Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering and Management

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 3331 - 3360 of 4454

Full-Text Articles in Engineering

Industrial Relations And The Construction Sector: The Implications Of Mcgowan And Ors V The Labour Court, Ruairi Hayden Jan 2014

Industrial Relations And The Construction Sector: The Implications Of Mcgowan And Ors V The Labour Court, Ruairi Hayden

Other Resources

On the 9th May 2013 the Supreme Court in McGowan and Ors v The Labour Court and Ors found Registered Employment Agreements to be incompatible with the Constitution. Registered Employment Agreements (REA) are provided for in Part III of the Industrial Relations Act 1946. Collective bargaining has traditionally been the method for employees and employers to negotiate terms of employment within the construction industry. These agreements would then be registered with the Labour Court and they would have legal effect. Registered Employment Agreements are particularly suited to the construction industry due to the labour intensive nature of the industry …


Pile Load Distribution Behavior Of Pile Group Foundations Subjected To Combined Vertical Load And Moment, Janine Correa Faustino Jan 2014

Pile Load Distribution Behavior Of Pile Group Foundations Subjected To Combined Vertical Load And Moment, Janine Correa Faustino

Chulalongkorn University Theses and Dissertations (Chula ETD)

The purpose of this thesis is to perform parametric studies of maximum pile force, pile settlement, pile cap rotation and pile force distribution on square shape pile group foundation by employing three-dimensional finite element software, PLAXIS 3D. The square pile group foundation is subjected to combined vertical load and moment under the elastic material of two soil layers. For this study, a special element in PLAXIS 3D, called embedded pile element is used to model each pile in the pile group foundation. To simulate the pile group foundation, a small gap between pile cap and subsoil is introduced in the …


ผลเฉลยสถานะวิบัติของเสาเข็มรับแรงดันด้านข้างในดินเหนียวโดยการวิเคราะห์ไฟไนต์อิลิเมนต์, สุรภาพ แก้วสวัสดิ์วงศ์ Jan 2014

ผลเฉลยสถานะวิบัติของเสาเข็มรับแรงดันด้านข้างในดินเหนียวโดยการวิเคราะห์ไฟไนต์อิลิเมนต์, สุรภาพ แก้วสวัสดิ์วงศ์

Chulalongkorn University Theses and Dissertations (Chula ETD)

วัตถุประสงค์ของวิทยานิพนธ์นี้เพื่อศึกษาเสาเข็มแรงดันด้านข้างวิบัติในดินเหนียว วิธีไฟไนต์อิลิเมนต์สองมิติและสามมิติถูกนำมาใช้เพื่อหาผลเฉลยในการศึกษานี้ การวิเคราะห์ไฟไนต์อิลิเมนต์แบบสามมิติบนระนาบความเครียดถูกนำมาใช้สำหรับการจำลองหน้าตัดแนวราบและหน้าตัดแนวดิ่ง การจำลองหน้าตัดแนวราบแสดงการประมาณของเสาเข็มรูปวงกลมหรือท่อรับแรงด้านข้างที่จุดศูนย์กลาง ในทางกลับกัน การจำลองหน้าตัดแนวดิ่งแสดงการประมาณของกำแพงฝังในดินซึ่งรับแรงดันด้านข้างและโมเมนต์ที่จุดบนสุด สำหรับกรณีเสาเข็มหน้าตัดแนวดิ่งและเสาเข็มจริงในระบบสามมิติ ที่หัวเสาเข็มถูกจำลองโดยแบ่งออกเป็นสองกรณีคือกรณีที่มีการยึดรั้งที่หัวเสาเข็มและไม่ยึดรั้งที่หัวเสาเข็ม นอกเหนือจากนี้ ผลกระทบของความหนาสำหรับการจำลองเสาเข็มหน้าตัดแนวดิ่งก็ถูกนำมาศึกษาเช่นกัน สำหรับการวิเคราะห์ทั้งหมด เสาเข็มถูกจำลองด้วยวัสดุแบบอิลาสติกและไม่เกิดการวิบัติขึ้นในโครงสร้าง ดินเหนียวถูกจำลองด้วยวัสดุแบบมอร์-คูลอมบ์ในสภาพไม่ระบายน้ำ ชิ้นส่วนเชื่อมต่อระหว่างดินและโครงสร้างถูกใช้ที่ผิวสัมผัสระหว่างดินเหนียวและเสาเข็มของทั้งสองหน้าตัด นอกจากนั้น ชิ้นส่วนเชื่อมต่อระหว่างดินและโครงสร้างถูกจำลองเป็นสองแบบคือ การเชื่อมต่อแบบแรงดึงสมบูรณ์ และ การเชื่อมต่อแบบไม่มีแรงดึง กรณีแรกจำลองสภาพไม่เกิดการแยกตัวระหว่างดินและโครงสร้าง แต่กรณีสองจำลองสภาพการแยกตัวระหว่างดินและโครงสร้าง ผลเฉลยแรงวิบัติของเสาเข็มรับแรงด้านข้างถูกนำเสนอในรูปของพารามิเตอร์ไร้มิติ ผลการศึกษาของงานวิจัยนี้ถูกเปรียบเทียบกับผลการศึกษาในอดีต นอกเหนือจากนี้ เส้นขอบเขตการวิบัติของผลเฉลยของเสาเข็มรับแรงในแนวราบและโมเมนต์ร่วมกันสำหรับกรณีเสาเข็มหน้าตัดแนวดิ่งและเสาเข็มจริงในระบบสามมิติก็ถูกนำเสนอเช่นกัน ท้ายที่สุด ผลกระทบสามมิติที่มีต่อผลเฉลยของตัวแปรไร้มิติของเสาเข็มรับแรงดันด้านข้างก็ถูกนำเสนอในงานวิจัยนี้


Laboratory Investigation And Numerical Modelling Of Track Foundation For High-Speed Railway Construction On Bangkok Soft Soil, Phitsanu Pholkainuwatra Jan 2014

Laboratory Investigation And Numerical Modelling Of Track Foundation For High-Speed Railway Construction On Bangkok Soft Soil, Phitsanu Pholkainuwatra

Chulalongkorn University Theses and Dissertations (Chula ETD)

The government of Thailand has recently decided to launch a high-speed railway project to promote regional economy and improve the logistics of trade to connect with other countries in Southeast Asia community. Raising a complication regarding the load transfers will certainly induce many problems to the railway system. Moreover, the constructions of railway substructures in the past often involve the low quality of materials especially in the Central Plain of Thailand. Therefore, it is necessary to determine the sources of construction materials for railway substructure materials. This study consists of two main objectives. The first objective is to investigate the …


Improving Enrollment In The Construction Management Graduate Program Through Students’ Perspectives, Mouloud Messaoudi Jan 2014

Improving Enrollment In The Construction Management Graduate Program Through Students’ Perspectives, Mouloud Messaoudi

Master of Technology Management Plan II Graduate Projects

Low enrollment and the decrease in graduation and retention rates are challenges facing the growth of the Master’s in Technology Management – Construction Management (MTM-CM) program at BGSU. In addition, the competition between the universities to enroll and retain more in-state, out-of-state, and international students is aggressive. There is a need for a revaluation for the MTM-CM program in order to attract more students in the future. This study is a necessary step to know what the MTM-CM students think about the product delivered to them at BGSU. There was no prior study investigating the satisfaction level of the construction …


Calibration Of Non-Nuclear Devices For Construction Quality Control Of Compacted Soils, Joshua E. R. Wells Jan 2014

Calibration Of Non-Nuclear Devices For Construction Quality Control Of Compacted Soils, Joshua E. R. Wells

Theses and Dissertations--Civil Engineering

Inadequate compaction of a soil subgrade can lead to detrimental outcomes that are not only costly but dangerous to the general public. To avoid this, quality control (QC) devices such as the nuclear density gauge (NDG) are currently being used to monitor the compaction and moisture content of soil subgrades. However, regulatory concerns associated with the NDG have encouraged federal and state agencies, as well as the heavy civil construction industry to consider non-nuclear devices for QC testing of compacted soils. One such non-nuclear device is the Soil Density Gauge (SDG), which utilizes electromagnetic wave propagation to obtain soil properties …


Utilization Of Simulated Ground Motions For Engineering Performance Assessment Of Tall Buildings, Nenad Bijelic, Ting Lin, Gregory Deierlein Jan 2014

Utilization Of Simulated Ground Motions For Engineering Performance Assessment Of Tall Buildings, Nenad Bijelic, Ting Lin, Gregory Deierlein

Civil and Environmental Engineering Faculty Research and Publications

No abstract provided.


Integrating Recycled Glass Cullet In Asphalt Roof Shingles To Mitigate Heat Island Effect, Micah Kiletico Jan 2014

Integrating Recycled Glass Cullet In Asphalt Roof Shingles To Mitigate Heat Island Effect, Micah Kiletico

LSU Master's Theses

As an approach to mitigate the harmful effects of Urban Heat Island (UHI), the use of glass cullet in the production of asphalt roof shingles has the potential to be employed as a cool roof strategy. The objective of this study was to test the hypothesis that the use of recycled glass increases solar reflectance index (SRI) without affecting the performance of asphalt roof shingles. In order to evaluate the feasibility of recycled glass for alternative uses, the engineering properties of glass cullet were investigated and compared to conventional aggregates used in the production of asphalt roof shingles. Laboratory samples …


Effect Of Different Alarm Interfaces On Controller Response, Aritra Datta Jan 2014

Effect Of Different Alarm Interfaces On Controller Response, Aritra Datta

LSU Master's Theses

Pipelines transport millions of barrels of petroleum products every day. Oil and gas pipelines have become important assets of the economic development of almost any country. Government regulations or internal policies regulate the safety of the assets for the population and environment where these pipelines run. Various strategies and technologies have been introduced for monitoring pipelines, but the most common technology to protect pipelines from occasional hazardous incidents is Computational Pipeline Monitoring (CPM). This technique collects and gathers information from the field related to pressures, flows, and temperatures to estimate the hydraulic behavior of the product being transported. Using the …


Evaluating The Impact Of Lean On Employee Ergonomics, Safety, And Job Satisfaction In Manufacturing, Amanda Morse Jan 2014

Evaluating The Impact Of Lean On Employee Ergonomics, Safety, And Job Satisfaction In Manufacturing, Amanda Morse

LSU Master's Theses

The goal of this study was to explore the proposed relationship between employee satisfaction, ergonomics, and safety while implementing a Kaizen event. In order to address this goal, two Kaizen events (K1 and K2) were conducted in a heavy equipment manufacturing plant. Before and after both events, levels of employee satisfaction were documented for Kaizen and Non-Kaizen (NK) participants using the Job Diagnostic Survey (JDS). The objective of the first event (K1) was to improve the efficiency of the task of torqueing the rear axle bolts in Station #1- skid assembly. The K1 methodology followed a traditional Kaizen structure, enhanced …


Testing And Analysis Of An Alternative Connection Method In Closed Panel Timber Frame Domestic Construction, Brendan Towey Jan 2014

Testing And Analysis Of An Alternative Connection Method In Closed Panel Timber Frame Domestic Construction, Brendan Towey

Masters

Construction practices continue to evolve in tandem with the requirements for more energy efficient buildings, materials and construction methods. This steady and progressive move towards the development of the industry and its products comes, not in leaps and bounds, but in incremental advances across all areas of construction. The research detailed in this project is one such advancement. Timber frame construction has been in existence for centuries and its tried and tested methods have been utilised worldwide in both domestic and industrial building. In recent times, standard open panel timber frame construction has been enhanced by the development of closed …


Behavior Of I-Section Gfrp Beam Including Retrofitting For Damage Effects, Mamadou Konate, Zia Razzaq Jan 2014

Behavior Of I-Section Gfrp Beam Including Retrofitting For Damage Effects, Mamadou Konate, Zia Razzaq

Civil & Environmental Engineering Faculty Publications

This paper presents the outcome of a study of an I-section Glass Fiber Reinforced Polymer (GFRP) beam including retrofitting for damage effects. A total of three beam tests were conducted in the following sequence: GFRP beam with no retrofitting and a single mid-span web brace; the partially damaged (cracked) beam with GFRP plates used for retrofitting; and the retrofitted beam re-tested with the lateral brace at the top flange level. Both cracking and lateral-torsional buckling behavior is studied and experimental load-deflection relationships recorded. Using the mechanical properties of GFRP based on the experimental data, theoretical predictions are made for the …


Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson Jan 2014

Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Temporary housing following a large-scale disaster has a positive effect on household welfare and community recovery. Following the 2010 and 2011 Canterbury earthquakes, a shortage of temporary accommodation created barriers for the outside construction workforce to engage in repairs and rebuild in Christchurch. This study investigates the impacts of housing shortages for the overall recovery and the strategies adopted by both households and the workforce in the building industry. Findings suggest that the interplay among the industry strategies and household strategies for securing housing determines the magnitude and scope of economy-wide inflation. One unfortunate consequence of these industry strategies is …


Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan Jan 2014

Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

The construction of nuclear power plants is a major step towards reducing greenhouse gas emissions compared to the conventional coal-fired or oil-fired power plants. However, some of the major nuclear accidents in the past have raised questions about the safety and reliability of nuclear power plants. This paper compares and contrasts the major nuclear accidents of the past for example, the Chernobyl disaster (USSR), the Fukushima Daiichi disaster (Japan), and the Three Mile Island incident (USA). Although each of the accidents was unique, a thorough comparison found some common issues, such as faulty design of reactors and safety systems, safety …


Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. Macaskill Jan 2014

Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. Macaskill

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

This paper investigates the decision-making processes guiding postdisaster infrastructure reconstruction— concentrating on wastewater, water supply, stormwater and road networks (“horizontal infrastructure”). It draws on empirical analysis of the postearthquake reconstruction currently underway in Christchurch, New Zealand.

Restoring infrastructure services to provide at least a basic level of essential services after a disaster helps wider economic recovery. Subsequently, there is pressure to restore infrastructure services to predisaster levels as quickly as possible. Reconstruction programmes thus commence in highly uncertain decision-making environments and are reactive to perceived, immediate needs. The extent and nature of the work is later clarified and re-evaluated as …


Selecting A Temporary Debris Management Site For Effective Debris Removal, Jooho Kim, Abhijeet Deshmukh, Makarand Hastak Jan 2014

Selecting A Temporary Debris Management Site For Effective Debris Removal, Jooho Kim, Abhijeet Deshmukh, Makarand Hastak

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

The overall debris removal after disasters is often prolonged due to the huge amount of debris and lack of capacities such as a Temporary Debris Management Site (TDMS) in the community. This results in a delay of overall recovery and increases the total recovery cost. Strategic planning and building a TDMS will help in providing extra time for proper disposal of debris and clearing a disaster-impacted site that will facilitate the reconstruction process. This paper presents a unique approach for identifying and selecting TDMS locations for expediting debris removal from the community. A hypothetical example of a community impacted by …


Bs News January/February Jan 2014

Bs News January/February

Building Services Engineering

No abstract provided.


Mechanical And Transport Properties Of Alkali-Activated Natural Pozzolans As Sustainable Binders, Brittany Radke Jan 2014

Mechanical And Transport Properties Of Alkali-Activated Natural Pozzolans As Sustainable Binders, Brittany Radke

Calvert Undergraduate Research Awards

OPC production accounts for 5 to 7% of the global carbon dioxide (CO2) emissions, contributing to global warming. The desire to reduce CO2 emissions and produce more durable concrete has given impetus to search for new binders. It is suggested that alkali-activated natural pozzolans have the potential for use as a sustainable replacement for OPC in concrete.

The current study presented herein evaluated fresh, mechanical, and transport properties of alkali-activated natural pozzolan mortars containing various concentrations of sodium hydroxide solutions as an alkaline activator. To this aim, alkali-activated natural pozzolan mortars were made with concentrations of sodium …


Implementing Green Roofs On Movie Theaters And Shopping Centers: Business Cases In Profitable Sustainability, Ryan J. Miller Jan 2014

Implementing Green Roofs On Movie Theaters And Shopping Centers: Business Cases In Profitable Sustainability, Ryan J. Miller

Pomona Senior Theses

This thesis presents the business case for installing green roofs on movie theaters and shopping centers. These businesses can then derive increased profits from the environmental benefits of reduced energy use and increased stormwater retention. After presenting the basic design and benefits of a green roof, the thesis develops stand-alone business plans for a movie theater and shopping center. The author finds that green roofs are a profitable sustainability solution for the commercial enterprise.


Network Interdependency Modeling For Risk Assessment On Built Infrastructure Systems, Vhance V. Valencia Dec 2013

Network Interdependency Modeling For Risk Assessment On Built Infrastructure Systems, Vhance V. Valencia

Theses and Dissertations

As modern infrastructures become more interconnected, the decision-making process becomes more difficult because of the increased complexity resulting from infrastructure interdependencies. Simulation and network modeling provide a way to understand system behavior as a result of interdependencies. One area within the asset management literature that is not well covered is infrastructure system decay and risks associated with that decay. This research presents an enhanced version of Haimes' input-output inoperability model (IIM) in the analysis of built infrastructure systems. Previous applications of the IIM characterized infrastructure at the national level utilizing large economic databases. This study develops a three-phased approach that …


The Performance Of Risk Management And Innovation In Construction Manager/General Contractor Delivery In Civil Construction Applications, Rebecca M. Owens Dec 2013

The Performance Of Risk Management And Innovation In Construction Manager/General Contractor Delivery In Civil Construction Applications, Rebecca M. Owens

Theses and Dissertations

Project teams that deliver high risk, complex projects in the civil construction industry need tools to enable successful delivery. Construction Manager/General Contractor (CM/GC) is an innovative alternate delivery method, providing one such a tool. CM/GC furnishes public agencies with an attractive option for delivering projects in a less adversarial and more constructive manner by involving the contractor during design. The sophisticated public owner does not have to relinquish control of the details of the design in order to accelerate the schedule or see the benefits of real-time cost estimating data. There are also significant cost and schedule benefits with not …


Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley Dec 2013

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley

Conference papers

The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only AEC / FM professionals who is in a position to view the product of the entire design and build process and, is responsible for the operational phase which incurs approximately five times the initial capital cost. Despite the potential benefits that the Facilities Manager offers, this profession still does not command the recognition it deserves within the AEC/FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM). In order for the BIM process to …


Standardized Longitudinal Connection Detail For Decked Precast Prestressed Concrete Girders, Ramzi Muftah Ali Abduallah Dec 2013

Standardized Longitudinal Connection Detail For Decked Precast Prestressed Concrete Girders, Ramzi Muftah Ali Abduallah

Masters Theses

The use of decked precast prestressed concrete girders (DPPCG) is becoming popular in accelerated bridge construction. DPPCGs are assembled and connected on site using grout or concrete longitudinal connections. The durability performance of these connections is a concern. The objective of this research is to document the longitudinal connection behavior with respect to its design parameters, and establish a process for developing a standardized connection detail considering the demands due to live load and temperature gradient (TG) load. In order to demonstrate this process, decked bulb-tee and decked box-beam girders were considered. Finite element models, under various types and levels …


In-Plane Loading Of Brick Veneer Over Wood Shear Walls, Elias Anis Toubia, James M. Lintz Dec 2013

In-Plane Loading Of Brick Veneer Over Wood Shear Walls, Elias Anis Toubia, James M. Lintz

Civil and Environmental Engineering and Engineering Mechanics Faculty Publications

In the design of wood stud walls with brick veneer, current design building codes specify that the wood stud wall should resist all in-plane and out-of-plane loads (IBC 2009). For out-of-plane loads, this assumption is entirely justified as the brittle brick veneer will crack and lose its capacity to resist bending. For in-plane loads, the brick veneer is significantly stiffer than the wood shear wall, and the veneer is unlikely to crack before the wood shear wall reaches its allowable capacity. The assumption that the wood shear wall resists the entire load is based on the further assumption that the …


Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan Dec 2013

Evaluation Of Alternative Project Delivery Methods In Water And Wastewater Projects, Ruiko Maharjan

UNLV Theses, Dissertations, Professional Papers, and Capstones

The United States (U.S.) is facing significant challenges in addressing aging water infrastructure. Most of the drinking water infrastructure is reaching the end of their useful lives. The American Water Works Association (AWWA) estimated that it will cost about $1 trillion to repair or replace drinking water pipes. Over the next 20 years, it will cost about $298 billion to fix or expand pipes of the nation's wastewater and storm-water systems (AWWA, 2012). Owners, engineers, and contractors are using Alternative Project Delivery (APD) methods - e.g., Design-Build Construction Management-at-Risk Construction Management/General Contractor- to build water and wastewater projects in order …


Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya Dec 2013

Performance Comparison Of Design-Build And Construction Manager/General Contractor Highway Projects, Binita Shakya

UNLV Theses, Dissertations, Professional Papers, and Capstones

Researchers have conducted numerous studies comparing project performance of design-bid-build (DBB) and design-build (DB) highway projects. However, little research has been done to compare the performance of DB and construction manager/general contractor (CM/GC) highway projects. Therefore, an exploratory study was conducted to compare the performance of 55 DB and 34 CM/GC highway projects from various States Departments of Transportation (DOTs) in terms of cost, change orders, and construction intensity. The results showed that contract award cost growth was significantly lower in DB projects than in CM/GC projects. In contrast to this, the total cost growth of DB projects was higher …


A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma Dec 2013

A Comparative Study Of Performance, Impediments, Advantages, And Disadvantages Of Construction And Professional Disadvantaged Business Enterprises, Ravi Sharma

UNLV Theses, Dissertations, Professional Papers, and Capstones

Construction and professional disadvantaged, minority, and women business enterprises (DBE/MBE/WBEs) face several impediments that hinder their business growth. A questionnaire survey was conducted to determine the important factors that affect their business performance, impediments faced by these business enterprises, advantages, and disadvantages of being DBE (DBE will be an umbrella designation for DBE, MBE, and WBE). This study compares the difference in responses from these two groups. A total of 333 business enterprises responded to the questionnaire. The survey results showed that construction firms gave significantly higher importance to "financial" issues and "safe work practices" as their most important factors …


Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates, Barry Mcauley, Alan V. Hore, Roger West, Deborah Rowland Nov 2013

Creating Interactive Facilities Management Capabilities Through Building Information Modelling As A Tool For Managing The Irish Public Sector Estates, Barry Mcauley, Alan V. Hore, Roger West, Deborah Rowland

Conference papers

The Irish Government manages estates that are faced with increased pressure on their greenhouse gas emissions, as well as, poorly managed assets that leave it increasingly difficult for an effective Facilities Management (FM) process to be operated. The FM processes represents the most costly stage in the life-cycle of a building and must now take priority in the design process, as the operating and maintenance costs can be up to five times the capital costs, with the business operating costs reaching up to two hundred times the capital costs over the life of the building. In order for Ireland to …


Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley, Alan V. Hore, Roger West Nov 2013

Establishing Key Performance Indicators To Measure The Benefit Of Introducing The Facilities Manager At An Early Stage In The Building Information Modelling Process, Barry Mcauley, Alan V. Hore, Roger West

Conference papers

The Facilities Manager occupies a unique position within the lifecycle of a building asset, as he/she is one of the only Architectural, Engineering, and Construction/Facilities Management (AEC / FM) professionals who is in a position to view the product of the entire design and build process. Despite the potential benefits that the Facilities Manager offers, this profession still remains largely undeveloped and still does not command the recognition it deserves within the AEC/FM sector. This is beginning to change through the introduction of Building Information Modelling (BIM) which can offer a new level of functionality for the management of buildings …


Public / Private Bim: An Irish Perspective, Barry Mcauley, Alan V. Hore, John Deeney Nov 2013

Public / Private Bim: An Irish Perspective, Barry Mcauley, Alan V. Hore, John Deeney

Conference papers

The current economic difficulties have affected most practitioners within the industry and, as a result, many firms and contractors are bidding for fewer projects, resulting in below-cost tenders. It is clear that, many firms and contractors are now operating on thin margins; which makes it increasingly difficult for them to commit to the introduction of new software applications and system upgrades. The transition to Building Information Modelling (BIM) from traditional 2D CAD by Irish firms and contractors has been a relatively slow process compared with our international colleagues. There are many reasons for this, including lack of resources, lack of …