Use Of Factors In Development Estimates: Improving The Cost Analysis Toolkit, Matthew R. Markman, Jonathan D. Ritschel, Edward D. White
Use Of Factors In Development Estimates: Improving The Cost Analysis Toolkit, Matthew R. Markman, Jonathan D. Ritschel, Edward D. White
Faculty Publications
Factor Estimating is a technique commonly used by defense acquisition analysts to develop cost estimations. However, previous studies developing factors for the Engineering and Manufacturing Development (EMD) phase of the life cycle are limited. This research expands the current toolkit for cost analysts by developing cost factors in previously unexplored areas. More specifically, over 400 cost reports are utilized to create new standard cost factors that are delineated by five categories: commodity type, contract type, contractor type, development type, and Service. The factors are developed for those elements that are common in a wide array of projects such as program …
Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak
Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak
Faculty Publications
This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle for 36 Department of Defense aircraft programs. Starting from Milestone B, the authors examine CGFs at five gateways: Critical Design Review, First Flight (FF), the end of Developmental Test and Evaluation (DT&E), Initial Operational Capability, and Full Operational Capability. Each CGF is assigned a color rating based upon the program’s cost growth: Green (low), Amber (moderate), or Red (high). Significant findings include dependencies among similar CGF color ratings and cost growth occurring primarily between FF and the end of DT&E during a program’s life cycle.