Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Architecture (2)
- Arts and Humanities (2)
- Business (2)
- Business Administration, Management, and Operations (2)
- Electrical and Computer Engineering (2)
-
- Engineering (2)
- Environmental Indicators and Impact Assessment (2)
- Environmental Sciences (2)
- History (2)
- Natural Resources Management and Policy (2)
- Operations Research, Systems Engineering and Industrial Engineering (2)
- Physical Sciences and Mathematics (2)
- Power and Energy (2)
- Social and Behavioral Sciences (2)
- Statistics and Probability (2)
- Business Law, Public Responsibility, and Ethics (1)
- Civic and Community Engagement (1)
- Construction Engineering (1)
- Cultural Resource Management and Policy Analysis (1)
- Economics (1)
- Education Economics (1)
- Educational Assessment, Evaluation, and Research (1)
- Geography (1)
- International and Comparative Labor Relations (1)
- Labor Economics (1)
- Labor Relations (1)
- Law and Politics (1)
- Publication Type
Articles 1 - 3 of 3
Full-Text Articles in Education
Power E-Mergency: Combining Renewable Energy With Current Battery Technology For Emergency Medical Professionals, Caitlyn Portz
Power E-Mergency: Combining Renewable Energy With Current Battery Technology For Emergency Medical Professionals, Caitlyn Portz
Seattle Journal of Environmental Law
No abstract provided.
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.
Dickey-Lincoln School Lakes Project
This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.