Open Access. Powered by Scholars. Published by Universities.®

Structural Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

2014

Department of Construction Engineering and Management: Dissertations, Theses, and Student Research

Articles 1 - 1 of 1

Full-Text Articles in Structural Engineering

Evaluating The Impact Of Bridge Deck Removal Method On The Performance Of Precast/Prestressed Concrete I-Girders, Shaddi Assad Aug 2014

Evaluating The Impact Of Bridge Deck Removal Method On The Performance Of Precast/Prestressed Concrete I-Girders, Shaddi Assad

Department of Construction Engineering and Management: Dissertations, Theses, and Student Research

Wide flange precast/prestressed concrete I-girders have been widely used by several State Departments of Transportation (DOTs) in the last two decades. These girders have many advantages over standard AASHTO I-girders. Their wide and thick bottom flange accommodates a large number of prestressing strands and their wide and thin top flange provides a shorter deck span, reduced girder weight, greater stability in construction, and adequate platform for workers. Despite these advantages, the wide and thin top flange might be disadvantageous when it comes to deck removal, as it is more susceptible to damage. Therefore there is a need to investigate the …