Articles 1 - 7 of 7

Full-Text Articles in Structural Engineering

Evaluación De La Amenaza Y Vulnerabilidad Por Crecientes Del Río Acaciítas En El Área Urbana Del Municipio De Acacías - Meta, Dario Alejandro Morales Alarcón, Juliana Pinto Santacruz Aug 2017

Evaluación De La Amenaza Y Vulnerabilidad Por Crecientes Del Río Acaciítas En El Área Urbana Del Municipio De Acacías - Meta, Dario Alejandro Morales Alarcón, Juliana Pinto Santacruz

Ingeniería Civil

El municipio de Acacias se encuentra localizado en el departamento del Meta a 26 km al sur de Villavicencio, su hidrografía está constituida por la cuenca del río Meta. Este río nace en la cordillera oriental, algunos de sus afluentes o tributarios con los que cuenta son los Ríos Acacias, Acaciítas, Orotoy, Guayuriba, Humea, Úpia, Melua, Los Caños, Camoa y Blancos entre otros además de algunas quebradas como Las Blancas, Los Pavitos, Cristales, Caney, La Panela. Durante las épocas de alta pluviosidad los habitantes del sector urbano de Acacias se han visto afectados por las crecientes principalmente del río Acaciítas …


On The Ramberg-Osgood Stress-Strain Model And Large Deformations Of Cantilever Beams, Ronald J. Giardina Jr Aug 2017

On The Ramberg-Osgood Stress-Strain Model And Large Deformations Of Cantilever Beams, Ronald J. Giardina Jr

University of New Orleans Theses and Dissertations

In this thesis the Ramberg-Osgood nonlinear model for describing the behavior of many different materials is investigated. A brief overview of the model as it is currently used in the literature is undertaken and several misunderstandings and possible pitfalls in its application is pointed out, especially as it pertains to more recent approaches to finding solutions involving the model. There is an investigation of the displacement of a cantilever beam under a combined loading consisting of a distributed load across the entire length of the beam and a point load at its end and new solutions to this problem are …


Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson Jun 2017

Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson

Architectural Engineering

The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.

The first aspect of this project …


Schedule And Cost Performance Analysis And Prediction In Louisiana Dotd, Mahmoud Hamide May 2017

Schedule And Cost Performance Analysis And Prediction In Louisiana Dotd, Mahmoud Hamide

University of New Orleans Theses and Dissertations

Many construction projects in the United States are facing the risk of cost overrun and schedule delays. This is also happening here in the State of Louisiana. When these things happen, it causes cost overrun which can then be passed on to the tax payers and may also cause the state to take on less projects than they normal. Many researchers have studied the reasons behind both the cost overrun and the delays resulting in private firms, developing project management tools and best practices to prevent this risk. In this research, I aim to study the historical trend in 2912 …


Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer May 2017

Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer

Architectural Engineering

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.


Effectiveness Of Small Strain Shear Wave Velocity As A Property For Assessing Damage Associated With Alkali-Silica Reaction In Concrete, Dillon K. Self May 2017

Effectiveness Of Small Strain Shear Wave Velocity As A Property For Assessing Damage Associated With Alkali-Silica Reaction In Concrete, Dillon K. Self

Civil Engineering Undergraduate Honors Theses

This research paper details the monitoring of expansion and shear wave velocity for fifteen concrete prisms cast in accordance with ASTM C1293 utilizing five mix designs with varying levels of ASR reactivity. Jobe sand and sodium hydroxide pellets were added in various quantities to increase the reactivity of the prisms. Strain measurements of the prisms were taken according to ASTM C129 and the shear wave velocity of the prisms was measured using ASTM C215. These measurements were taken weekly, then monthly for over a year. It was determined that shear wave velocity of the prisms decrease linearly as strain in …


Bim Assisted Design Process Automation For Pre-Engineered Buildings (Peb), Mohammad Delavar Feb 2017

Bim Assisted Design Process Automation For Pre-Engineered Buildings (Peb), Mohammad Delavar

Electronic Thesis and Dissertation Repository

The effective adoption and implementation of Building Information Modeling (BIM) is still challenging for the construction industry. However, studies and reports show a significant increase in the rate of BIM implementation and adoption in mainstream construction activities over the last five years. In contrast, Pre-Engineered Building (PEB) construction, a specialized construction system which provides a very efficient approach for construction of primarily industrial buildings, has not seen the same uptake in BIM implementation and adoption. The thesis reviews the benefits and the main applications of BIM for the PEB industry as well as challenges of its practical implementation. To facilitate …