Open Access. Powered by Scholars. Published by Universities.®

Power and Energy Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Power and Energy

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social And Economic Assessment, Edward C. Jordan, Roger Creighton Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social And Economic Assessment, Edward C. Jordan, Roger Creighton

Dickey-Lincoln School Lakes Project

The purpose of this assessment of the social and economic impact of implementing the Dickey-Lincoln School Lakes Project, therefore, is not to flatly predict impacts. Rather, the intent is to provide information and judgments which can help people recognize the potential for changes and take appropriate steps to prepare for, accommodate, and adjust to those changes. Thus we hope that this report's success will be measured by how well it provides information with which local citizens and all others involved in this project can proceed with their planning and decision-making processes.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …