Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network™

Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 121 - 150 of 25132

Full-Text Articles in Entire DC Network

Legal Shifts And Judicial Inconsistencies In Strict Liability After The Omnibus Law: A Critical Analysis Of Indonesian Environmental Law For Responsible Mining And Esg Compliance, Nurul Listiyani, Khenza Atthaya Namira Yulianto Sep 2026

Legal Shifts And Judicial Inconsistencies In Strict Liability After The Omnibus Law: A Critical Analysis Of Indonesian Environmental Law For Responsible Mining And Esg Compliance, Nurul Listiyani, Khenza Atthaya Namira Yulianto

Journal of Environmental Science and Sustainable Development

The legal significance of strict liability in mining arises from the sector’s capacity to generate technically complex, diffuse, and long-latency environmental harm that is difficult to address through fault-based litigation alone. This study aims to evaluate how the post-Omnibus Law reformulation of Article 88 of Law No. 32 of 2009 has affected the doctrinal autonomy, judicial consistency, and practical enforcement of strict liability in Indonesian environmental law. The research used normative doctrinal legal research including statutory, case-law, conceptual, comparative, and evaluative analyses. The data cover the 2009–2025 period and consist of two core statutory formulations of Article 88, the Job …


Re: Approval Letter For The Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated August 28, 2026), Emma Rott Sep 2026

Re: Approval Letter For The Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (Dated August 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 29, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Site-Wide Surface Water Monitoring Data Summary Report (Dated May 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2026 Interim Site- Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated August 28, 2026), Emma Rott Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Final 2026 Interim Site- Wide Surface Water Monitoring Quality Assurance Project Plan (Qapp) (Dated August 28, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report January – December 2025 (Dated May 29, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Draft 2025 Groundwater Monitoring Data Summary Report January – December 2025 (Dated May 29, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal (Dated May 19, 2026), Emma Rott Sep 2026

Re: Comment Letter For Butte Priority Soils Operable Unit (Bpsou) Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal (Dated May 19, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final 2023 Insufficiently Reclaimed Sites Sampling: Bres No. 93 – Soudan Dump Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty Sep 2026

Re: Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-53 – South Of Surprise Dump, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 68 – Little Mina-2, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 57 – Little Mina-1, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 9 – Clark Street Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 171 – Blaine Center, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 75 – National Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 160s – Syndicate Pit Dumps, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated August 14, 2026), Emma Rott Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) (Dated August 14, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) Revision 0 (2026) Request For Change (Rfc)-2026-001 (Dated September 8, 2026), Emma Rott Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Clark Tailings Consolidated Waste Management Area (Ctcwma) Site Investigation Quality Assurance Project Plan (Qapp) Revision 0 (2026) Request For Change (Rfc)-2026-001 (Dated September 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Reclamation Improvement Field Sampling And Investigation Plan: Bres No. 180 – Tullamore Dump, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026), Emma Rott Sep 2026

Re: Conditional Approval Letter For Butte Priority Soils Operable Unit (Bpsou) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (Pdiwp) (Dated September 8, 2026) And The 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (Qapp) (Dated September 8, 2026), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Uncontrolled Surface Flow Areas Drainage C 95% Design Remedial Action Work Plan, Molly Roby Sep 2026

Re: Approval Letter For The Uncontrolled Surface Flow Areas Drainage C 95% Design Remedial Action Work Plan, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Multi-Temporal Satellite Observations And Machine Learning-Based Flood Susceptibility Assessment Of The 2025 Punjab Flood, Ankush Kumar, Ashwani Raju, Saraah Imran, Ramesh P. Singh Sep 2026

Multi-Temporal Satellite Observations And Machine Learning-Based Flood Susceptibility Assessment Of The 2025 Punjab Flood, Ankush Kumar, Ashwani Raju, Saraah Imran, Ramesh P. Singh

Mathematics, Physics, and Computer Science Faculty Articles and Research

Over the past decade, the Punjab plains of Northern India have experienced recurrent flooding driven by hydroclimatic variability, specifically shifts in western disturbances that have intensified monsoon precipitation. Following a devastating flood in 2025, the region remains highly vulnerable to hydrological extremes, a risk further exacerbated by shifting land use and agricultural patterns, geomorphic parameters, and complex fluvial systems. This study assesses flood susceptibility by integrating multi-sensor satellite observations, multi-temporal Sentinel-1 backscatter signals, and refined runoff potential estimates derived from local climate zones, accounting for land cover, soil type, and infiltration characteristics, into machine learning frameworks. The model is trained …


Comparison Of Gravity Separation And Flotation For Pyrite Recovery From Tailings, Gülay Bulut, Gönül Göksu Gökçe, Dilruba Karamanlı, Oğuzhan Mert Gürkan, Ergin Sarp Zenzirci, Binnur Kırım, Alim Gül Sep 2026

Comparison Of Gravity Separation And Flotation For Pyrite Recovery From Tailings, Gülay Bulut, Gönül Göksu Gökçe, Dilruba Karamanlı, Oğuzhan Mert Gürkan, Ergin Sarp Zenzirci, Binnur Kırım, Alim Gül

Journal of Sustainable Mining

Tailings generated during the production of lead, zinc, and copper concentrates contain significant amounts of sulfide minerals, particularly pyrite. Pyrite, which remains in tailings after the recovery of other metals, is one of the main contributors to acid mine drainage (AMD). Therefore, recovering pyrite from tailings is environmentally and economically an important issue. In this study, pyrite recovery from tailings was investigated using flotation and gravity separation methods. Mineralogical characterization and liberation analyses were conducted by Mineral Liberation Analysis (MLA), indicating that pyrite is the major sulfide mineral with over 76% liberation degree even in the coarsest fractions. Flotation tests …


Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc. Sep 2026

Revised Draft Final Annual Operations And Maintenance (O&M) Report: Butte Treatment Lagoon (Btl) System – 2025, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Hydro-Chemical And Bacteriological Assessment Of Zanzibar Groundwater Resources, Subira Munishi, Andrew Kimati Sep 2026

Hydro-Chemical And Bacteriological Assessment Of Zanzibar Groundwater Resources, Subira Munishi, Andrew Kimati

Tanzania Journal of Engineering and Technology (TJET)

Groundwater is the primary freshwater source in Zanzibar, sustaining domest ic, agricultural, and tourism needs. Increasing demand has intensified the pressure on this limited resource and has led to over-abstraction and contamination. Amid the growing demand and contamination pressures, this study examines the quality of groundwater in Zanzibar to clarify current conditions and emerging risks, and inform resource management and public health priority interventions. Particularly, the present hydro-chemical and bacteriological quality and variability was examined for both Unguja and Pemba Islands. A total of seventy-two samples were collected using a stratified random sampling approach, with the first field campaign focusing …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites: Ur-42 Site Evaluation Summary Report (Sesr) (Dated July 22, 2026), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby Sep 2026

Re: Approval Letter For The Butte Priority Soils Operable Unit, Draft Final Unreclaimed Sites: Ur-31 Site Evaluation Summary Report, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026, Molly Roby Sep 2026

Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) 2026 Final Backfill And Cover Soil Quality Assurance Project Plan (Qapp) Dated August 26, 2026, Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc. Sep 2026

Draft Final 2023 Unreclaimed Sites Sampling: Ur-43 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate 90, Mike Mcanulty Sep 2026

Butte Priority Soils Operable Unit Final Butte Priority Soils Operable Unit Unreclaimed Sites Field Sampling And Investigation Plan: Ur-41 – Montana Street And Interstate 90, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.