Open Access. Powered by Scholars. Published by Universities.®

Operations and Supply Chain Management Commons™

Open Access. Powered by Scholars. Published by Universities.®

Project management

Discipline
Institution
Publication Year
Publication
Publication Type

Articles 1 - 19 of 19

Full-Text Articles in Operations and Supply Chain Management

Foundations Of Project Management, Michael Daniel Sherwin Aug 2026

Foundations Of Project Management, Michael Daniel Sherwin

Open Education Materials

This book aims to equip readers with practical tools and strategies for managing people, resources, and tasks effectively. We include examples, case studies, references, and tools and templates. We encourage you to explore references and videos to deepen your understanding of project management. It is designed for everyone, not just those individuals seeking to be project managers. Whether you are supporting or leading projects, this course will provide a foundation for developing the skills needed to drive results within an organization.

Course: GRBU 638

Creative Commons Attribution


The Role Of Stakeholder Management In The Adaptive Reuse Of Historic Buildings: Balancing Social, Economic, And Community Interests, Karina G. Iavarone Feb 2026

The Role Of Stakeholder Management In The Adaptive Reuse Of Historic Buildings: Balancing Social, Economic, And Community Interests, Karina G. Iavarone

Harrisburg University Dissertations and Theses

The adaptive reuse of historic buildings has emerged as a vital strategy for sustainable urban development. While such projects can preserve cultural heritage, revitalize communities, and stimulate economic growth, they often face significant challenges due to competing stakeholder priorities. The central problem addressed in this study is the lack of effective stakeholder management in adaptive reuse initiatives, which can result in project delays, inflated costs, and outcomes that overlook social sustainability.

The purpose of this qualitative, descriptive study was to explore how stakeholder management practices influence the success of adaptive reuse projects by balancing social, economic, and community interests. Three …


Project Management Hurdles In Public Health Interventions In Developing Countries, Irene Ogbuefi Jun 2024

Project Management Hurdles In Public Health Interventions In Developing Countries, Irene Ogbuefi

Harrisburg University Dissertations and Theses

Wealth disparity between developing countries and developing countries has created a gap yearning to be filled in certain sectors of the economy. The health sector in resource-poor settings struggle to provide human, capital and financial resources needed to combat some of the diseases plaguing them. To improve global healthcare goals, Development Assistance for Health (DAH) has been the saving grace. DAH provides technical and financial resources required to combat diseases like HIV/AIDs, Malaria and TB. However, the wind of change is blowing in the direction of in-country ownership for public health projects. DAH funding is dwindling but sustainability efforts from …


Exploring The Impact Of Artificial Intelligence On Project Management Across The Manufacturing, Technology, And Construction Industries, Susie Diaz Ferrera Jun 2024

Exploring The Impact Of Artificial Intelligence On Project Management Across The Manufacturing, Technology, And Construction Industries, Susie Diaz Ferrera

Harrisburg University Dissertations and Theses

This study explores the impact of Artificial Intelligence (AI) on project management across the manufacturing, technology, and construction industries. The research focuses on understanding the benefits, challenges, and long-term implications of AI utilization in these sectors. Key findings indicate that 46% of participants use AI mainly for task automation and enhancing functions like brainstorming and communication, which significantly boosts efficiency and team productivity. Despite these benefits, the research identifies several obstacles, including high initial costs, inadequate training, technical issues, and unclear regulatory guidelines. The study addresses four main questions, revealing that AI not only enhances project management processes but also …


Subcontracting And Rework Cost Sharing In Engineering-Procurement-Construction Projects, Zhenzhen Chen, Wanshan Zhu, Pascale Crama Aug 2023

Subcontracting And Rework Cost Sharing In Engineering-Procurement-Construction Projects, Zhenzhen Chen, Wanshan Zhu, Pascale Crama

Research Collection Lee Kong Chian School Of Business

Infrastructure development projects are overwhelmingly managed through engineering–procurement–construction (EPC) contracts, which allow a project end user to shift all project risks to a contractor. Accordingly, the International Federation of Consulting Engineers recommended a contract template based on a lump-sum contract between the end user and main contractor. However, EPC projects often suffer from quality issues due to moral hazard, which is aggravated by the involvement of subcontractors hired by the main contractor to perform parts of the project. Besides, costly rework is frequently needed to achieve the contractually mandated quality. When the main contractor must share some of the subcontractor’s …


Project Risk Management In Malaysian Oil And Gas Industry: Implementation By Epc Local Contractor, Che Rosli Zaim Aiman Jul 2020

Project Risk Management In Malaysian Oil And Gas Industry: Implementation By Epc Local Contractor, Che Rosli Zaim Aiman

Student Works (2020-2029)

The megaproject in Downstream Sector of Oil and Gas Industry only achieve 50% success rate which warrants attention by researchers. The Owners and Contractors are not fully aware on the full range of project risks and only few have demonstrated the knowledge and expertise in managing risk effectively. The common understanding had by the EPC Contractor is they are having the full flexibility and freedom in performing execution work by maximizing profit while still complying towards client’s requirement as the contract price has been fixed during award stage. However, there is a hidden risk which seldomly being placed attention by …


Challenges Of International Development Projects In Yemen: Perspective Of Public Work Project, Mohammed Lashuel Hassan Mohammed Feb 2020

Challenges Of International Development Projects In Yemen: Perspective Of Public Work Project, Mohammed Lashuel Hassan Mohammed

Student Works (2020-2029)

International development projects are public projects that are created to support the economy and people’s life needs, mostly these types of projects target developing countries. These types of projects face challenges more than other projects due to many reasons. Accordingly, this research aims to explore the challenges that face international development projects in Yemen and conducted by the Public Work Project and highlight the most significant issues that face ID project as well to overcome these challenges. This research adopted the qualitative method by conducting ten semi-structured interviews with the PWP team and others stakeholders. The interview technique was selected …


Task-Based Estimation And Planning For Application Development Projects And Resources: Models, Methods And Applications, Chidambaram Subbiah Nov 2019

Task-Based Estimation And Planning For Application Development Projects And Resources: Models, Methods And Applications, Chidambaram Subbiah

Dissertations

This dissertation takes a new approach to software development effort estimation from the perspective of design patterns at an organization. A new estimating tool is developed to provide bottom up estimates based on the design patterns of the organization. The research also offers guidelines for extracting the unique design patterns specific to an organization that are used to obtain baseline task level estimates in the Estimating Tool. In addition, the tool provides a suite of seven estimates using predictive analytics to estimate the labor hours required for a project using historical data, a bottom-up estimate that is rooted in the …


Encouraging Help Across Projects, Pascale Crama, Fabian J. Sting, Yaozhong Wu Mar 2019

Encouraging Help Across Projects, Pascale Crama, Fabian J. Sting, Yaozhong Wu

Research Collection Lee Kong Chian School Of Business

Companies struggle with timely project execution despite employing sophisticated management methods. Although help across projects is critical for time performance, it has not been explicitly incorporated into project management (PM) systems. We model a PM system, based on an innovative real-life practice, that both incorporates and shapes project managers’ helping behavior. A help process is at the core of this system, in which project managers may ask for and provide help while top management facilitates such exchanges. We find that companies should take a nuanced approach when designing help exchange and time-based incentives in tandem. A company that faces high …


Critical Factors In Project Success: A Study Of Public Sector Construction Projects In Malaysia., Wan Maimun Wan Abdullah Jan 2010

Critical Factors In Project Success: A Study Of Public Sector Construction Projects In Malaysia., Wan Maimun Wan Abdullah

Student Works (2010-2019)

The importance of the construction industry to nation building necessitates that project implemented achieves project success. However, studies and evidence have shown that there is a low probability in consistently achieving project success. Nevertheless, it seems that the definition of project success and how to achieve project success is quite illusive. For more than a century, researchers have been grappling with its definition but the concept remained ambiguous. From the early identification of time, cost and quality as elements of project success, researchers have added many other outcomes and objectives including stakeholders, project manager, communication, leadership, project management, organization structure, …


Classification Of Schedule Management Barriers Through Concept Mapping, Gregory W. Voth Mar 2009

Classification Of Schedule Management Barriers Through Concept Mapping, Gregory W. Voth

Theses and Dissertations

Barriers to adoption of schedule management processes are a matter of serious concern to the acquisition community. Schedule management has been widely accepted to contribute to the successful execution of complicated system development processes since the 1950s. However, studies of recent acquisition failures illustrate that over the last 15 years, there has been significant internal resistance to the adoption of schedule management processes. This exploratory effort used concept mapping to identify and classify the types of barriers existing in the Aeronautical Systems Center (ASC). A series of open-ended questions were posed to four experienced program managers in ASC. Units of …


Managing Project Uncertainty: From Variation To Chaos, Arnoud De Meyer, Christoph H. Loch, Michael T. Pich Dec 2002

Managing Project Uncertainty: From Variation To Chaos, Arnoud De Meyer, Christoph H. Loch, Michael T. Pich

Research Collection Lee Kong Chian School Of Business

The article cites a study finding that accurately gauging the degree of uncertainty inherent in the projects can help project managers quickly adapt to it. Researchers studied 16 projects in areas including personal-computer development, telecommunications, Internet startups, pharmaceutical development, iron-ore processing, airship development, and building construction, to examine risk management and project outcomes. They found that most managers failed to recognize that there are different types of uncertainty, each requiring a different management approach. This paper explores uncertainty-based management, which derives planning, monitoring and management style from an uncertainty profile comprising four types of uncertainty: variation, foreseen uncertainty, unforeseen uncertainty, …


The Assessment Of Program Managers' Preceptions Of Importance Of Stability To Overall Project Outcomes, Yigit Sen Mar 2001

The Assessment Of Program Managers' Preceptions Of Importance Of Stability To Overall Project Outcomes, Yigit Sen

Theses and Dissertations

This research investigates the manager's perceptions of the importance of stability to overall project outcomes. The assessment is based on the importance and usefulness of both the general attributes of management for the activities in a specific program, and the specific measures being employed by the managers. The classical measures of Cost, Schedule, Performance were assessed as well as Earned Value and proposed measures of Stability. In this research, the scope is limited to the management of relatively complex, large-scale projects involving the design, development and delivery of military aircraft and support systems. In order to obtain data for the …


Phase Transitions In Project Scheduling, Willy Herroelen, Bert De Reyck Jan 1999

Phase Transitions In Project Scheduling, Willy Herroelen, Bert De Reyck

Research Collection Lee Kong Chian School Of Business

Researchers in the area of artificial intelligence have recently shown that many NP-complete problems exhibit phase transitions. Often, problem instances change from being easy to being hard to solve to again being easy to solve when certain of their characteristics are modified. Most often the transitions are sharp, but sometimes they are rather continuous in the order parameters that are characteristic of the system as a whole. To the best of our knowledge, no evidence has been provided so far that similar phase transitions occur in NP-hard scheduling problems. In this paper we report on the existence of phase transitions …


Building A Conceptual Model To Define The F-22 Supply Support Decision Process, Steven P. James Sep 1998

Building A Conceptual Model To Define The F-22 Supply Support Decision Process, Steven P. James

Theses and Dissertations

The Air Force requires a method to determine the most effective and efficient means of supply support for new weapon system acquisitions. This study is a qualitative research effort that examines this requirement in an environment that embraces interim contractor support for the F-22. A series of six propositions are suggested to incorporate in the supply support decision-making process. A conceptual model is developed from these propositions to describe the process for determining the optimal timeframe for making long term supply support decisions. A systems approach to project management is used as the vehicle for this process, and the F-22 …


Bar Coding And The Construction Industry In Georgia And Alabama, Herbert Marion Barber Jr. Jan 1997

Bar Coding And The Construction Industry In Georgia And Alabama, Herbert Marion Barber Jr.

College of Graduate Studies: Theses & Dissertations (1964–2006)

Effective construction project management relies on data that can be processed into information (Bernold, 1990). Therefore, information on the construction project plays a key role in construction project management (Abudayyeh, 1991). Consequently, information management on the construction project is vital to the success of the construction project (Rasdorf, 1990). Bar coding is one option that can be used in the construction industry as an effective means of managing information (Stukhart, 1987).

The retail and manufacturing industries have used bar coding technology for several years to manage information (Bell, 1988) although the use of bar coding technology to manage information in …


Schedule Management Competencies For Department Of Defense Program Managers, Jeffrey F. Brown Sep 1995

Schedule Management Competencies For Department Of Defense Program Managers, Jeffrey F. Brown

Theses and Dissertations

With ongoing public scrutiny of defense system acquisitions, due to numerous program failures resulting from cost and schedule overruns, now, more than ever, cost and schedule-management competencies are critical to program success. This research examined the schedule-management competencies required of defense program managers. A schedule-management competency model was developed from a foundation of past research. The model was evaluated through a mail survey of 484 intermediate and senior level military program managers assigned to Air Force Materiel Command. The results provided by 243 respondents indicate that 25 of the 28 competencies in the model were valuable to program managers and …


Why Schedules Slip: Actual Reasons For Schedule Problems Across Large Air Force System Development Efforts, William M. Cashman Sep 1995

Why Schedules Slip: Actual Reasons For Schedule Problems Across Large Air Force System Development Efforts, William M. Cashman

Theses and Dissertations

The three main objectives of this research were to identify the actual reasons for schedule problems across large Air Force system development efforts, to quantity the importance of each category of reasons in terms of frequency and severity, and to demonstrate that the reasons for schedule problems are not program unique, but are common across system development efforts. To this end, this thesis contains a categorization and analysis of 549 reasons for schedule difficulties on 22 large Air Force Engineering and Manufacturing Development (EMD) programs from 1981 to 1994. These aircraft, missile, aircraft equipment, aircraft upgrade, and simulator programs had …


Flexibility And Fms: An Empirical Analysis, Mihkel Tombak, Arnoud De Meyer May 1988

Flexibility And Fms: An Empirical Analysis, Mihkel Tombak, Arnoud De Meyer

Research Collection Lee Kong Chian School Of Business

It is shown how the concerns of the managers of firms with flexible manufacturing system projects (FMS) differ from those of manufacturing firms without FMS projects. An economic model is developed from which two hypotheses are obtained. The first hypothesis is that firms were investing in FMS to deal with the variance in their inputs. The second proposition is that firms wished to use FMS to deal with the variance in their outputs. Through an analysis of manufacturing survey data it was found that firms planning to implement FMS were statistically more concerned about vendor quality and vendor lead times …