Open Access. Powered by Scholars. Published by Universities.®
- Keyword
Articles 1 - 2 of 2
Full-Text Articles in Manufacturing
Built-In Bicycle Rack For Cars, Scott A. Hansberry
Built-In Bicycle Rack For Cars, Scott A. Hansberry
All Undergraduate Projects
Transporting a bicycle after riding somewhere and then needing to be pickup can be problematic. Bicycles will not fit in most vehicles without removing components. There is also the risk of damaging the inside of the vehicle. Expecting everyone to have a bike rack for their vehicle is unrealistic because the bike rack could be considered unappealing visually, take up to much space in the trunk, or limit the vehicle owner’s access to the trunk. The solution to this problem is a bike rack that mounts onto your car and then mounts your bike onto the rack. Most people don’t …
Adaptive Scheduling For Operating Room Management, Honghan Ye
Adaptive Scheduling For Operating Room Management, Honghan Ye
Theses and Dissertations--Mechanical Engineering
The perioperative process in hospitals can be modelled as a 3-stage no-wait flow shop. The utilization of OR units and the average waiting time of patients are related to makespan and total completion time, respectively. However, minimizations of makespan and total completion time are NP-hard and NP-complete. Consequently, achieving good effectiveness and efficiency is a challenge in no-wait flow shop scheduling. The average idle time (AIT) and current and future idle time (CFI) heuristics are proposed to minimize makespan and total completion time, respectively. To improve effectiveness, current idle times and future idle times are taken into consideration …