Open Access. Powered by Scholars. Published by Universities.®
- Institution
- Publication
- Publication Type
Articles 1 - 7 of 7
Full-Text Articles in Urban Studies and Planning
Agenda: Best Practices For Community And Environmental Protection, University Of Colorado Boulder. Natural Resources Law Center. Intermountain Oil And Gas Bmp Project, Colorado. Oil And Gas Conservation Commission
Agenda: Best Practices For Community And Environmental Protection, University Of Colorado Boulder. Natural Resources Law Center. Intermountain Oil And Gas Bmp Project, Colorado. Oil And Gas Conservation Commission
Best Practices for Community and Environmental Protection (October 14)
The first Intermountain BMP Project workshop, sponsored by the Natural Resources Law Center and the Colorado Oil and Gas Conservation Commission, was held in Rifle, Colorado on October 14, 2009 at the Garfield County Fairground for over 170 participants.
Speakers from Federal, state and local governments, the community, industry and environmental consultants, and conservation groups focused presentations and discussion on a greater understanding of what Best Management Practices (BMPs) are appropriate to the western slope of Colorado and how they are integrated into developments.
Slides: Rifle, Silt, New Castle Community Development Plan: A Collaborative Planning Approach To Natural Gas Development, Peggy Utesch
Slides: Rifle, Silt, New Castle Community Development Plan: A Collaborative Planning Approach To Natural Gas Development, Peggy Utesch
Best Practices for Community and Environmental Protection (October 14)
Presenter: Peggy Utesch, Movin' Forward Consulting
25 slides
Slides: Innovative Best Practices For The Western Slope: Stormwater Management Solutions And Philosophy For The Oil And Gas Industry, Kyle N. Schildt
Slides: Innovative Best Practices For The Western Slope: Stormwater Management Solutions And Philosophy For The Oil And Gas Industry, Kyle N. Schildt
Best Practices for Community and Environmental Protection (October 14)
Presenter: Kyle N. Schildt, P.E., LT Environmental, Inc.
12 slides
Slides: Best Management Practices: Planning, Leasing, Permitting, Jamie Connell
Slides: Best Management Practices: Planning, Leasing, Permitting, Jamie Connell
Best Practices for Community and Environmental Protection (October 14)
Presenter: Jamie Connell, Northwest Colorado District Manager, U.S. Bureau of Land Management (BLM) Colorado
23 slides
Metrication In Highway Design And Operations, Taher A. Al-Fadhli
Metrication In Highway Design And Operations, Taher A. Al-Fadhli
Dissertations and Theses
The complex problem of metrication of highway design, construction and maintenance has been the subject of a number of studies and pilot projects carried out by the Federal Highway Administration (F.H.W.A.) of the United States and the Roads and Transportation Association of Canada. Through a research grant, the FHWA of the U.S.A. assigned the Ohio Department of Transportation, the Illinois Department of Transportation and the Oregon Highway Division to design, construct, and maintain these metric projects. The author has reviewed the experience and conclusions of these studies and the problems encountered in the pilot projects relative to the design, survey, …
A Traffic Study And Comprehensive Transportation Plan For Palm Beach County, Florida, Division Of Traffic & Planning Florida State Road Department, Board Of County Commissioners Palm Beach County Florida
A Traffic Study And Comprehensive Transportation Plan For Palm Beach County, Florida, Division Of Traffic & Planning Florida State Road Department, Board Of County Commissioners Palm Beach County Florida
City and Regional Planning -- Florida
A traffic and transportation plan for Palm Beach County, Florida June 1, 1959
Location And Economic Study For Interstate Route Tallahassee, Wilbur Smith And Associates
Location And Economic Study For Interstate Route Tallahassee, Wilbur Smith And Associates
City and Regional Planning -- Florida
The basic purpose of the study was to determine the best location for the construction of an East-West section of the interstate highway. It was prescribed that the work would consist of two basic parts. One had to do with the analysis of travel data, both present and projected, in the determination of the most feasible location of a route based on conventional traffic and highway development factors. The other phase of the work was to deal with economic considerations, especially the economic impact of the proposed routes on businesses located on existing roads and on the central business district …