Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 91 - 120 of 25132

Full-Text Articles in Entire DC Network

Exploring The Significance Of Kenya's Indigenous And Emerging Blue Foods For Sustainable Aquaculture Development. A Review, Jonathan Munguti, Mavindu Muthoka, Domitila Kyule, Esther Magondu, Kevin Obiero, Jimmy Mboya, Menaga Meenakshisundaram, Tanga M. Chrysantus, Gerald Kwikiriza, Francis K. Njonge Oct 2026

Exploring The Significance Of Kenya's Indigenous And Emerging Blue Foods For Sustainable Aquaculture Development. A Review, Jonathan Munguti, Mavindu Muthoka, Domitila Kyule, Esther Magondu, Kevin Obiero, Jimmy Mboya, Menaga Meenakshisundaram, Tanga M. Chrysantus, Gerald Kwikiriza, Francis K. Njonge

All Peer-Reviewed Publications

Kenya's aquaculture sector is at a pivotal stage, transitioning from a historical reliance on Nile tilapia and African catfish toward a more diversified production portfolio that integrates indigenous and emerging freshwater and marine species. This shift is increasingly recognized as essential to enhance climate resilience, food security, and ecosystem health. This systematic review synthesizes more than two decades (2000 to 31st January, 2026) of peer-reviewed literature to evaluate the biological suitability, culture performance, and socio-ecological roles of underutilized native taxa, including Ningu (Labeo victorianus), Jipe tilapia (Oreochromis jipe), freshwater prawns (Macrobrachium spp.), rabbitfish (Siganus sutor), marine-acclimatized Nile tilapia, mud crab …


Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson Sep 2026

Operations And Maintenance Report Grove Gulch Sedimentation Bay For Third Quarter 2026 And Post-Storm 09.22.26 Silver Bow Creek/Butte Area Npl Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. Cv 89-039-Bu-She, Josh Bryson

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc. Sep 2026

Draft Final Quarterly Operations And Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2026, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No 135 – Washoe Sampling Works, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary Sep 2026

A Node-Adaptive Meta Graph Learning Framework For Smart Energy Systems-Digitalizing Wildfire Risk Assessment In Renewable-Integrated Grids, Junde Chen, Wenzhao Li, Rejoice Thomas, Polukh Polukhov, Hesham El-Askary

Mathematics, Physics, and Computer Science Faculty Articles and Research

Wildfires pose escalating threats to the resilience of modern power delivery networks, which are increasingly evolving into complex Cyber-Physical Systems (CPS). In these systems, localized infrastructure damage can precipitate catastrophic large-scale outages and cascading failures. Conventional wildfire risk indices, developed for ecological and community safety, fail to account for the geospatial dependencies and operational context relevant to electricity infrastructure. To bridge this gap, we establish a risk assessment framework that converts meteorological variables into a grid-centric Fire Danger Weather Index (FDWI) and propose the Node-Adaptive Meta Graph Convolutional Recurrent Network (NM-GCRN), a highly efficient AI/ML architecture designed to generate fine-grained, …


Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society, Sizhuo Chen, Zhen Cong Sep 2026

Age Differences In Perceived Individual And Community Recovery After Tornadoes: Implications For Community-Centered Recovery Policy In An Aging Society, Sizhuo Chen, Zhen Cong

Health Sciences and Kinesiology Faculty Articles

"This study examines perceived individual recovery and perceived community recovery among tornado survivors across three waves spanning four years. Using three-wave longitudinal survey data from survivors in Dallas, Texas; Nashville, Tennessee; and Birmingham, Alabama collected in 2021, 2022, and 2025, we estimate recovery trajectories using linear mixed-effects growth models. We link respondents to tract-level SVI 2020 component measures to examine whether tract-level social vulnerability contextualizes age differences in recovery perceptions. We ask: (1) How do perceived individual recovery and perceived community recovery change over time? (2) Do these trajectories differ by age group? (3) Do community social vulnerability measures contextualize …


Understanding The Role Of Data Science Applications In Soil And Water Health, Payton Davis, Debabrata Sahoo, Dara Park, Brook Russell Sep 2026

Understanding The Role Of Data Science Applications In Soil And Water Health, Payton Davis, Debabrata Sahoo, Dara Park, Brook Russell

Forestry and Natural Resources

Data science is an emerging field that can be incorporated into many disciplines, including environmental science. Data science can provide valuable information from data, enhancing the understanding of systems and environments. This publication is intended to give an overview of the different aspects of data science and how data science can be leveraged into and applied to soil and water health.


Geotechnical Enhancement Of Noncohesive Coal Mine Overburden Using Microbially Induced Calcite Precipitation And Fly Ash Stabilization For Sustainable Pavement Applications, Atul Gautam, Laxmikant Yadu Sep 2026

Geotechnical Enhancement Of Noncohesive Coal Mine Overburden Using Microbially Induced Calcite Precipitation And Fly Ash Stabilization For Sustainable Pavement Applications, Atul Gautam, Laxmikant Yadu

Journal of Sustainable Mining

The majority of the waste generated from opencast mining, termed as overburden (OB), is dumped adjacent to the mine boundary and poses long-term stability issues. Various studies have been carried out to assess the risk of dump slope failure, and treatment strategies have been accordingly recommended to strengthen this OB dump. However, scant works are reported to sustainably utilize this OB for construction works. This study aims to quantify the performance of stabilized noncohesive coal mine OB collected from Gondegaon opencast mine (OCM) in India. Stabilization was achieved using two techniques, namely microbially induced calcite precipitation (MICP) through Sporosarcina pasteurii …


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 129 – Heaney Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 135 – Washoe Sampling Works, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 105 – Lizzie Shaft, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 46 – Missoula Mine, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 11 – Magna Charta Lessee Dumps, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Field Sampling And Investigation Plan: Bres No. 1503 – Hornet Addition, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc. Sep 2026

2026 Final Bpsou Backfill And Cover Material Quality Assurance Project Plan (Qapp), Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Next-Day Pm10 Prediction Maps For South Korea Using Machine Learning With Meteorological And Transboundary Air Quality Data, Yemin Jeong, Jaejin Kim, Jinsoo Kim, Menas Kafatos, Seung Hee Kim, Yangwon Lee Sep 2026

Next-Day Pm10 Prediction Maps For South Korea Using Machine Learning With Meteorological And Transboundary Air Quality Data, Yemin Jeong, Jaejin Kim, Jinsoo Kim, Menas Kafatos, Seung Hee Kim, Yangwon Lee

Institute for ECHO Articles and Research

PM10 poses significant risks to public health, and reliable short-term prediction is essential for air quality management. In this study, we developed an observation-driven framework for generating nationwide next-day (D + 1) PM10 prediction maps over South Korea using machine learning. The framework integrates ground-based PM10 observations from the AirKorea monitoring network, meteorological variables derived from the Local Data Assimilation and Prediction System (LDAPS), and a regional transport proxy based on PM10 observations from upwind locations in China. Station-based predictors were converted into spatially continuous grids using kriging and subsequently used as inputs for two tree-based ensemble models: Random Forest …


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Implementation Of The Trojan Sex Chromosome Approach In The San Juan River: Investigation And Validation Of Feminization Methods For Channel Catfish, Chad Teal Sep 2026

Implementation Of The Trojan Sex Chromosome Approach In The San Juan River: Investigation And Validation Of Feminization Methods For Channel Catfish, Chad Teal

Funded Research Records

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Pioneer Technical Services, Inc. Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) 2025 Surface Water Compliance Evaluation Technical Memorandum (Dated June 29, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) 2025 Surface Water Compliance Evaluation Technical Memorandum (Dated June 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.