Consideration Of Probability Assessments Relevant To Hazard And Risk For Landslides, R N. Chowdhury, P N. Flentje Jan 1999

Consideration Of Probability Assessments Relevant To Hazard And Risk For Landslides, R N. Chowdhury, P N. Flentje

Faculty of Engineering and Information Sciences - Papers: Part A

Probability of occurrence is the most important component of landslide hazard and risk and this paper outlines different approaches for its assessment. The reasons for the popularity of qualitative approaches are first outlined. Quantitative approaches can be best applied if the important influencing factors and issues are fully understood. Formal probabilistic approaches are often based on geotechnical models or on a combination of hydrological and geotechnical models. The paper also highlights the situations for which the performance function must be formulated in terms of lateral displacements rather than the conventional safety factor. Reference is then made to a procedure, based …


Geotechnical Assessment And Management Of 148 Landslides Triggered By A Major Storm Event In Wollongong, Australia, P N. Flentje, R N. Chowdhury Jan 1999

Geotechnical Assessment And Management Of 148 Landslides Triggered By A Major Storm Event In Wollongong, Australia, P N. Flentje, R N. Chowdhury

Faculty of Engineering and Information Sciences - Papers: Part A

On the 17th August 1998 a severe rainfall event occurred over a widespread area of the City of Wollongong. During this storm, 1 person drowned and an estimated $50 to $100 million damage was caused to the City of Wollongong. Road access to the City was cut by raised water levels and debris flows covering and or scouring road and rail routes for up to 36 hours following this event. A geotechnical team of 3, including the first author, was organised at very short notice during the response phase of the emergency operations on the early morning of the 20th …