Agile Software Development: Creating A Cost Of Delay Framework For Air Force Software Factories, J. Goljan, Jonathan D. Ritschel, Scott Drylie, Edward D. White Jan 2021

Agile Software Development: Creating A Cost Of Delay Framework For Air Force Software Factories, J. Goljan, Jonathan D. Ritschel, Scott Drylie, Edward D. White

Faculty Publications

The Air Force software development environment is experiencing a paradigm shift. The 2019 Defense Innovation Board concluded that speed and cycle time must become the most important software metrics if the US military is to maintain its advantage over adversaries.1 This article proposes utilizing a cost-o­f-d­elay (CoD) framework to prioritize projects toward optimizing readiness. Cost-­of-d­elay is defined as the economic impact resulting from a delaying product delivery or, said another way, opportunity cost. In principle, CoD assesses the negative impacts resulting from changes to the priority of a project.


A Learning Curve Model Accounting For The Flattening Effect In Production Cycles, Evan R. Boone, John J. Elshaw, Clay M. Koschnick, Jonathan D. Ritschel, Adedeji B. Badiru Jan 2021

A Learning Curve Model Accounting For The Flattening Effect In Production Cycles, Evan R. Boone, John J. Elshaw, Clay M. Koschnick, Jonathan D. Ritschel, Adedeji B. Badiru

Faculty Publications

We investigate production cost estimates to identify and model modifications to a prescribed learning curve. Our new model examines the learning rate as a decreasing function over time as opposed to a constant rate that is frequently used. The purpose of this research is to determine whether a new learning curve model could be implemented to reduce the error in cost estimates for production processes. A new model was created that mathematically allows for a “flattening effect,” which typically occurs later in the production process. This model was then compared to Wright’s learning curve, which is a popular method used …


Use Of Factors In Development Estimates: Improving The Cost Analysis Toolkit, Matthew R. Markman, Jonathan D. Ritschel, Edward D. White Jan 2021

Use Of Factors In Development Estimates: Improving The Cost Analysis Toolkit, Matthew R. Markman, Jonathan D. Ritschel, Edward D. White

Faculty Publications

Factor Estimating is a technique commonly used by defense acquisition analysts to develop cost estimations. However, previous studies developing factors for the Engineering and Manufacturing Development (EMD) phase of the life cycle are limited. This research expands the current toolkit for cost analysts by developing cost factors in previously unexplored areas. More specifically, over 400 cost reports are utilized to create new standard cost factors that are delineated by five categories: commodity type, contract type, contractor type, development type, and Service. The factors are developed for those elements that are common in a wide array of projects such as program …


Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak Jan 2018

Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak

Faculty Publications

This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle for 36 Department of Defense aircraft programs. Starting from Milestone B, the authors examine CGFs at five gateways: Critical Design Review, First Flight (FF), the end of Developmental Test and Evaluation (DT&E), Initial Operational Capability, and Full Operational Capability. Each CGF is assigned a color rating based upon the program’s cost growth: Green (low), Amber (moderate), or Red (high). Significant findings include dependencies among similar CGF color ratings and cost growth occurring primarily between FF and the end of DT&E during a program’s life cycle.


The Impact Of Learning Curve Model Selection And Criteria For Cost Estimation Accuracy In The Dod, Candace Honious, Brandon Johnson, John J. Elshaw, A. B. Badiru Apr 2016

The Impact Of Learning Curve Model Selection And Criteria For Cost Estimation Accuracy In The Dod, Candace Honious, Brandon Johnson, John J. Elshaw, A. B. Badiru

Faculty Publications

The first part of this manuscript examines the impact of configuration changes to the learning curve when implemented during production. This research is a study on the impact to the learning curve slope when production is continuous but a configuration change occurs. Analysis discovered the learning curve slope after a configuration change is different from the stable learning curve slope pre-configuration change. The newly configured units were statistically different from previous units. This supports that the new configuration should be estimated with a new learning curve equation. The research also discovered the post-configuration slope is always steeper than the stable …


Acquisition Challenge: The Importance Of Incompressibility In Comparing Learning Curve Models, Justin R. Moore, John J. Elshaw, Adedeji B. Badiru, Jonathan D. Ritschel Oct 2015

Acquisition Challenge: The Importance Of Incompressibility In Comparing Learning Curve Models, Justin R. Moore, John J. Elshaw, Adedeji B. Badiru, Jonathan D. Ritschel

Faculty Publications

The Department of Defense (DoD) cost estimating methodology currently employs T. P. Wrights 75-plus-year-old learning curve formula. The goal of this research was to examine alternative learning curve models and determine if a more reliable and valid cost estimation method exists, which could be incorporated within the DoD acquisition environment. This study tested three alternative learning models (the Stanford-B model, DeJong's learning formula, and the S-Curve model) to compare predicted against actual costs for the F-15 A-E jet fighter platform. The results indicate that the S-Curve and DeJong models offer improvement over current estimation techniques, but more importantly and unexpectedly …


Investigation Into The Ratio Of Operating And Support Costs To Life-Cycle Costs For Dod Weapon Systems, Gary L. Jones, Edward D. White, Erin T. Ryan, Jonathan D. Ritschel Jan 2014

Investigation Into The Ratio Of Operating And Support Costs To Life-Cycle Costs For Dod Weapon Systems, Gary L. Jones, Edward D. White, Erin T. Ryan, Jonathan D. Ritschel

Faculty Publications

Recent legislation, such as the Weapon Systems Acquisition Reform Act of 2009, requires a renewed emphasis on understanding Operating and Support (O&S) costs. Conventional wisdom within the acquisition community suggests a 70:30 cost ratio with respect to O&S and acquisition of an average weapon system. Using 37 Air Force and Navy programs, the authors estimate the mean overall ratio of O&S costs to acquisition costs to be closer to 55:45, although many weapon systems displayed significant deviation from this 55 percent average. Contributing factors such as life expectancy and acquisition strategy (i.e., new system or modification) affect this variance. Their …


Capturing Creative Program Management Best Practices, Brandon Keller, Joseph R. Wirthlin Apr 2013

Capturing Creative Program Management Best Practices, Brandon Keller, Joseph R. Wirthlin

Faculty Publications

This research attempted to capture the creative aspects of government program management in three specific areas: efficiently navigating oversight, capturing the intent of regulations, and developing innovative risk management practices. Respected acquisition leaders with diverse backgrounds and experiences were interviewed with ranks ranging from 0-6 to 0-8 and GS-15 to SES. Several contractor interviews were conducted for specific purposes. The data were iteratively coded and analyzed using ATLAS.ti. The results were categorized into four themes, each with three sub-elements. Differences between respondents with program director experience and those with rapid acquisition experience are discussed. A survey was then distributed to …