Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Animal Sciences (3)
- Aquaculture and Fisheries (3)
- Architecture (3)
- Arts and Humanities (3)
- Business (3)
-
- Business Administration, Management, and Operations (3)
- History (3)
- Life Sciences (3)
- Operations Research, Systems Engineering and Industrial Engineering (3)
- Social and Behavioral Sciences (3)
- Climate (2)
- Environmental Sciences (2)
- Fresh Water Studies (2)
- Geography (2)
- Oceanography and Atmospheric Sciences and Meteorology (2)
- Public Affairs, Public Policy and Public Administration (2)
- Architectural Engineering (1)
- Construction Engineering (1)
- Cultural Resource Management and Policy Analysis (1)
- Ecology and Evolutionary Biology (1)
- Environmental Design (1)
- Environmental Indicators and Impact Assessment (1)
- Environmental Law (1)
- Forest Management (1)
- Forest Sciences (1)
Articles 1 - 5 of 5
Full-Text Articles in Power and Energy
Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated
Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated
Dickey-Lincoln School Lakes Project
This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to evaluate alternative methods of providing electrical energy in lieu of the Dickey-Lincoln School Lakes Project. It is understood that this report will ultimately become part of the "Environmental Impact Statement" for the project.
Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior
Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior
Dickey-Lincoln School Lakes Project
Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient power revenues can be obtained from the sale of power under marketing arrangements consistent with Section 5 of the Flood Control Act of 1944 to repay all costs associated with the production and distribution of the power produced.
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers
Dickey-Lincoln School Lakes Project
The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …