Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 331 - 360 of 851

Full-Text Articles in Construction Engineering

Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West Jul 2017

Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West

Conference papers

The Irish Government has requested that Enterprise Ireland, an organisation responsible for the development and growth of Irish enterprises in world markets to actively promote the use of BIM in Ireland. This promotion has taken the form of an opportunity for Enterprise Ireland clients to apply for a grant under their BIM Enable and BIM Implementation schemes and also through their funding of the BIM Innovation Capability Programme (BICP) of Ireland. The BICP is a two-year project (2016-2018) which seeks to capture the capability of the Irish Construction Industry and the Higher Education Institutes to respond to the increased requirement …


Bs News July/August Jul 2017

Bs News July/August

Building Services Engineering

No abstract provided.


Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson Jun 2017

Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson

Architectural Engineering

The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.

The first aspect of this project …


Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer May 2017

Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer

Architectural Engineering

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.


Bs News May/June May 2017

Bs News May/June

Building Services Engineering

No abstract provided.


The Professional Constructor, Full Issue, Volume 42, Number 01 Apr 2017

The Professional Constructor, Full Issue, Volume 42, Number 01

The Professional Constructor

No abstract provided.


Irish Bim Study 2017, Barry Mcauley, Alan Hore, Roger West Mar 2017

Irish Bim Study 2017, Barry Mcauley, Alan Hore, Roger West

Articles

The Construction IT Alliance (CitA) recently published its Global BIM Study as part of its BIM Innovation Capability Programme (BICP). The study sought to identify how BIM was being currently addressed in 27 countries across the globe. The study sought to identify the presence of three key ingredients in these countries:

1. Regulatory requirement for BIM

2. Champions driving BIM

3. Noteworthy publications

The report identified a number of recurring themes that would help to shape Ireland’s BIM programme. The report concluded that Ireland should adopt a programme of partnership between industry and the Irish Government in order to affect …


Bs News March/April Mar 2017

Bs News March/April

Building Services Engineering

No abstract provided.


A Laboratory Evaluation Of Warm Mix Technology For Use In Asphalt Rubber - Asphaltic Concrete Friction Courses: A Case Study Of Arizona, Michael Myung Jeong, Douglas I. Hanson Mar 2017

A Laboratory Evaluation Of Warm Mix Technology For Use In Asphalt Rubber - Asphaltic Concrete Friction Courses: A Case Study Of Arizona, Michael Myung Jeong, Douglas I. Hanson

The Professional Constructor

The objective of this study was to determine if warm mix additives currently used in Arizona can be added for the production of an Asphalt Rubber - Asphaltic Concrete Friction Course (AR-ACFC) without detrimental effects on performance of the pavement. Three warm mix additives (Evotherm®, Sasobit®, and Advera®) approved by Arizona Department of Transportation were investigated through a laboratory study along with statistical analysis. Three major concerns on performance of an AR-ACFC considered in this study are asphalt draindown, durability, and moisture susceptibility. The laboratory binder test results show there is no clear evidence that the use of Evotherm and …


How U.S. Universities Intend To Meet Their Carbon Neutral Goals, Dennis C. Bausman, Avinash Venugopal Mar 2017

How U.S. Universities Intend To Meet Their Carbon Neutral Goals, Dennis C. Bausman, Avinash Venugopal

The Professional Constructor

Universities have been on the leading edge for implementation of sustainable practices, green building certification, and the push to limit emission of greenhouse gases. In 2006 leadership at twelve universities was instrumental in the creation of the American College & University Presidents’ Climate Commitment (ACUPCC). The two overall goals of the ACUPCC were to gain university commitment to eliminate greenhouse gas emissions from their campus operations and to promote sustainability education and research. A decade later there are over 650 that have officially pledged their support to the ACUPCC and in doing so have established a goal toward carbon neutrality …


Using Percent Complete Metric To Highlight The Root Causes Of Delays In Home Building Industry, Somik Ghosh Mar 2017

Using Percent Complete Metric To Highlight The Root Causes Of Delays In Home Building Industry, Somik Ghosh

The Professional Constructor

Based on the prediction of US Housing and Urban Development (US HUD), the demand for new homes will increase in the coming months to accompany the steady sales of existing homes. To meet the future demand, the home building industry has to continuously improve and get rid of inherent problems such as frequent delays. While delays have been a common occurrence in the residential and commercial construction alike, investigations of delays in the residential sector has not received much attention. With the goal of exploring the causes of delays in the home building industry, a multiple case study approach was …


Are We On The Same Jobsite? The Millennial Generation Vs. Construction Industry Employees, Christine Piper, Varahee Madadi Mar 2017

Are We On The Same Jobsite? The Millennial Generation Vs. Construction Industry Employees, Christine Piper, Varahee Madadi

The Professional Constructor

This paper gives an overview of a study conducted in a geographical area of the US to understand the millennial generation’s perception of the workplace of the construction industry. Many organizations face the challenge of integrating diverse generations in a workplace. With the retirement of a large number of Boomers and the current intake of Millennials in the workplace, organizations are facing a challenge to attract and retain the millennial generation. Workplace expectations of the millennial generation and employees are compared with the expectations of the workplace amongst different generations in the construction industry.


Math Skills That Don’T Add Up; A Comparison Between Eighth Grade And College Students, Nathan Barry, Angela Hollman, Dale Porter Mar 2017

Math Skills That Don’T Add Up; A Comparison Between Eighth Grade And College Students, Nathan Barry, Angela Hollman, Dale Porter

The Professional Constructor

Among 34 participating countries within the Organization for Economic Cooperation and Development (OECD), the United States performed below average in mathematics earning a rank of 27. The World Economic Forum (2014) ranks the United States 51 out of 144 countries scoring a 4.4 out of 7 (7 = excellent) in the quality of mathematics and science education. Although the United States’ competitive advantage and economic growth is directly connected to science, technology, engineering, and math (STEM) careers, only 28 percent of those students choose to major with these fields in college. In addition, 48 percent of students that choose to …


Bicp Global Bim Study - Lessons For Ireland’S Bim Programme, Barry Mcauley, Alan Hore, Roger West Feb 2017

Bicp Global Bim Study - Lessons For Ireland’S Bim Programme, Barry Mcauley, Alan Hore, Roger West

Reports

The Construction IT Alliance (CitA) has been promoting the benefits of digitisation in the construction and engineering industry in Ireland since its formation back in 2002. Whilst the Alliance has always strived to ensure that its members are exposed to a wide spectrum of contemporary digital tools and processes, the concept of Building Information Modelling (BIM) has dominated the focus of its activities over the past five years.

BIM can be described as a digital tool that facilitates everybody to better understand a building or structure through the use of a digital model which draws on a range of data …


Compact Facility For Testing Steady And Transient Thermal Performance Of Building Walls, Aimee Byrne, Gerard Byrne, Anthony Robinson Jan 2017

Compact Facility For Testing Steady And Transient Thermal Performance Of Building Walls, Aimee Byrne, Gerard Byrne, Anthony Robinson

Articles

Energy efficiency retrofit of buildings represents a key effort in reducing EU energy demand by 20% by 2020. However, predictions tend to overestimate savings by large percentages. The shortfall in savings can be attributed to incorrect predictive techniques, comfort takeback along with other behavioural and workmanship variables. Common predictive techniques related to heat loss tend to be based on the U-value of the building envelope. This paper presents the design of a more straightforward and compact version of the traditional Hot-Box apparatus (measures U-value) which instead determines the thermal resistance of samples of building envelope. U-value includes the need to …


Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews Jan 2017

Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews

Conference papers

This paper describes the background to and execution of a postgraduate project undertaken by students on DIT's MSc in Geospatial Engineering (GeoEng) in support of a project on level 2 BIM being undertaken by students on the MSc in applied Building Information Modelling & Management (aBIMM) around the retrofit of and new build extension to the Grangegorman Clock Tower Building. In support of this requirement, an external and internal survey of the existing structure and its surrounding topography was required. The aBIMM students and staff acted as the Design Team who subcontracted the Geo Eng group who were organised into …


Cfrp Retrofitting Schemes For Prestressed Concrete Box Beams For Highway Bridges, Hussein A. Herish, Zia Razzaq Jan 2017

Cfrp Retrofitting Schemes For Prestressed Concrete Box Beams For Highway Bridges, Hussein A. Herish, Zia Razzaq

Civil & Environmental Engineering Faculty Publications

This paper investigates various retrofitting schemes for a prestressed concrete box beam using carbon fiber reinforced polymer (CFRP) sheets with the goal of increasing flexural strength. A simply-supported box beam is studied with a constant uniformly distributed load and three gradually increasing concentrated loads proportional to HS20 truck loading of the Association of State Highway and Transportation Officials (AASHTO). Various retrofitting schemes are considered each with single, double, and triple CFRP sheets, respectively, installed in high compression and tension regions. Cross-sectional nonlinear moment-curvature relations are developed and coupled with a finite-difference solution algorithm to predict load-deflection relations for both retrofitted …


Prestressed Concrete Inverted Tee Beams With Cfrp For Building Structures, Herish A. Hussein, Zia Razzaq Jan 2017

Prestressed Concrete Inverted Tee Beams With Cfrp For Building Structures, Herish A. Hussein, Zia Razzaq

Civil & Environmental Engineering Faculty Publications

Presented herein is the outcome of a study of prestressed concrete inverted tee beams with carbon fiber reinforced polymer (CFRP) sheets for possible use in building structures. To determine an effective approach for the use of CFRP, nine different retrofitting schemes are investigated for a prestressed beam under quasi-static distributed load to increase flexural strength. The theoretical analysis is based on coupling moment-curvature relations with a central finitedifference formulation. Three different thicknesses of CFRP sheets are studied in both tension and compression and effective retrofitting schemes are identified.


Bs News January/February Jan 2017

Bs News January/February

Building Services Engineering

No abstract provided.


The Impact Of Project Delivery Methods On Dispute Occurrence In Public Highway Projects, Samaneh Nasrollahi, Ghada M. Gad, Alan Atalah Dec 2016

The Impact Of Project Delivery Methods On Dispute Occurrence In Public Highway Projects, Samaneh Nasrollahi, Ghada M. Gad, Alan Atalah

Master of Technology Management Plan II Graduate Projects

The construction industry is a complex and competitive industry in which different participants with different expertise, talents, and levels of knowledge work together to achieve their objectives and complete a project. Sine different participants with different interest involve in a construction project, therefore, conflicts arise and become inevitable. Conflicts in projects will cause an adversarial environment which result to disputes. Hence, if conflicts are not well managed and resolved in a timely manner, they quickly turn into disputes, which prevent the successful completion of the construction project, in terms of cost and time, and increasing the potential for poor project …


Kihefo Vocational Center: Kabale, Uganda, Jason Matthew Angerer Dec 2016

Kihefo Vocational Center: Kabale, Uganda, Jason Matthew Angerer

Construction Management

Journeyman International (JI) is a non-profit organization which acts as a platform for bringing together volunteer Architects, Designers, Engineers, and Construction Managers with humanitarian projects around the world. Kigezi Healthcare Foundation (KIHEFO) a non-profit NGO located in Kabale, Uganda is a client seeking to build a vocational center to educate the workforce of Uganda. The center will include multi-purpose class rooms, a dining hall, rabbit farm, carpentry shop, and living complex. The Architect on the project was Courtney Wedel from Cal Poly. As the Construction Manager on the project my responsibilities include; Design Assist, Feasibility Analysis, Scheduling, Estimating, and Managing …


Bs News November/December Dec 2016

Bs News November/December

Building Services Engineering

No abstract provided.


How Acoustics In California High Performance Schools Relate To Student Achievement, Devin K. Wong Nov 2016

How Acoustics In California High Performance Schools Relate To Student Achievement, Devin K. Wong

Durham School of Architectural Engineering and Construction: Dissertations, Theses, and Student Research

This research project seeks to determine if students attending K–12 schools meeting a minimum standard of high performance classroom conditions in the state of California do evidence higher scholastic achievement, based on publically available results on state-wide standardized tests. In three phases, a subset of 200+ schools applying for grants dedicated to building high performance schools over the past decade was correlated with an existing database of achievement scores for all public schools in California. The criteria utilized to specify high performance classrooms was provided by the California High Performance Initiative (HPI) Grant program. Academic achievement was evaluated on a …


Fall 2016 - Volume 41, Number 1, Full Issue Sep 2016

Fall 2016 - Volume 41, Number 1, Full Issue

The Professional Constructor

No abstract provided.


Bs News September/October Sep 2016

Bs News September/October

Building Services Engineering

No abstract provided.


Capacity Building For Sustainable Workforce In The Construction Industry, Edelmiro F. Escamilla, Mohammadreza Ostadalimakhmalbaf Sep 2016

Capacity Building For Sustainable Workforce In The Construction Industry, Edelmiro F. Escamilla, Mohammadreza Ostadalimakhmalbaf

The Professional Constructor

Research has shown that the construction industry will face workforce shortages that will increase delivery cost and completion time. The purpose of this paper is to first identify and synthesize the fundamental factors impacting recruitment and retention of the potential construction workforce. A qualitative approach was employed in order to collect and synthesize known factors related to workforce development and capacity building for the construction industry. The paper then presents a conceptual framework for conducting research on capacity generation of a sustainable construction workforce—by considering the impact of family unit and cultural values, career path perceptions, higher educational attainment, and …


Comparing Owner Perceptions Vs. Performance Reality On Construction Management At Risk Public School Projects, Noel Carpenter, Dennis C. Bausman Sep 2016

Comparing Owner Perceptions Vs. Performance Reality On Construction Management At Risk Public School Projects, Noel Carpenter, Dennis C. Bausman

The Professional Constructor

Over the past decade construction expenditures for education have reached approximately $350 billion with $195 billion of that total spent on K-12 public schools. Public funding through state and local taxes is the primary source of support for construction and school districts are charged with spending these dollars wisely. Within the confines of procurement statutes school districts must select a delivery method that best suits their needs. Two commonly used delivery methods are Design-Bid-Build and Construction Manager at Risk (CM at Risk). This paper examines qualitative and quantitative data collected from one hundred thirty-seven new K-12 school projects constructed in …


Free Fall Of Self-Consolidating Concrete In Walls Three Meters High, Donald J. Phillippi, Katie Loughmiller, Ray Buyle, Michael Cesena Sep 2016

Free Fall Of Self-Consolidating Concrete In Walls Three Meters High, Donald J. Phillippi, Katie Loughmiller, Ray Buyle, Michael Cesena

The Professional Constructor

Self-consolidating concrete, (SCC) is a highly flowable, non-segregating concrete that allows for concrete placement without vibration or external consolidation. SCC also allows rapid concrete placement with reduced labor costs, resulting in vastly improved concrete surface finishes and architectural applications (RMCAO 2009). To accomplish SCC, the concrete industry has developed improvements in high-range water reducer admixtures for flowability and viscosity-modifying admixtures for stability. The current project investigated six specimens, which provided an evaluation of SCC allowed to free fall 3 m (10 ft) that filled wall formwork with different inclinations and amounts of steel reinforcement. The purpose of the investigation was …


Mechanical And Thermal Evaluation Of Different Types Of Pcm-Concrete Composite Panels, Dervilla Niall, Oliver Kinnane, Roger West, Sarah Mccormack Aug 2016

Mechanical And Thermal Evaluation Of Different Types Of Pcm-Concrete Composite Panels, Dervilla Niall, Oliver Kinnane, Roger West, Sarah Mccormack

Conference papers

ABSTRACT: Thermal mass indicates the ability of a material to store and release heat and is a function of the heat storage capacity of a material. The thermal mass of construction materials can be used to reduce the energy required for heating and cooling buildings. The heat storage capacity of concrete can be increased by incorporating phase change materials (PCMs) into the concrete and hence providing additional latent heat storage capacity. Research was carried out to compare the thermal behaviour of two different types of PCM/concrete composite panels. The first type of panel was formed by adding microencapsulated paraffin to …


Bs News July/August Jul 2016

Bs News July/August

Building Services Engineering

No abstract provided.