended.

1. Central work storage and dispatching. This would reduce work in process and workload fluctuations through closer planning. It would also provide a perpetual inventory system and a central control point which would be constantly informed of production progress.

2. Operator trucking. By having operators do their own trucking material handling costs and production delays would be reduced.

3. Simplified job cost accounting. The use of standard costs for finishing and …


An Analysis Of Predetermined Time Systems, Richard Otto Schmid May 1957

An Analysis Of Predetermined Time Systems, Richard Otto Schmid

Theses

This paper endeavors to compare three predetermined time systems, namely; Work-Factor, Methods-Time Measurement and Basic Motion Time-study, elemental-by-elemental, through the use of a series of detailed analyses. The following information in the form of conclusions and recommendations has been set forth from the investigation of the various comparative analyses contained herein:

  1. Reasons for the variation between the elementals.

  2. A chronological order of attack for further study with an eye to accomplishing the most in the shortest possible time.

  3. The results of a composite analysis which utilizes the most realistic elemental definitions of the three systems. (This includes the comparison of …


The Control Of Industrial Sales Operations, Herbert Gieser May 1957

The Control Of Industrial Sales Operations, Herbert Gieser

Theses

With selling becoming so competitive in the past quarter century, managerial control over the sales organization is necessary for survivals Essentially, controls cover the regulation and administration of territories, expenses, and the measurement of performance.

The purpose of this thesis is to investigate the various phases of controls, the many plans which can be applied, and the advantages and disadvantages of these plans. Emphasis is placed on the case studies of some of the many firms which have put these control programs to work successfully.

This thesis is intended for management executives, sales managers, and sales staff executives in equipping …