Open Access. Powered by Scholars. Published by Universities.®

Power and Energy Commons

Open Access. Powered by Scholars. Published by Universities.®

2011

Array

Articles 1 - 2 of 2

Full-Text Articles in Power and Energy

Investigation Of Wave Farm Electrical Network Configurations, Fergus Sharkey, Michael Conlon, Kevin Gaughan May 2011

Investigation Of Wave Farm Electrical Network Configurations, Fergus Sharkey, Michael Conlon, Kevin Gaughan

Conference papers

Wave Energy Converters (WECs) have been in development for a number of decades and some devices are now close to becoming a commercial reality. As such, pilot projects are being developed, particularly in the UK and Ireland, to deploy WECs on a pre-commercial array scale. There is little experience in the wave energy or utility industry of designing and installing electrical networks for WEC arrays with the closest comparison being offshore wind farms. There are some key features of WECs which will ultimately dictate thatthe electrical configuration differs from that of offshore wind farms.

This paper investigates the potential representative …


Dynamic Electrical Ratings And The Economics Of Capacity Factor For Wave Energy Converter Arrays, Fergus Sharkey, Elva Bannon, Michael Conlon, Kevin Gaughan Jan 2011

Dynamic Electrical Ratings And The Economics Of Capacity Factor For Wave Energy Converter Arrays, Fergus Sharkey, Elva Bannon, Michael Conlon, Kevin Gaughan

Conference papers

Wave Energy Converters (WECs) have been in development for several decades with some devices now coming close to commercial realities. As such, pilot projects are being developed, particularly in the UK and Ireland, to deploy WECs on a pre-commercial array scale. The ultimate ambition is to have multiple WECs installed in a ‘wave farm’ in a similar fashion to offshore wind farms. For large scale wind farms the inter-array and export electrical systems can represent more than 20% of the project’s capital expenditure. Submarine power cables account for a large proportion of this cost. The same is expected to hold …